A

2449 8311

EXISTING PIPECHASE WALL LADDER

NEW ENCLOSURE
NEW REUSE OF EXISTING
EQUIPMENT DOOR

4408 TNT 5TR TNT 5TR


FCU - 5 FCU - 1
SATELLITE BODEGA 1047
12.68 SQM
1887 400
2327

(6PM-6AM)
STANDBY
PACU-2
54 600
57
600 600 600 600 350 650 600 600 600 595

B B' 600 UTAG UTAG UTAG


CABLE ACCESS
CABLE ACCESS
HUAWEI
UTAG UTAG
DCPDB
939
NEW.DCPDB
D1 DCPDB 1&2

1000 2 SECTION A-A' VIEW


10586

(6AM-6PM)
RUNNING
CE-2 SCALE: 1:100

PACU-1
600
863
600 600 600 600 600 600 600 600

2129
FUTURE FUTURE FUTURE FUTURE PROP.
1200 PLDT PLDT PLDT PLDT SMART
TNT FIBER
RACK1 ODF 1603
3028 EQP'T EQP'T EQP'T EQP'T CEN HOME
LOT 3

1000 D2 NEW
SWITCHING ROOM STEEL DOOR
UPCOMING
TNT-5TR
1051
FCU-3
CEILING HEIGHT: 3.793 m 600
5338 600 600 600 600 600 600 600 900
1440
NEW
FUTURE FUTURE FUTURE FUTURE FUTURE FUTURE
PLDT PLDT PLDT PLDT PLDT PLDT LOT 1
EQP'T EQP'T EQP'T EQP'T EQP'T EQP'T CISCO
ODF
Y2
2310

LEGEND:
2470
EXISTING
1710
EXISTING FCU

600

3 SECTION B-B' VIEW


CE-2 SCALE: 1:100

8737

A'

1 FLOOR PLAN (2ND FLOOR)


CE-2 SCALE: 1:100

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.
TNT PHASE 2 - CIVIL WORKS
NETWORK SUPPORT FACILITIES ROOM RENOVATION AT PLDT
ROSARIO
Project Management
PROJECT ADDRESS: ENGR. MONICA SHAYNE VILLAFUERTE
IAN KRISTIAN DEL E. INGRESO
IMPLEMENTATION MANAGER
TREVOR CADAG
REGIONAL PM
LUCBAN, REGINE MAE P.
PM
PALOMAR, DEBORAH R.
TEAM HEAD
RIVERA, RICARDO D.
DIVISION HEAD
CE-1/CE-3
CORPORATION
MARSEILLA, ROSARIO, CAVITE PROFESSIONAL CIVIL ENGINEER DATE: OCTOBER 22, 2021 DATE: OCTOBER 22, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE:
4"THK CHB

100mm anchored
10mm REBAR 10mm rebar

epoxy/grout

PARTITION WALL
2 DETAIL A
CE-3 SCALE: NTS
A

PLASTER

CHB IN 4'' THK


100 mm anchored
RSB 10mm GRADE 33, 600mm B epoxy/grout 150
SPACING BOTH WAYS 10mm rebar

1:4 CEMENT SAND MIXTURE

PARTITION WALL PARTITION WALL


1 ISOMETRIC VIEW 3 DETAIL B
CE-3 SCALE: NTS CE-3 SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.
TNT PHASE 2 - CIVIL WORKS
NETWORK SUPPORT FACILITIES ROOMRENOVATIONAT PLDT
ROSARIO
Project Management
PROJECT ADDRESS: ENGR. MONICA SHAYNE VILLAFUERTE
IAN KRISTIAN DEL E. INGRESO
IMPLEMENTATION MANAGER
TREVOR CADAG
REGIONAL PM
LUCBAN, REGINE MAE P.
PM
PALOMAR, DEBORAH R.
TEAM HEAD
RIVERA, RICARDO D.
DIVISION HEAD
CE-2/CE-3
CORPORATION
MARSEILLA, ROSARIO, CAVITE PROFESSIONAL CIVIL ENGINEER DATE: OCTOBER 22, 2021 DATE: OCTOBER 22, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE:
FASTENER

900 B
DOOR FRAME

100 x 50 x 3m TABULAR

DETAIL B

2300
2100

S FFL

SECTION- AA'
ES NAT N: ELEVATION
ESC T N:S N
T S L E ATE STEEL
S ANEL NE C NS LAT N C

N S S N LE A ET A A

C NA ENT ANCE E E LE E L C SECTION BB'

N N TS:
DOOR HANDLE
1 Satellite Bodega 60MM THICK PLAIN METAL SHEET
100 x 50 x 3m HORIZONTAL TUBULAR
SCALE: NTS
CE-4 100 x 50 x 3m VERTICAL TUBULAR
4" x 4.5"
ISOMETRIC VIEW OF DOOR
HINGE DOOR SPECS:
- LEC STEEL
DETAIL C - 1 1/2 HR FIRE RATED

DETAIL A
2 DOOR DETAILS
CE-4 SCALE: NTS

PROJECT TITLE: PREPARED BY: NOTED BY: REVIEWED BY: CHECKED BY: APPROVED BY: SHEET NO.
TNT PHASE 2 - CIVIL WORKS
ROOM RENOVATION AT PLDT
NETWORK SUPPORT FACILITIES
ROSARIO
Project Management
PROJECT ADDRESS: ENGR. MONICA SHAYNE VILLAFUERTE
IAN KRISTIAN DEL E. INGRESO
IMPLEMENTATION MANAGER
TREVOR CADAG
REGIONAL PM
LUCBAN, REGINE MAE P.
PM
PALOMAR, DEBORAH R.
TEAM HEAD
RIVERA, RICARDO D.
DIVISION HEAD
CE-3/CE-3
CORPORATION
MARSEILLA, ROSARIO, CAVITE PROFESSIONAL CIVIL ENGINEER DATE: OCTOBER 22, 2021 DATE: OCTOBER 22, 2021 PLDT INC PLDT INC. PLDT INC.
DATE: DATE: DATE: