Ref: MDCG/MF/01/5387 15 September 2021

Mr. Chen Yongjian


Authorized Representative CGGC-DESCON JV
Khaista Communications and TCS Office,
Garangi Road Miraj Khan Market Near Liaqat Super Store,
Shabqadar, Charsadda, Khyber Pakhtunkhwa.

Dear Mr. Chen,

MOHMAND DAM HYDROPOWER PROJECT


SPILLWAY – RIGHT TRAINING WALL – REVISED SHOP DRAWINGS OF FOUNDATION
POUR PLAN, CONCRETE OUTLINE PLAN, SECTIONS & DETAILS

1. CDJV-MDHP-MDCG-2021-2497 dated: 09 March 2021


2. CDJV-MDHP-MDCG-2021-2528 dated: 16 March 2021
3. CDJV-MDHP-MDCG-2021-2607 dated: 02April2021
4. MDCG/MF/01/4179 dated: 12 April 2021
5. MDCG/MF/01/4181 dated: 12 April 2021
6. MDCG/MF/01/4296 dated: 29 April 2021
7. CDJV-MDHP-MDCG-2021-2855 dated: 13 May 2021
8. MDCG/MF/01/4587 dated: 04 June 2021
9. CDJV-MDHP-MDCG-2021-3011 dated: 19 June 2021
10. MDCG/MF/01/4820 dated: 06 July 2021
11. CDJV-MDHP-MDCG-2021-3348 dated: 16 August 2021

We have received the Revised Shop Drawings of Spillway Right Training Wall with your letter
at ref. (11). The drawings have been reviewed and found acceptable with some corrections
as marked on drawings.
The drawings are being sent to you with the status as marked. You may proceed accordingly.

Yours sincerely,

Mark Fox
Project Manager / Construction Manager
Mohmand Dam Consultants Group (MDCG)
TUR

Attachments: 1. Shop Drawings - 14 No. A3 pages

Copy to: 1. General Manager / PD (MDHP), WAPDA


2. Mirza Asif Baig, Zafar Ahmed, Arif Mahmood, Rao Awais Khan, Ajmal
Saleemi, Dr. Shahzad Rahman, Tahir Ur Rehman, Tariq Javed Bhatti,
Muhammad Moeen, Arshad Latif, M. Umar, Sajjad Hussain 

Page 1 of 15
 
SHOP DRAWING


SPILLWAY
 
 
 

76 S 
174

(3
y &W  

1
Ke

of 4

W ith 
.
. Jt

)
t  
Con 
 

 

Cont. Jt. With Key & WS 


19105
RIGHT TRAINING WALL

LOCATION PLAN RTWF-P#2


P#2

8
18
25
~UPSTREAM~

1906
FLOW

8
RTWF-P#3 08
2 155
CJ. With Key & WS (3 CJ. With Key & WS 4
of 4)
(4 of

550
3
4)

2 25
1957 183

19066
Cont. Jt. With WS
-P# 5
T W F
1379

R RTWF-P#4

1960
6
8324

2
RTWF-P#1
W
WF
4 2200
22661
f 4) 79
(4 o 61 THE EMPLOYER: PAKISTAN

1
3

WATER AND POWER DEVELOPMENT AUTHORITY


(WAPDA)
Correct outline, refer to IFC drawings 191 5
530
THE ENGINEER:

'SPW-1117-R1' and 'SPW-1030-R1' 06

79
2

21
ABBREVIATIONS: THE CONTRACTOR:

CGGC-DESCON Joint Venture DESCON


RTWF-P RIGHT TRAINING WALL FOUNDATION POUR
RTWF-P-L
RTW-P
RIGHT TRAINING WALL FOUNDATION POUR LIFT
RIGHT TRAINING WALL POUR
RIGHT TRAINING WALL FOUNDATION POUR PLAN MOHMAND DAM HYDROPOWER PROJECT
RTW-P-L RIGHT TRAINING WALL POUR LIFT ACCESS ROAD DESIGN
TYP. TYPICAL (SCALE 1:250)
EL. ELEVATION
WS WATER STOPPER SPILLWAY RIGHT TRAINING WALL
CJ CONSTRUCTION JOINT FOUNDATION POUR PLAN
Cont. Jt. CONTRACTION JOINT
P POUR Rev. Date Prepeared Checked Endorsed Desription DRAWN R.A 2021.08.15 ENGINEER 'S DRAWING NO.
L LIFT
0 2021.03.29 R.A M.B E.U.H SUBMISSION FOR APPROVAL DESIGNED - - MDCG-IFC-SPW-1026-R3
1 2021.05.01 R.A M.B E.U.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
2 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-002-R3
3 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 1 of 4
SHOP DRAWING

SPILLWAY

(3
&W
Key

1
of 4
ith
t. W

)
.J
C ont

Cont. Jt. With Key & WS

RIGHT TRAINING WALL

LOCATION PLAN
~UPSTREAM~

FLOW

ABBREVIATIONS:

P#A
2 RTWF-P RIGHT TRAINING WALL FOUNDATION POUR

CJ. With Key & WS W - RTWF-P-L RIGHT TRAINING WALL FOUNDATION POUR LIFT
(3 of 4
RT 4 RTW-P RIGHT TRAINING WALL POUR
) RTW-P-L RIGHT TRAINING WALL POUR LIFT
(4 of

TYP. TYPICAL
EL. ELEVATION
3

WS WATER STOPPER
CJ CONSTRUCTION JOINT
4)

Cont. Jt. CONTRACTION JOINT


CJ. With WS P POUR
L LIFT

Cont. Jt. With WS


W -P#B
RT
-P #C
RTW

4
f 4)
(4 o THE EMPLOYER: PAKISTAN

1
3

WATER AND POWER DEVELOPMENT AUTHORITY


(WAPDA)
Correct outline, refer to IFC drawings THE ENGINEER:
'SPW-1117-R1' and 'SPW-1030-R1'
2

THE CONTRACTOR:

RIGHT TRAINING WALL CGGC-DESCON Joint Venture DESCON

WALL POUR PLAN NOTE:- MOHMAND DAM HYDROPOWER PROJECT


ACCESS ROAD DESIGN
1. THIS DRAWING SHALL BE READ IN CONJUNCTION
(SCALE 1:250) WITH RELEVANT NOTES MENTIONED ON DRAWING
MD-L2-TSW-21-002-R3 (SHEET 1 of 4). SPILLWAY RIGHT TRAINING WALL
WALL POUR PLAN
Prepeared Desription ENGINEER 'S DRAWING NO.
Rev. Date Checked Endorsed DRAWN R.A 2021.08.15
0 2021.03.29 R.A M.B E.U.H SUBMISSION FOR APPROVAL DESIGNED - - MDCG-IFC-SPW-1026-R3
1 2021.05.01 R.A M.B E.U.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
2 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-002-R3
3 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 2 of 4
SHOP DRAWING

PARAPET WALL

1200
1200
PARAPET WALL
EL: 565.20
RTW-PA-L24
EL: 565.20
EL: 564.00 RTW-PA-L24 EL: 564.00
RTW-PA-L23

0
1000
EL: 563.00 RTW-PA-L23 EL: 563.00

1000
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1

1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
RTW-PA-L22 EL: 561.50 RTW-PA-L22
EL: 561.50

RTW-PA-L21 EL: 560.00 RTW-PA-L21


EL: 560.00

RTW-PA-L20 EL: 558.50 RTW-PA-L20


EL: 558.50
RTW-PA-L19 EL: 557.00 RTW-PA-L19
EL: 557.00
RTW-PA-L18
W-PA-L EL: 555.50 RTW-PA-L18

17871
EL: 555.50
RTW-PA-L17
W-PA-L1 1 EL: 554.00 RTW-PA-L1
RTW-PA-L17
EL: 554.00
RTW-PA-L16
W-PA-L16 EL: 552.50 RTW-PA-L1
RTW-PA-L16
EL: 552.50 3
RTW-PA-L15
W-PA-L15 EL: 551.00 RTW-PA-L15
EL: 551.00
RTW-PA-L14
W-PA-L14 EL: 549.50 RTW-PA-L14
EL: 549.50
RTW-PA-L13
W-PA-L13 EL: 548.00 RTW-PA-L1
RTW-PA-L13

35200
WALL
EL: 548.00
RTW-PA-L1
RTW-PA-L12
34000
WALL

EL: 546.50 RTW-PA-L12


W-PA-L12 EL: 546.50
EL: 546.129
RTW-PA-L11
W-PA-L11 EL: 545.00 RTW-PA-L1
RTW-PA-L11
EL: 545.00
RTW-PA-L10
-PA-L10 EL: 543.50 RTW-PA-L10
EL: 543.50
RTW-PA-L9
PA L9 EL: 542.00 RTW-PA-L9 ABBREVIATIONS:
EL: 542.00
RTW-PA-L8
PA L8 EL: 540.50 RTW-PA-L
RTW-PA-L8 RTWF-P RIGHT TRAINING WALL FOUNDATION POUR
EL: 540.50 RTWF-P-L RIGHT TRAINING WALL FOUNDATION POUR LIFT
RTW-PA-L7
PA L7 EL: 539.00 RTW-PA-L7 RTW-P RIGHT TRAINING WALL POUR
EL: 539.00 RTW-P-L RIGHT TRAINING WALL POUR LIFT

16129
RTW-PA-L6
PA L6 EL: 537.50 RTW-PA-L6 TYP.
EL.
TYPICAL
ELEVATION
EL: 537.50

TYP.
1500
WS WATER STOPPER
RTW-PA-L5
W-PA-L5 EL: 536.00 RTW-PA-L5 CJ CONSTRUCTION JOINT

T
1
EL: 536.00 C.J
C J Cont. Jt. CONTRACTION JOINT
RTW-PA-L4
A L4
C.J
Typ. EL: 534.50 RTW-PA-L4 Typ.
y P POUR
EL: 534.50 L LIFT
RTW-PA-L3
A L3 EL: 533.00 RTW-PA-L3
EL: 533.00
RTW-PA-L2
A L2 EL: 531.50 RTW-PA-L2
EL: 531.50
RTW-PA-L1
A L1 EL: 530.00 RTW-PA-L1
TW-PA-L1 EL: 530.00
EL: 530.00 EL: 530.00

000
RTWF-
RTWF-P3-L9 RTWF P1 L14
RTWF-P1-L14
0 2000

RTWF P2 L9
RTWF-P2-L9 RTWF P4 L15
RTWF-P4-L15

0 20
EL: 528.00

0 1500
C.J
C .J
J RTWF-P3
RTWF-P3-L8 RTW
RTWF-P1-L13
1500

EL: 526.50
RTWF-P2-L
RTWF-P2-L8 Typ.
T RTW
RTWF-P4-L14

P.
00
RTWF P3 L7
RTWF-P3-L7 RTWF P1 L12
RTWF-P1-L12

TYP
YP
P
0
0 150
EL: 525.00
RTWF P2 L7
RTWF-P2-L7 RTWF P4 L13
RTWF-P4-L13
C.J With Keys
y & WS
FOUNDATION

00
C.J
C J With Keys
y & WS RTWF-P3-L6
RTWF P3 L6 RTWF-P1-L11
RTWF P1 L11 NOTE:-
FOUNDATION

50
150
1500

RTWF P2 L6
RTWF-P2-L6 RTWF-P4-L12
RTWF P4 L12
5

14000

EL: 523.50
14000

1. THIS DRAWING SHALL BE READ IN CONJUNCTION

0 1500
RTWF-P3-L5 RTWF-P1-
RTWF-P1-L10
7500 1500

RTWF-P2-L5 RTWF-P4-
RTWF-P4-L11 WITH RELEVANT NOTES MENTIONED ON DRAWING

1
EL: 522.00 C.J
C J
1

MD-L2-TSW-21-002-R3 (SHEET 1 of 4).

0 1500
RTWF-P3-L4 RTWF-
RTWF-P1-L9

18000
7500
0 1500

EL: 520.50
RTWF-P2-L4 RTWF-P
RTWF-P4-L10 Typ.
1

00
RTWF P3 L3
RTWF-P3-L3 RTWF P1 L8
RTWF-P1-L8

50
500 150
00

RTWF P2 L3
RTWF-P2-L3 RTWF P4 L9
RTWF-P4-L9 PAKISTAN
50 150

THE EMPLOYER:
EL: 519.00
WATER AND POWER DEVELOPMENT AUTHORITY
RTWF-P3-L2
RTWF P3 L2 RTWF-P1-L7
RTWF P1 L7
500

RTWF-P2-L2
RTWF P2 L2 RTWF-P4-L8
RTWF P4 L8 (WAPDA)

5
0 15
15
5

EL: 517.50

1500
RTWF-P3-L1 RTWF-
RTWF-P1-L6 THE ENGINEER:
1500

EL: 516.00
RTWF-P2-L1 RTWF-P
RTWF-P4-L7
1

0
2000 1500 1500 1500 1500
RTWF-P1-
RTWF-P1-L5
1500 1500 1500 1500 1500 1500

EL: 514.50
RTWF-P4-L6
RTWF P4 L6 EL: 514.50

RTWF-P4-L
RTWF-P4-L5 EL: 513.00
RTWF-P1-L
RTWF-P1-L4 THE CONTRACTOR:
EL: 513.00 CGGC-DESCON Joint Venture DESCON
RTWF-P4-
RTWF-P4-L4 EL: 511.50
RTWF-P1-L3
RTWF P1 L3 EL: 512.00
EL: 511.50 MOHMAND DAM HYDROPOWER PROJECT
RTWF-P4-
RTWF-P4-L3 RTWF-P1-L
RTWF-P1-L2 ACCESS ROAD DESIGN

4000
EL: 510.00
EL: 510.00

EL: 508.50
RTWF-P4
RTWF-P4-L2 RTWF-P1-L1
TWF-P1- SPILLWAY RIGHT TRAINING WALL
SECTION 2-2 EL: 508.00 EL: 508.00
RTWF-P4
RTWF-P4-L1 (SCALE 1:250) LAYOUT OF LIFTS
EL: 507.00 (Sheet 1 of 4)
Prepeared Desription ENGINEER 'S DRAWING NO.
Rev. Date Checked Endorsed DRAWN R.A 2021.08.15
SECTION 1-1 MDCG-IFC-SPW-1027-R0
0 2021.03.29 R.A M.B E.U.H SUBMISSION FOR APPROVAL DESIGNED - -
(SCALE 1:250) MDCG-IFC-SPW-1028-R0
(Sheet 1 of 4) 1 2021.05.01 R.A M.B E.U.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
2 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-002-R3
3 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 3 of 4
SHOP DRAWING

Ø10500

1200
3000
EL: 565.20 EL: 565.20
EL: 531.955
EL: 564.00 RTW-PA-L24 EL: 564.00

1500 1500 1500 1500 1500 1500 1500 1500 2000 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1000
0
RT
RTW-PA-L23
A L23 EL: 563.00

RT
RTW-PA-L2
RTW-PA-L22
T PA L22 EL: 561.50 EL: 528.50 RTW-PC-L8
RTW-PA-L21
W-PA-L21 EL: 560.00 EL: 527.00
RTW-PC-L7
RTW-PA-L20
W-PA-L20 EL: 558.50 EL: 525.50
RTW-PC-L6
ABBREVIATIONS:
RTW-PA-L19
TW-PA-L19 EL: 557.00 EL: 524.00
RTW-PC-L5
RTWF-P RIGHT TRAINING WALL FOUNDATION POUR
RTWF-P-L RIGHT TRAINING WALL FOUNDATION POUR LIFT RTW-PA-L18
TW-PA-L18 EL: 555.50 EL: 522.50
RTW-PC-L4
RTW-P RIGHT TRAINING WALL POUR
C.J
C.J
C
RTW-P-L
TYP.
RIGHT TRAINING WALL POUR LIFT
TYPICAL
RTW-PA-L17
TW-PA-L17 EL: 554.00 EL: 521.00
RTW-PC-L3 Typ.
EL. ELEVATION

TYP.
RTW-PA-L16
TW-PA-L16

1500
WS WATER STOPPER EL: 552.50 EL: 519.50
RTW-PC-L2
CJ CONSTRUCTION JOINT C.J With WS
Cont. Jt. CONTRACTION JOINT RTW-PA-L15
TW-PA-L15 EL: 551.00 EL: 518.00
RTW-PC-L1
P POUR C.J
J
RTW-PA-L14
TW-PA-L14
4

0
500
0 1500
L LIFT
EL: 549.50 EL: 516.50 Typ.
T RTWF-P5-L3
RTW-PA-L13
TW-PA-L13
PA

1500
EL: 548.00 EL: 515.00 RTWF-P5-L2

35200
WALL
RTW-PA-L12
TW-PA-L12
T
TWW EL: 546.50 RTWF-P5-L1
SEE DETAIL # X
RTW-PA-L11
TW-PA-L11 EL: 545.00
RTW-PA-L10
TW-PA-L10 EL: 543.50 SECTION 3-3
C.J
C J (POUR - 5)
Typ. RTW-PA-L9
TW-PA-L9 EL: 542.00 (SCALE 1:250)
(Sheet 1 of 4)
WS (Typ.)
( yp ) RTW-PA-L8
TW-PA-L8 EL: 540.50
RTW-PA-L7
W-PA-L7 EL: 539.00
EL: 538.629
RTW-PA-L6
TW-PA-L6 EL: 537.50
C.J With WS
RTW-PA-L5
TW-PA-L5 EL: 536.00
RTW-PA-L4
W-PA-L4 EL: 534.50
RTW-PA-L3
TW-PA-L3 EL: 533.00 P5-L2 45
CHAMFERED AT 45°
° WITHOUT FORM WORK
TYP.
500
TYP

EL: 531.955 RTW-PA-L2


TW-PA-L2
15
15

EL: 531.50

RTW-PC-L8 RTW-PA-L1
TW-PA-L1 EL: 530.00

5
17
EL: 528.50 RTWF-P1-
RTWF-P1-L14 RTWF-P4-L15 P5-L1
P5 L1
EL: 528.00 1105
1.4
1 4
COPPER WATER EL: 527.00 RTW
TW-PC-L7
T W-PC-L7
W RTWF-P1-L1
RTWF-P1-L13 RTWF-P4-L14
1 EL: 526.50
RTW-PC-L6
RTW
R PC L6

150
STOPPER C.J
C J
EL: 525.50 RTWF P1 L12
RTWF-P1-L12 RTWF P4 L13
RTWF-P4-
RTWF-P4-L13 Typ. EL: 525.00
RTW-PC
RTW-PC-L5

FOUNDATION
EL: 524.00 RTWF-P1-L11
RTWF P1 L11 RTWF-P4-L12
RTWF P4 L12 EL: 523.50
RTW-
RTW-PC-L4

14000
C.J
C J
EL: 522.50
C.J
C J
RTWF-P1-L10 Typ. RTWF-P4-L11 EL: 522.00
YP.
500

RTW-PC-L3
RTW PC L3 DETAIL # X
YP

Typ.
Typ
TY

RTWF-P1-L9 RTWF-P4-L10
5
15

EL: 521.00
EL: 520.50 (SCALE 1:25)
RTW-PC-L2
RTW PC L2
EL: 519.50
C.J
C J Wi
With
W h WS
RTWF P1 L8
RTWF-P1-L8 RTWF P4 L9
RTWF-P4-L9 EL: 519.00
RTW-PC-L1 THE EMPLOYER: PAKISTAN
EL: 518.00 RTWF-P1-L7
RTWF P1 L7 RTWF-P4-L8
RTWF P4 L8 EL: 517.50 WATER AND POWER DEVELOPMENT AUTHORITY
P.
00

RTWF P5 L3
RTWF-P5-L3 (WAPDA)
TYPP
50
150

EL: VARIES
TY

EL: 516.00 RTWF-P1-L6


RTWF P1 L6 RTWF-P4-L7
1

THE ENGINEER:
EL: 516.00
EL:
E L: 515
5
515.00
15
5.0
00
00
RTWF P5
RTWF-P5-L2
P L2
C.J With Keys
y & WS
EL: VARIES
S RTWF-P5-L1
RTWF
RT
TWWF P
P55 L1 ABBREVIATIONS:
THE CONTRACTOR:
TYP. TYPICAL
SECTION 4-4 EL. ELEVATION CGGC-DESCON Joint Venture DESCON
(SCALE 1:250) WS WATER STOPPER
(Sheet 1 of 4) CJ CONSTRUCTION JOINT MOHMAND DAM HYDROPOWER PROJECT
Cont. Jt. CONTRACTION JOINT
ACCESS ROAD DESIGN
P POUR
L LIFT
W-L WALL LIFT SPILLWAY RIGHT TRAINING WALL
P5-WL POUR#5 WALL LIFT
LAYOUT OF LIFTS
NOTE:- Rev. Date Prepeared Checked Endorsed Desription DRAWN R.A 2021.08.15 ENGINEER 'S DRAWING NO.

1. THIS DRAWING SHALL BE READ IN CONJUNCTION 0 2021.03.29 R.A M.B E.U.H SUBMISSION FOR APPROVAL DESIGNED - - MDCG-IFC-SPW-1029-R1
WITH RELEVANT NOTES MENTIONED ON DRAWING 1 2021.05.01 R.A M.B E.U.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
MD-L2-TSW-21-002-R3 (SHEET 1 of 4). MD-L2-TSW-21-002-R3
2 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15
3 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 4 of 4
SHOP DRAWING

(8 of 10)


13
 
RTW-WP2
EL: 530.00
 SHEET (4 of 10)
SPILLWAY
 

1

  Cont. Jt. WITH
 KEY AND WS
07

4255
  262

  SHEET (9 of 10)


17
 

(9 o

 

f 10


)
  RTW-WP17

R7
Approach Slab TY P.)
 N (

70
AI

7920
  URT

00
RTW-WP11
TC
  OU
 GR

120
R7

00
 RIGHT TRAINING WALL

28
00
 
LOCATION PLAN

18
 ~UPSTREAM~ RTW-WP3

93
 EL: 530.00

4032
  3 RTW-WP4 COORDINATES OF RIGHT TRAINING
11
22 WALL WORK POINTS (RTW-WP)
( )

4
R1

(5 o

1906
 FLOW 85 CJ. WITH KEY AND WS
00 WORK
16
  EASTING NORTHING ELEVATION

f 10
POINT

8
)

400
RTW-WP1

R6
 3067711.124 1125373.602 564

12
RTW-WP10 23

500

0
147 RTW-WP2 3067726.116 1125400.034 530

30

0
  R1
43 ~SPILLWAY STRUCTURE~
R

0
  00 08 RTW-WP3 3067727.596 1125387.949 564
  155
  Cont. Jt. WITH KEY AND W
WS RTW-WP4 3067728.332 1125383.985 564

11
2

R6
  R2000 R158 RTW-WP5 3067731.002 1125362.183 515

13
0 00

11612
 
7139

00
  RTW-WP6 3067725.583 1125359.227 515
8
5

EL: 564.00
FACE
A SLAB CONNECTION RTW-WP7 3067724.066 1125357.663 512

SL :3V
10

1H
RTW-WP1 OUTLINE WITH

OP
RIGHT TRAINING WALL RTW-WP8 3067701.793 1125361.486 512
(7 of 10)

E
6

RTW-WP9 3067696.285 1125374.242 530


(6 of

R5250
CJ. WITH KEY AND WS
S RTW-WP9 CJ. WITH WS CJ. WITH KEY AND WS RTW-WP10 3067697.186 1125381.286 530
10)
7

25
183
(6 of

RTW-WP11 3067702.606 1125388.744 530


1379

1
1957
10)

RTW-WP12 3067677.005 1125360.192 512.83


(7 of 10)

R71
(TYP.) TYPICAL WATER RTW-WP13 3067676.996 1125368.516 518
RTW-WP13
TAIN

62
UR STOPPER
UT C EL: 518.00 PE
SLO .4H
RTW-WP17 3067710.760 1125393.805 530
Cont. Jt. WITH WS GRO FOUNDATION
1V:1

R4
750



R5
3

R9562
SLO V

823

8785
093
1H:3
4250

PE MDCG-IFC-SPW-1026 (R3)
1256

SLO .4H

0
PE

0
1V:1 EL: 530.00 MDCG-IFC-SPW-1027 (R0)

R5
6

PE MDCG-IFC-SPW-1028 (R0)
SLO H

64
.4
1V:1

94
MDCG-IFC-SPW-1029 (R1)

(8 of
642

3405

MDCG-IFC-SPW-1030 (R1)

R4
10)
0
1050

15
MDCG-IFC-SPW-1036 (R1)
3

R4
3000

12

30
MDCG-IFC-SPW-1037 (R0)

16
1960
RTW-WP5

30
MDCG-IFC-SPW-1038 (R0)

15
10)
SLO

EL: 530.00
8 (5 of
1H:3

56
2

10
RTW-WP12

67
MDCG-IFC-SPW-1039 (R1)
(8 of

00
11
PE

) THE EMPLOYER: PAKISTAN


f 10
V

(6 o

24
10)

WATER AND POWER DEVELOPMENT AUTHORITY


81

00
16
0

R153

(WAPDA)
100

13
15
R16381

R16882
2200

3
00
R18081
THE ENGINEER:
0)
760

f1 FACE SLAB LINE


(9 o
764

RTW-WP8
1V:4.91H

79
0
6

61
170

R4
10

Correct
21494outline, refer to IFC drawings

1
(6 of

THE CONTRACTOR:

06
R3
'SPW-1117-R1' and 'SPW-1030-R1'

79
CGGC-DESCON Joint Venture DESCON

30
5

91
21
10)

30
7

MOHMAND DAM HYDROPOWER PROJECT


9

120

RTW-WP7
)

LOT-2
f 10
(4 o

24410
2

SPILLWAY RIGHT TRAINING WALL


17

PLINTH REFERENCE LINE


SPILLWAY RIGHT TRAINING WALL CONCRETE OUTLINE PLAN RTW-WP6
CONCRETE OUTLINE PLAN
ENGINEER 'S DRAWING NO.
DRAWN R.A 2021.08.15
(SCALE 1:200) Prepeared Desription MDCG-IFC-SPW-1026-R3
Rev. Date Checked Endorsed DESIGNED - -
0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 1 of 10
SHOP DRAWING

(8 of 10)
13
1
(4
of 1
0)
58
239

7920
RTW-WP3

R7
28
00

4033
RTW-WP4

09
69
R1
43
00

EL: 516.00
2

9751
R158
00

4465
CJ. WITH KEY AND WS
Cont. Jt. WITH KEY AND WS

5
10
(7 of RTW-WP1
RTW-WP9 4905
10)
6
(6 of

14
10)

R5
7

20

2776
(6 of

115

09
15

SLOH:1V
0.3
0)

30
1
1957 f1
10)

1063

PE
o
(7 of 10)

(8

R71
14

27
6 118

62
RTW-WP13 65 15

00
CJ. WITH KEY AND WS 11

00
Cont. Jt. WITH WS
0)

24

R4
30
2 of 1

6933
10 (8

823
R9562

240
0.3H:1V
SLOPE
4.71

SL 3H:
SLO 1V

0
0.
1379

0
O 1V
PE
H:
PE

EL: 507.00
6

EL: VARIES 65
83 12505

67
8324

71

00
72

2504
NOTE:-
8 EL: 508.00
.

93

R4
RTW-WP12 1. THIS DRAWING SHALL BE READ IN CONJUNCTION

99

SL H:1V
9348
15

15
E
17

0) WITH RELEVANT NOTES MENTIONED ON DRAWING

OP
f1 RTW-WP5
17

30
(6 o

0.3
1V:4.91H

MD-L2-TSW-21-003-R2 (SHEET 1 of 10).

13
R16881

R18081
RTW-WP8
2200

1
22661 THE EMPLOYER: PAKISTAN

R3
24518 WATER AND POWER DEVELOPMENT AUTHORITY
6

91
10

Correct outline, refer to IFC drawings (WAPDA)


(6 of

30
0.3H E
:1V
P

'SPW-1117-R1' and 'SPW-1030-R1' THE ENGINEER:


)

SLO

79
f 10

21
10)

RTW-WP6
(4 o
7
9

RTW-WP7
7
THE CONTRACTOR:
24410
CGGC-DESCON Joint Venture DESCON

MOHMAND DAM HYDROPOWER PROJECT


LOT-2

SPILLWAY RIGHT TRAINING WALL CONCRETE OUTLINE PLAN AT EL: 516.00 SPILLWAY RIGHT TRAINING WALL
(SCALE 1 : 200) CONCRETE OUTLINE PLAN AT EL: 516.00
ENGINEER 'S DRAWING NO.
DRAWN R.A 2021.08.15
Rev. Date Prepeared Checked Endorsed Desription DESIGNED - - MDCG-IFC-SPW-1026-R3
0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 2 of 10
SHOP DRAWING

~ APPROACH SLAB ~

(8 of 10)
13
EL: 530.00

3067726.575
1125396.286

Cont. Jt
Jt. WITH KEY
E AND
D WS

3067726.745
1125394.896

00
EL: 530.00

3067714.326
10
1125375.538
(7 of

EL: 564.00
10)

CJ. WITH KEY AND WS


CJ. WITH KEY AND WS
3067730.216
3067676.996 3067714.657 1125368.599
1125368.168 1125374.178

TYPICAL WATER STOPPER


PER
(7 of 10)

FOUNDATION
Cont. Jt. WITH WS EL: 518.00

EL: 530.00
3067730.386
1125367.209
3067676.997
1125366.768
3067677.004
1125361.092
EL: 530.00
THE EMPLOYER: PAKISTAN
WATER AND POWER DEVELOPMENT
M AUTHORITY
(WAPDA)

13
THE ENGINEER:

3067677.005
1125359.692
Correct outline, refer to IFC drawings
10

THE CONTRACTOR:

'SPW-1117-R1' and 'SPW-1030-R1' CGGC-DESCON Joint Venture DESCON

MOHMAND DAM HYDROPOWER PROJECT


9

LOT-2

SPILLWAY RIGHT TRAINING WALL WATER STOPPER FOUNDATION PLAN NOTE:-


SPILLWAY RIGHT TRAINING WALL
1. THIS DRAWING SHALL BE READ IN CONJUNCTION WATER STOPPER FOUNDATION
(SCALE 1 : 200) WITH RELEVANT NOTES MENTIONED ON DRAWING
MD-L2-TSW-21-003-R2 (SHEET 1 of 10). LAYOUT PLAN
ENGINEER 'S DRAWING NO.
DRAWN R.A 2021.08.15
Rev. Date Prepeared Checked Endorsed Desription DESIGNED - - MDCG-IFC-SPW-1026-R3
0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 3 of 10
PARAPET WALL
DETAIL-3 SHOP DRAWING
(SEE SHEET 7 of 10)) 4000 11333 EL: 565.20 EL: 565.20
Ø9900
HFL (PMF) EL: 562.85 EL: 564.00 EL: 56
564.00
00
PARAPET WALL
EL: 563.00
EL: 565.20 EL: 561.50
3400
3
HFL (PMF) EL: 562.85 EL: 564.00 EL: 560.00
EL: 563.00
EL: 558.50
EL: 561.50
EL: 557.00
EL: 560.00 OPERATION EL:
E 555.00
EL: 555.50

17871
EL: 558.50 DETAIL-2
1 ((SEE SHEET 7 of 10) EL: 554.00
EL: 557.00 Ø10500
EL: 552.50
OPERATION EL: 555.00
EL: 555.50 3
EL: 551.00
EL: 554.00
FACE SLAB EL: 549.50 DETAIL-1
EL: 552.50
EL: 548.00 (SEE SHEET 7 of 10)

35200
EL: 551.00
EL: VARIES EL: 546.50
EL: 546.129
~

EL: 549.50
SPILLWAY EL: 545.00
APPROACH CHANNEL EL: 548.00
35200

CJ. (Typ.)) FACE SLAB


EL: 543.50
EL: 546.50
~

EL: 542.00
EL: 545.00
EL: 540.50 EL: VARIES
E
CJ. (Typ.)
EL: 543.50
EL: 539.00

16129
EL: 542.00
EL: 537.50
EL: 540.50
EL: 536.00 WS
S ((Ty
(Typ.)
yp
y p.)
p
EL: 539.00
EL: 534.50
EL: 537.50 2700
EL: 533.00
EL: 536.00 WS (Ty
WS (Typ.)
yp.)
p VARIES VARI
VA RIES
EL: 531.50
APPROACH CHANNEL SLAB EL: 534.50
EL: 530.00 EL: 530.00 EL: 530.00
12000 EL: 533.00 15333 75
7500
500 25
2500
500

~MAIN ROCK FILL DAM~


CJ. With WS
CJ CHAMFER
Cont.. JJt. WITH KEY & WS EL: 531.50 EL: 528.00
1000x1000
300 EL: 526.50
EL: 530.00 EL:
EL
L: 530.00
530
0
CJ. With KEYS & WS 1
CHA
CHAMFER
C AM
MF EL: 525.00
EL: 528.00
E 2 00 CJ. With WS
CJ 1000x1000
00 1000
0 EL: 523.50

14000
EL: 526.50 1 CJ. (Typ.)
EL: 522.00

18000
EL: 525.00
CJ. With KEYS & WS EL: 520.50 0.3
EL: 523.50 10
14000

EL: 519.00

5000
15000
CJ. (Typ.) 1
EL: 522.00

15
5
EL: 517.50 WS ((Typ.)
yp )
EL: 520.50 1
10
EL: 516.00
EL: 519.00
1 EL: 514.50
EL: 517.50 WS ((Typ.)
yp ) 4200 VARIES
0.3 EL: 513.00
EL: 516.00 Ø100 PIPE FOR 1

8000
EL: 512.00
EL: 515.00
5 00 GROUT CURTAIN (TYP) EL: 511.50
Ø100 PIPE FOR EL: 514.50

4000
GROUT CURTAIN (TYP) EL: 510.00 0.3 1
EL: 513.00
EL: 508.00 EL: 508.00
9000

4200 7800
7 16233 EL: 511.50
8000

0.3
3
0

EL: 510.00 GROUT CURTAIN (TYP)


2400 VARIES 1200
EL: 508.50 1 1
THE EMPLOYER: PAKISTAN
EL: 507.00 0.3 0.3 WATER AND POWER DEVELOPMENT AUTHORITY
GROUT CURTAIN (TYP) 2700 6700 100 THICK BLINDING CONCRETE (WAPDA)
THE ENGINEER:

2400

100 THICK BLINDING CONCRETE


THE CONTRACTOR:

SECTION 2-2 CGGC-DESCON Joint Venture DESCON

MOHMAND DAM HYDROPOWER PROJECT


(SCALE 1:300)
SECTION 1-1 (Sheet 1 of 10)
LOT-2

SPILLWAY RIGHT TRAINING WALL


(SCALE 1:300)
CONCRETE OUTLINE SECTIONS
(Sheet 1 of 10) NOTE:-
ENGINEER 'S DRAWING NO.
DRAWN R.A 2021.08.15
1. THIS DRAWING SHALL BE READ IN CONJUNCTION Prepeared Desription MDCG-IFC-SPW-1026-R3
Rev. Date Checked Endorsed DESIGNED - -
WITH RELEVANT NOTES MENTIONED ON DRAWING
MD-L2-TSW-21-003-R2 (SHEET 1 of 10). 0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 4 of 10
SHOP DRAWING

EL: 565.20
EL: 564.00

9 8
9281 RIGHT TRAINING WALL

SLOPE
1H:3V
EL:
E L 546.129
5

FACE SLAB

1V:1.4H
PROFILE

7500

35200
0
34000
CJ. WITH
WS EL: 546.129

35.5
EL: 538.629

9
4129

1V:1.4H
V:1.4H
EL: 542.00
1 EL: 540.50
~FACE SLAB~

8629
10500 EL: 539.00
EL: 538.629

16129
EL: 534.50 3
1.4 EL: 537.50
30
3000

81
EL: 533.00 COPPER WATER STOPPER 1 EL: 536.00

4
VAR.
VAR

COPPER WATER
EL: 534.50

8629
STOPPER (TYP.)

2
EL: 531.50 3669
EL: 533.00

SLOPE
1H:3V
12180
1
10500 EL: 531.50
EL: 530.00 EL: 530.00 EL: 530.00
EL: 5
529.00
9 00 EL: 530.00 EL: 530.00
CJ. With WS
CJ
EL: 528.00 CJ. With WS
EL: 528.00
4758 1118
VARIES EL: 526.50
EL: 526.50 ~
CJ. (Typ.)
C EL: 525.00
EL: 525.00 EL: 523.50
CJ. With Keys
y & WS EL: 522.00 RIGHT TRAINING
EL: 523.50
WALL FOUNDATION
14000

EL: 520.50
EL: 522.00 EL: 519.00 CJ With kkey
CJ. y & WS

EL: 520.50 EL: 517.50 ~ WS (Typ.)

EL: 516.00 EL: 516.00


EL: 519.00 Ø100 PIPE FOR
GROUT
R CURTAIN (TYP) EL: 514.50

EL: 517.50 EL: 513.00


WS ((Typ.)
yp )
EL: 511.50
EL: 516.00 EL: 516.00 EL: 510.00

EL: 514.50 EL: 508.00 EL: 508.00


VARIES VARIES
S
EL: 513.00 EL: 512.00
8000

PAKISTAN
SECTION 3-3
THE EMPLOYER:
EL: 511.50 WATER AND POWER DEVELOPMENT AUTHORITY
GROUT CURTAIN (TYP.) (SCALE 1:300) (WAPDA)
EL: 510.00 THE ENGINEER:
(Sheet 1 of 10)

EL: 508.00
THE CONTRACTOR:
VARIES VARIES
E VARIES CGGC-DESCON Joint Venture DESCON
100 BLINDING CONCRETE (TYP.)
MOHMAND DAM HYDROPOWER PROJECT
NOTE:-
SECTION 4-4 1. THIS DRAWING SHALL BE READ IN CONJUNCTION
LOT-2

(SCALE 1:200)
WITH RELEVANT NOTES MENTIONED ON DRAWING SPILLWAY RIGHT TRAINING WALL
(Sheet 1 of 10) MD-L2-TSW-21-003-R2 (SHEET 1 of 10).
CONCRETE OUTLINE SECTIONS
ENGINEER 'S DRAWING NO.
DRAWN R.A 2021.08.15
Rev. Date Prepeared Checked Endorsed Desription DESIGNED - - MDCG-IFC-SPW-1026-R3
0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 5 of 10
CL
SHOP DRAWING

EL: 538.629
538 6 9 Ø10500
0
EL: 538.629 EL: 565.20 EL: 565.20
~FACE SLAB~ EL: 564.00 EL: 564.00
EL: 5
563.00
3
EL: 561.50
8629

3000 6572
EL: 560.00
6076
EL: 531.955
53 955 EL: 558.50

461
EL: 531.161 EL: 531.955
~FACE SLAB~ EL: 557.00
EL: 530.00 EL: 531.161
EL: 555.50
EL: 530.00
530 00
EL: 528.50 RIGHT TRAINING WALL EL: 554.00
COPPER WATER
0.25 EL: 527.00 STOPPER (TYP.) EL: 552.50
1 0.25
EL: 525.50 EL: 551.00

7171
1
3000 3665
6
EL: 524.00 EL: 549.50
3 1
EL: V
VAR. CL THROUGH RTW WP-1
CJ. (Typ.)
p. EL: 524.00 EL: 548.00
00
0
EL: 522.50
VAR. 9344
EL: 522.50 EL: 5
546.50
46
46
EL: 521.00
EL:
E
EL
L 545.00
Typ.
y Water Stopper EL: 521.00 1
EL: 519.50 COPPER
P WATER CJ.. (Typ.)
STOPPER
P (TYP.) EL: 543.50
4250 7387
EL: 519.50
EL: 518.00 CJ. WITH WS
4250 5150 3 EL: 542.00
EL: 518.00 CJ. WITH WS CJ. With Water Stopper EL: 540.50
EL: 516.50
2983

EL: 516.00 CJ. (Typ.) 11


533

EL: 539.00

2983
EL: 516.50 EL: 538.629
EL: 515.00

479
9

EL: 516.00
5 6 00
EL: 537.50

0
Ø100 PIPE FOR EL: 515.00
GROUT CURTAIN (TYP)
Ø100 PIPE FOR
4 EL: 536.00
12883
1V:4.71 GROUT CURTAIN (TYP)
H 10418
GROUT CURTAIN
10 EL: 534.50

8629
1V:4.71

2
H
500

GROUT CURTAIN
100 BLINDING CONCRETE (TYP.)
5 EL: 533.00

512
100 BLINDING CONCRETE (TYP.)
EL: 531.955
5
EL: 531.50
12
SECTION 5-5 SECTION 6-6 4H
EL: 530.00
:1.
(SCALE 1:250) (SCALE 1:250) 1V CJ. With WS
(Sheet 1 of 10) (Sheet 1 of 10) EL: 528.50
1.4
EL: 527.00 1

1000
0
FACE SLAB EL: 525.50 6
OUTLINE EL: 524.00 CJ. With key
y & WS

EL: 538.629
538 6 9 EL: 522.50 CJ. (Typ.)
EL: 521.00
EL: 519.50 9 7
EL: 518.00 CJ. With
th kkey
y & WS
EL: VARIES CJ WITH WATERSTOP
EL: 516.00
E
EL:
L: 516
6.0
6.00
~FACE SLAB~ EL:
EL: 5
L: 515.00
515
15
5.0
00
00 1
EL: 531.948
53 9 8 EL: VARIES
S 0.3 4
EL: 531.161 11 12
10
EL: 530.00
PLINTH 7 6
9 Cont.Jt. WITH 5
WATER STOPPER
100 THK BLINDING CONCRETE

0.25 THE EMPLOYER: PAKISTAN


WATER AND POWER DEVELOPMENT AUTHORITY
1 SECTION 8-8 (WAPDA)
13617

(SCALE 1:300) THE ENGINEER:

7250 (Sheet 1 of 10)

4250 3000 1347 THE CONTRACTOR:

CGGC-DESCON Joint Venture DESCON


CJ. (Typ.)
EL: 518.00
1
NOTE:- MOHMAND DAM HYDROPOWER PROJECT
EL: 516.50 LOT-2
425
2983

1. THIS DRAWING SHALL BE READ IN CONJUNCTION


9

3
EL: 515.00 WITH RELEVANT NOTES MENTIONED ON DRAWING
Ø100 PIPE FOR
COPPER WATER SPILLWAY RIGHT TRAINING WALL
STOPPER (TYP.) MD-L2-TSW-21-003-R2 (SHEET 1 of 10).
GROUT CURTAIN (TYP)
8048 CONCRETE OUTLINE SECTIONS
GROUT CURTAIN
1V:4.71 ENGINEER 'S DRAWING NO.
H DRAWN R.A 2021.08.15
4
524

100 BLINDING CONCRETE (TYP.)


Rev. Date Prepeared Checked Endorsed Desription DESIGNED - - MDCG-IFC-SPW-1026-R3
0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15
SECTION 7-7 01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15
DRAWING NO.
MD-L2-TSW-21-003-R2
(SCALE 1:250)
(Sheet 1 of 10) 02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 6 of 10
SHOP DRAWING

3000 6546

300
EL: 531.955

1955
300 50 CHAMFER ((TYP)) ~FACE SLAB~
EL: 565.20 EL 530.00
EL: 53
30 00
0
COPPER WATER
STOPPER (TYP.)
PARAPET WALL

4000
FABRIC REINFORCED WATERSTOPPER ((TYP.)
Y )

1200
HYPALON MEMBRANE 0.25
300
PLASTO-ELASTIC
1
MASTIC JOINT 1 1000
1 00
EL: 564.00

2000
CORRUGATED SEALENT 1000
0 10
1000
0
1500 3

2
WATER STOPPER
JOINT
NEOPRENE ROD FILLER BOARD

~
~

4000
RIGHT TRAINING FACE SLAB
WS
WALL
~
~

4250
~

500
CJ. WITH WS

2000
BOND
OND BREAKER
BR
B RE A
AKK R
COPPER KERB
ER BEAM
A

A
EL: 518.00
WATER STOPPER DETAIL-3
~

000
1000
MD-L2-TSW-21-003-R1

00
~ SHEET 4 OF 10

1
EL: 516.00
(SCALE 1:50)
ROCKFILL
RO
ROCK
O CK
C KFI L D
DA
DAM
AM
A M 1200 4000 4000

300
A
500
1000
~

100 BLINDING CONCRETE (TYP.)

SECTION 10-10
(SCALE 1:200)
(Sheet 1 of 10)

DETAIL-1
MD-L2-TSW-21-003-R1 7560
5 764
SHEET 4 OF 10 EL: 518.00 ~FACE SLAB~
(SCALE 1:20)

540
5
15
EL:
E L 516.460
516 46
460

EL: 515.00
0
EL: 514.456
EL: 513.464
4
500

7221 EL: 513.015


13 015
271

830
FABRIC REINFORCED
1V:4.91
HYPALON MEMBRANE H
PLASTO-ELASTIC

ACEMENT
200
MASTIC JOINT SEALENT

1st PLACEMENT

CEMEN
CORRUGATED
WATER
ATER STOPPER SECTION 9-9

0000

AC
100
200

LA
T D (SCALE 1:200)
JOIN BOAR

d PL
NEOPRENE ROD
(Sheet 1 of 10)
E R
~

2nd
FIL L

200
2
FACE SLAB
~

~
BOND B
BREAKER
EAK R
THE EMPLOYER: PAKISTAN
KERB
K B BEAM
A WATER AND POWER DEVELOPMENT AUTHORITY
COPPER Contraction Joint
(WAPDA)
WATER STOPPER SECTION A-A THE ENGINEER:
~

SCALE 1:50
~Right
Right Training
T i i g Wall~
W ll
~

RIGHT TRAINING
R ~
WALL
THE CONTRACTOR:
ROCKFILL
RO
ROC
O CK
KF LL DA
K D
DAM
AM
~

Face Slab
F Sl b T
Top
p liline
50

CGGC-DESCON Joint Venture DESCON


0
~

MOHMAND DAM HYDROPOWER PROJECT


~Right
Right Abutment
Abutment~ LOT-2
NOTE:-
1. THIS DRAWING SHALL BE READ IN CONJUNCTION SPILLWAY RIGHT TRAINING WALL
Copper
pp W Wate
Water
te
er Stopper
Stop
Stopp
S
St pp r WITH RELEVANT NOTES MENTIONED ON DRAWING CONCRETE OUTLINE SECTIONS
MD-L2-TSW-21-003-R2 (SHEET 1 of 10).

DETAIL-2 DRAWN R.A 2021.08.15 ENGINEER 'S DRAWING NO.


MDCG-IFC-SPW-1028-R0
MD-L2-TSW-21-003-R1 Detail For Copper
pp Water Rev. Date Prepeared Checked Endorsed Desription DESIGNED - -
MDCG-IFC-SPW-1029-R1
SHEET 4 OF 10 Stopper
pp At Contraction Joint 0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15
(SCALE 1:20) SCALE 1:50 DRAWING NO.
01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 7 of 10
4032 PARAPET WALL SHOP DRAWING
EL: 564.00 EL: 546.129
2nd PLACEMENT
2
NOTE:-

3700
1. THIS DRAWING SHALL BE READ IN CONJUNCTION 2000

200
WITH RELEVANT NOTES MENTIONED ON DRAWING 2000 1800
0

2
MD-L2-TSW-21-003-R2 (SHEET 1 of 10). 200 200

~FACE SLAB~
200
0

((RIGHT TRAINING WALL)

1V:1.4H
2. Concrete placement sequence reversed as

BUTMENT)
5000

WA

CEMENT
CEMENT
compared with IFC drawings which is

0
200
UTME
acceptable. However, the Contractor shall FACE SLAB

1500

00

CEE
2000
CEE
ensure installation of "Grouting System at

U
BU
20
1st PLACEMENT

2nd PLAC
1st PLAC

RIGHT AB
Cont. Jt." in the right abutment as per MDCG 1000 1800
8 3000
0 0 2876
2

(RIGHT
Design COPPER WATER
R 2000 2000
0 EL: 538.629
STOPPER (TYP.) SECTION B-B

500
1500
50 0
SCALE 1:50
11692 4132

200
5000
Refer to Note-2

2
EL: 565.20 EL:: 536.00
E 5 60 COPPER WATER
STOPPER (TYP.)

1500
EL: 564.00
EL:: 534.50
E 5 45 1
1800
0 EL: 563.00
CJ. (Typ.)
Ty )

7015
WATERSTOPPER ((TYP.)) 2000 2000 2000 EL:: 533.00
E 5 30 4876
EL: 561.50 3

00
1500
SECTION A-A 300 .
EL:: 531.50
E 5 5
Typ WS

5000
SCALE 1:50 EL: 560.00
Refer to Note-2 EL:: 530.00
E 00 EL: 530.00

1500
EL: 558.50
CJ. With WS
1800
EL: 528.00

00
2000 2000 2000 2000 2000 EL: 557.00

00
10
0 0
CJ. With KEYS & WS
CJ. With WS 00
1500 EL: 555.50 EL: 526.50
5000

10352 B B
12175 APPROACH SLAB
EL: 554.00 SECTION 11-11
1300

1567 (SCALE 1:200)


0

1041
Cont. JJt. WITH WS (Sheet 1 of 10)
EL: 530.00 7744 11612 4032 EL: 552.50
00
800
2000 180

6000 3000
30 5000 2000 6000 4175
EL: 551.00
DETAIL '4'
~FACE SLAB~
1500

EL: 549.50
5

3398 1000
0
1500

EL: 525.00 CJ. W


With Keys
y & WS Cont. Jt. WITH 100
1 0
1
0
0 2000 1800

2953 5000 2000 5000 3000


3
30
0 5000 2000 5000
50 KEYS & WS (APPROACH SLAB)
COPPER WATER EL: 548.00
EL: 530.00
STOPPER (TYP.)
2000

1931
1
1400

2 0
200

250
EL: 546.50

100
14

EL: 546.129
1400

3447
A

EL: 520.00
CJ. (Typ.)
00 1

EL: 545.00
2000

2 0
2000

300
00

100
2

300
1800

EL: 543.50

4129
EL: 516.00
A

300
1

250
EL: 515.00 5550 RIGHT ABUTMENT OF EL: 529.00
EL: 514.40 SPILLWAY NEXT TO RIGHT EL: 542.00

1V:1.4
1V
TRAINING WALL

V:1.4H
V:1.4
V
250
2504 6933
9 2776
6 21704

1 4H
3666 EL: 540.50 Blinding Concrete
1600

100 THICK BLINDING CONCRETE EL: 539.00


EL: 538.629

CJ, See Section 17-17 EL: 537.50

14515
EL: 507.00
EL: 506
506.40
0
DETAIL - 4
2536 3236
2 3636
6 6 2776 SECTION 13-13 EL: 536.00 SCALE 1:40
(SCALE 1:300) (Sheet 8 of 10)
(Sheet 1 of 10)
0)
EL: 534.50
THE EMPLOYER: PAKISTAN
WATER AND POWER DEVELOPMENT AUTHORITY
~FOUNDATION~ EL: 533.00 (WAPDA)
THE ENGINEER:

~FOUNDATION~
15824 EL: 531.50

EL: 516.00 EL: 516.00


EL: 530.00 EL: 530.00
Right Abutment Level : 515.00 CJ. With KEYS & WS THE CONTRACTOR:
100 THICK
BLINDING CONCRETE EL: 514.50
E 1 0
CJ. With W
WS CGGC-DESCON Joint Venture DESCON
EL: 516.00
EL: 513.00
EL: 514.50 EL: 528.00
MOHMAND DAM HYDROPOWER PROJECT
4000

~FOUNDATION KEY~ EL: 511.50


EL: 513.00 LOT-2
1
EL: 510.00
EL: 526.50
8000

EL: 512.00
~FOUNDATION KEY~ EL: 511.50 0.3
SPILLWAY RIGHT TRAINING WALL
1
EL: 508.00
1 EL: 508.50
SECTION 12-12 CONCRETE OUTLINE SECTIONS
4000

EL: 510.00 0.3


0.3
1 EL: 507.00 (SCALE 1:200)
100 THICK BLINDING CONCRETE (Sheet 1 of 10) ENGINEER 'S DRAWING NO.
0.3
3 EL: 508.00 DRAWN R.A 2021.08.15
2400 VARIES VARIES
1200 VARIES 2400 FILL CONCRETE Rev. Date Prepeared Checked Endorsed Desription DESIGNED - - MDCG-IFC-SPW-1037-R0
100 THICK BLINDING CONCRETE VARIES
0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15
SECTION 15-15 SECTION 14-14 DRAWING NO.
01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
(SCALE 1:300) (SCALE 1:300)
(Sheet 2 of 10) (Sheet 2 of 10) 02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 8 of 10
SHOP DRAWING

Ø10500

EL: 565.20 15495 10650


EL: 564.00 12525 6542 8952 8949

95
995
CJ. WITH WS 7948
EL: 530.00

0
2000
3848

200
2

2000
4743 5
5000 3000 5000 5000 3000 5000 2500

0
200
0

2000 2000 2000 2000


CJ. WITH KEY & WS

00
CEMENT
CEMENT

EMEN

14000
00
RIGHT TRAINING WALL

CEE
2000
CEE
~RIGHT ABUTMENT WALL~

20

2nd PLAC
1stt PLAC

17005
C
380
0

2000
200
Cont. Jt. WITH KEY AND WS EL: 516.00

2
EL: 515.40

0
000
18401 EL: 512.00

100
Hz. WS shall continue (No Break)
(Typical)

4000
SECTION C-C
SCALE 1:50 EL: 508.00
9503
EL: 538.629
538 6 9 2406 9511 1200
SECTION 17-17
(SCALE 1:300)
(Sheet 1 of 10)
8629

4H
:1.
1V ~Foundation~ WATER STOPPER
CJ. WITH KEYS WS 13831
350 700 350
EL: 530.00
0
2000

Water Stopper 100


~Foundation~ TYP.
X X

600
2000 5000 3000 5000 3832 5000 3000 5000 2000
0
1400
CJ. WITH KEY AND

CJ. WITH KEY & WS KEY (TYP.) 700 700

1200
WATERSTOP

150
B.O.PCC
P TYP.
00 2000
20

600
T

500
CJ. WITH KEY & WS
YP.

5 Ø25 Grouted Anchor Bars 400 In Concrete


e

0
400
C

00
TY
20
0

1 1 And 2000 In Rock With Grout (Typ.)


700 700
1400
1200
000

~Foundation~
200
C

EL:
E L: 516
516.00
00
350
EL: 515.40
700
100 THK BLINDING CONCRETE WATER STOPPER
2000

FOUNDATION TYP.
SECTION 16-16 SCALE 1:40
(SCALE 1:300)
Ø25 Grouted Anchor Bars 400 In Concrete
(Sheet 1 of 10)
And 2000 In Rock With Grout (Typ.)

THE EMPLOYER: PAKISTAN


25 WATER AND POWER DEVELOPMENT AUTHORITY
(WAPDA)
THE ENGINEER:

10 SECTION X-X
SCALE 1:40
19 THE CONTRACTOR:

CGGC-DESCON Joint Venture DESCON


225~230

MOHMAND DAM HYDROPOWER PROJECT


NOTE:- LOT-2
38
1. THIS DRAWING SHALL BE READ IN CONJUNCTION
WITH RELEVANT NOTES MENTIONED ON DRAWING SPILLWAY RIGHT TRAINING WALL
MD-L2-TSW-21-003-R2 (SHEET 1 of 10). CONCRETE OUTLINE SECTIONS
ENGINEER 'S DRAWING NO.
DRAWN R.A 2021.08.15
Rev. Date Prepeared Checked Endorsed Desription DESIGNED - - MDCG-IFC-SPW-1027-R0
P.V.C WATER STOPPER DETAIL 0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15
(THREE BULB) DRAWING NO.

SCALE 1:5 01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 9 of 10
2484

1200
EL: 531.955 SHOP DRAWING
4032 PARAPET WALL

EL: 564.00 3732


EL: 530.00

~RIGHT ABUTMENT WALL~


WATERSTOPPER ((TYP.)
Y )
1
Cont. Jt. WITH KEY AND WS
0.25
300
3
1 ~RIGHT TRAINING WALL~

13955

161
6888

86
EL: 538.629

CJ. WITH WS
4H
:1.

33900
33232
9612 4166 7033 1V
EL: 518.00 CJ. WITH WS
06

EL: 530.00

2000
412

00
1443
EL: 516.00
WATERSTOPPER ((TYP.)) 11418
CJ. WITH KEY & WS
100 BLINDING CONCRETE (TYP.)
12336

13400

13400
14300
WATER STOPPER DETAIL
(TOTAL LENGTH 56.65 M) CJ. WITH KEY & WS
SECTION 10-10
(SCALE 1:200)
(Sheet 1 of 10)
APPROACH SLAB
CJ. W
WITH WS
S 33232
Cont. Jt. WITH WS
EL: 530.00 27465 EL: 516.00

EL: 515.40

CJ. Wi
C With Keys & WS 100 THK BLINDING CONCRETE
EL: 525.00 31629
1
1629 SECTION 16-16 WATER STOPPER DETAIL
(SCALE 1:300) (TOTAL LENGTH 107.56 M)
8
45
9

(Sheet 1 of 10)
13500

1410
5
135
4331

EL: 520.00

18360 CJ. WITH WS


EL: 530.00 16477
7
4970

21704 11
EL: 516.00
5912 84
9 0
1900

EL: 515.00
EL: 514.40
1046

CJ. WITH KEY & WS

C
1403
8900

4300
14300
NOTE:-
100 THICK BLINDING CONCRETE 3000 2876
6

4
2484 1. THIS DRAWING SHALL BE READ IN CONJUNCTION

16941
EL: 538.629
C WITH RELEVANT NOTES MENTIONED ON DRAWING
EL: 507.00
380
0 MD-L2-TSW-21-003-R2 (SHEET 1 of 10).
EL: 506.40
0 WATERSTOP (TYP.)
W
14184 6407
SECTION 13-13 1 EL: 516.00

WATER STOPPER DETAIL THE EMPLOYER: PAKISTAN


300 WATER AND POWER DEVELOPMENT AUTHORITY
(TOTAL LENGTH 246.00 M) 3 EL: 515.40
8629

983

(SCALE 1:300) (WAPDA)


9329

8354
(Sheet 1 of 10) EL: 512.00
4

THE ENGINEER:
Hz. WS shall continue (No Break)
(Typical)

3882
9035
WATER STOPPER DETAIL EL: 508.00 THE CONTRACTOR:

EL: 530.00 (TOTAL LENGTH 137.46 M) CGGC-DESCON Joint Venture DESCON


2406 9511 1200
CJ. WITH WS
SECTION 17-17 MOHMAND DAM HYDROPOWER PROJECT
(SCALE 1:300) LOT-2
5260 (Sheet 1 of 10)

CJ. WITH KEY &WS SPILLWAY RIGHT TRAINING WALL


WATER STOPPER SECTIONS DETAIL
WATER STOPPER DETAIL DRAWN R.A 2021.08.15 ENGINEER 'S DRAWING NO.
(TOTAL LENGTH 21.64 M)
Rev. Date Prepeared Checked Endorsed Desription DESIGNED - - MDCG-IFC-SPW-1027-R0
SECTION 11-11 0 2021.04.07 R.A M.B E.H SUBMISSION FOR APPROVAL CHECKED M.B 2021.08.15 DRAWING NO.
(SCALE 1:200)
(Sheet 1 of 10) 01 2021.06.12 R.A M.B E.U.H SUBMISSION FOR APPROVAL ENDORSED E.U.H 2021.08.15 MD-L2-TSW-21-003-R2
02 2021.08.15 R.A M.B E.U.H SUBMISSION FOR APPROVAL SCALE AS SHOWN Sheet 10 of 10