Professional Documents
Culture Documents
TNT PH 2 PLDT ROSARIO - As-Built Plan
TNT PH 2 PLDT ROSARIO - As-Built Plan
2449 8311
NEW ENCLOSURE
NEW REUSE OF EXISTING
EQUIPMENT DOOR
(6PM-6AM)
STANDBY
PACU-2
54 600
57
600 600 600 600 350 650 600 600 600 595
(6AM-6PM)
RUNNING
CE-2 SCALE: 1:100
PACU-1
600
863
600 600 600 600 600 600 600 600
2129
FUTURE FUTURE FUTURE FUTURE PROP.
1200 PLDT PLDT PLDT PLDT SMART
TNT FIBER
RACK1 ODF 1603
3028 EQP'T EQP'T EQP'T EQP'T CEN HOME
LOT 3
1000 D2 NEW
SWITCHING ROOM STEEL DOOR
UPCOMING
TNT-5TR
1051
FCU-3
CEILING HEIGHT: 3.793 m 600
5338 600 600 600 600 600 600 600 900
1440
NEW
FUTURE FUTURE FUTURE FUTURE FUTURE FUTURE
PLDT PLDT PLDT PLDT PLDT PLDT LOT 1
EQP'T EQP'T EQP'T EQP'T EQP'T EQP'T CISCO
ODF
Y2
2310
LEGEND:
2470
EXISTING
1710
EXISTING FCU
600
8737
A'
PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.
TNT PHASE 2 - CIVIL WORKS
NETWORK SUPPORT FACILITIES ROOM RENOVATION AT PLDT
ROSARIO
Project Management
PROJECT ADDRESS: ENGR. MONICA SHAYNE VILLAFUERTE
IAN KRISTIAN DEL E. INGRESO
IMPLEMENTATION MANAGER
TREVOR CADAG
REGIONAL PM
LUCBAN, REGINE MAE P.
PM
PALOMAR, DEBORAH R.
TEAM HEAD
RIVERA, RICARDO D.
DIVISION HEAD
CE-1/CE-3
CORPORATION
MARSEILLA, ROSARIO, CAVITE PROFESSIONAL CIVIL ENGINEER DATE: OCTOBER 22, 2021 DATE: OCTOBER 22, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE:
4"THK CHB
100mm anchored
10mm REBAR 10mm rebar
epoxy/grout
PARTITION WALL
2 DETAIL A
CE-3 SCALE: NTS
A
PLASTER
PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.
TNT PHASE 2 - CIVIL WORKS
NETWORK SUPPORT FACILITIES ROOMRENOVATIONAT PLDT
ROSARIO
Project Management
PROJECT ADDRESS: ENGR. MONICA SHAYNE VILLAFUERTE
IAN KRISTIAN DEL E. INGRESO
IMPLEMENTATION MANAGER
TREVOR CADAG
REGIONAL PM
LUCBAN, REGINE MAE P.
PM
PALOMAR, DEBORAH R.
TEAM HEAD
RIVERA, RICARDO D.
DIVISION HEAD
CE-2/CE-3
CORPORATION
MARSEILLA, ROSARIO, CAVITE PROFESSIONAL CIVIL ENGINEER DATE: OCTOBER 22, 2021 DATE: OCTOBER 22, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE:
FASTENER
900 B
DOOR FRAME
100 x 50 x 3m TABULAR
DETAIL B
2300
2100
S FFL
SECTION- AA'
ES NAT N: ELEVATION
ESC T N:S N
T S L E ATE STEEL
S ANEL NE C NS LAT N C
N S S N LE A ET A A
N N TS:
DOOR HANDLE
1 Satellite Bodega 60MM THICK PLAIN METAL SHEET
100 x 50 x 3m HORIZONTAL TUBULAR
SCALE: NTS
CE-4 100 x 50 x 3m VERTICAL TUBULAR
4" x 4.5"
ISOMETRIC VIEW OF DOOR
HINGE DOOR SPECS:
- LEC STEEL
DETAIL C - 1 1/2 HR FIRE RATED
DETAIL A
2 DOOR DETAILS
CE-4 SCALE: NTS
PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.
TNT PHASE 2 - CIVIL WORKS
ROOM RENOVATION AT PLDT
NETWORK SUPPORT FACILITIES
ROSARIO
Project Management
PROJECT ADDRESS: ENGR. MONICA SHAYNE VILLAFUERTE
IAN KRISTIAN DEL E. INGRESO
IMPLEMENTATION MANAGER
TREVOR CADAG
REGIONAL PM
LUCBAN, REGINE MAE P.
PM
PALOMAR, DEBORAH R.
TEAM HEAD
RIVERA, RICARDO D.
DIVISION HEAD
CE-3/CE-3
CORPORATION
MARSEILLA, ROSARIO, CAVITE PROFESSIONAL CIVIL ENGINEER DATE: OCTOBER 22, 2021 DATE: OCTOBER 22, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE: