Location Tanajib,Saudi Arabia

MIP PKG12 – UTILITIES, FLARE AND


BI/JO No. 10-09003-0005
PIPERACK FOR TANAJIB GAS PLANT
Contract No. 660044614 (OOK)/6600044615(IK)
PROJECT
PO. No. SM12-RM-PO-011-4600063573
Aramco Order No. TPIK-T76-31-E405-DA
Vendor Name Equipment / Material Tag No. Sheet. No. 001 of 006
Zeeco Middle East Ltd. T76-U-0001
T76-U-0505 Rev. No. A
T76-U-0506

:JUNCTION BOX -601 Package (AJB +DJB &


Document Title FFJB)
(Pepperl + Fuchs)

Document No. : VD-RM011-COMMON-029 / ZME-203-IP48001

DOCUMENT STATUS

1 : APPROVED.

: APPROVED WITH COMMENTS.


2 WORK MAY PROCEED SUBJECT TO
COMMENTS ADDRESSED/INDICATED.

3 : NOT APPROVED.
REVISE AND RESUBMIT.
WORK MAY NOT PROCEED.

4 : INFORMATION ONLY

NOTE: Permission to proceed does not constitute


acceptance of approval of design details, calculations,
analyses, test methods or materials developed/selected
by the supplier and does not relieve the supplier from
full compliance with contractual obligations.

REVIEW DATE: . . .

ENGINEER LEAD ENGINEER

NMR CODE : 7902.601.2 to 6

Revised NMR 601 for Code 1


B 13/11/2022 AH VC
approval
Nmr 601 DRAWINGS FOR
A 06/09/2022 OG AR
APPROVAL
APPROVED APPROVED
REV. DATE DESCRIPTION PREPARED CHECKED