0001-01-022 HWDP 5''

You might also like

Download as pdf
Download as pdf
You are on page 1of 4
eet Erol iP somsrmogeys avout 811220} a oe INSPECTION REPORT FOR Heavy Weight Drill Pipe 5" | ZHONGMAN PETROLEUM AND NATURAL GAS y. rR Customer: EEN | Report No: ‘ZPEC 25/0001-01/22 Rotrances: (08-1)FIFTH EDITION, Volune3 /Cat 35 | ateof nection 04/11/2022 Work tneation RIGH2S-NORTH RUMIALA-BASRAIRAQ. | Total Number ofPases i708 Canary Cae 7 Cagay 2 a Catgary 3-5 “nual Conecion ue Y DancasnalS Ten checking 7 a aoa MPI Slip/Upset/ center Pad Areas v Black Ligh Connection ¥_ Profile Gauge ca Josey » ‘ODS z Tometon Nes “Tota Joints Toeal Accepjoinis 3 Total ned repair joints Total Rejeet Joins or Fa Joins es Works sir a ° Pos 0 Pan Bos 0 1 it Bax HiowiPn 0 ARJoueener put 0 tite robe Pe @ |_| 0 box . 0 | Black Dimensional 3 Inspection Visual & MPI Inspection EMPL seer ge Pin Box g | g is 2/2) 2/s/elelels| 2/8/58 ' slsl@—eyciaial ©] 2] s/ 2] >] =] $=) S/S) =] = ESSE § €]8|3) Js] ./4|& Sisley egsde§ | 12/2] s]Slaf*/*]8]sig/2) 18} sislsis| FETE | | S{s]S| I a) a) 3 mane" | s g sero1s |x| ox | or | ae fox | on a arocrsars F 6 80 eine firs” 2 [5 2420514 eine 1 2 3 | 232ns14 | «| ox | | ox | ox | ox 4 5 eine 55n6 pNP | eine Bie] aa Syi0 "4" 0 K"| ort 2api214 | ox| ox | ox | s | ox | ox a 3 NP NP Gine"| eu" Sane" was" BH" Bie ‘2701214 | ox | of | ox | ox | ox | ox | or | ox| 6 | spr21s | ox] ox| ox | ox] ox] ox | ox | ox | 5%" 3" NP NP 6i/18"| 6%" Sats” "| NP__NP | 61/16") 20" 17%" 7 | zzarsis | ox| ox| ox | s [or] 5 [ox ox| ox" 3" np | NP ise] 6%" Sse 15 "(22 1| 54" | 2aaesra [ox | or] ox| ox | ox | ox] ox ox | 6x" 3” NP NP 611s] 6K" 55/16 15" [22 9" 2a lize] on | ox | aie" sine| 6%" | 5576 9 | aapsis [ox] ox | ox| o« | ox NP NP ine] 6H" Say" se" 4" OH" ine lin wI7 W'| Fm on ox | 6" Retiee TN Strees Relief Feature Found in The Connections Bur lave Ren Waived By The Customer At Time OFT Inspection] Conclusion: (Go) Joints Above Inspected And Were Found "Accepted" at time of Inspection. sei [GR | Tee a a [eee ars inde = tae FR eerie ie a a Date OF Issue Inspector ‘Supervisor ‘Mandouk Esenkioury | of/11 (2022 ash SNT Level HVT, LPT, MT, UF Alimed Samy PS EPO JF ronsamnasv paar INSPECTION REPORT FOR Heavy Weight Drill Pipe 5° Tenstomen THONGMAN PETROLEUM AND NATURAL GAS custome af feport No: 01-01 /2: “ GROUPCOLTD{ZPEC) sept 2 Pez /pOnio 722 Retranees: (DS-1)FIFTH EDITION, Volume3 / Cat. 3-5 Date of Inspection: 04/11 / 2022 Work Location: RIG#25-NORTH RUMIALA-BASRA-IRAQ “Total Number of Pages 02/04 Caiogary Catosary x x Catogary 35 Visual Connection © Tube ¥ Dimensional 7 Tea Checkang v Se center Fad A ‘ Hack Ligh Connection Profile Gage “ Fe Jopstunuany [ opsie 5 Cones wes ral Joins 3 Tolpis B Fou need pair jins 9“ a oan Net Worship si ox ° vm 0 Pan Bx ° M0dom Boe 0 WB Jom Pin 0———« MB om comerpat 0 Terk Tbe o || vin ° Box io Visual & MPI | Black |_ ‘Dimensional 3 Inspection | Inspection Light Pin Box Body | ] [els lel2] 3 > = . Ss = é sl<|3 fs] el] = = 3 &|8]3) =a & 7 |e : 5 - = : é : : > a -|- - - « | | T= ~ of 7 a | T= altel = =| 0 - a] =| | Ty - ae Pa ~|-Tl- | Nate T rex Fete Fetare Founda The Connections But Hove Been Waived ly The Customer Ar Time OF The Trspectiok, ‘Conelusions (1) Joint Above Inspected And Was Found " Internal Piting Rejected". at time of Inspection. Abberaone ment so Date Of Issue Inspector ‘Supervisor tamdou EC sanfoury 04/11 (2022 er Ane Sam A ape aS

You might also like