1.4c Drinking Water Cooler Inspection Checklist

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

PROJECT NAME: Expansion of Existing Badar SS 9013 and Reactor

Installation at SS9008 and PP-77 (9007)


ELEMENT 1.4c
DRINKING WATER STATION INSPECTION CHECKLIST

LOCATION SECURITY ROOM DRINKING STN. No. 001 MONTH

LEGEND OK – ACCEPTABLE, NOT - NOT ACCEPTABLE, ELM– EQUIPMENT LOST OF MISSING, REP – EQUIPMENT BEING REPAIRED, N/A – NOT APPLICABLE
RAISE THE ISSUES THROUGH CORRECTION REPORT (BEFORE & AFTER PHOTO) FOR ACTION TAKEN

Date

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
1

9
Time
Base Structure

Condition of Filters

No Water Leakage
Sump pit/ No stagnant of
water
Cleaning (Cooler)

Drinking Cup(s)
Availability of Cooling
water
Connections Electrical

Water Availability

Tank Cleaning

CleanerSignature

Supervisor Signature

Safety Officer Name: _______________________________ Signature: _____________________ Date: _____________________


(Reviewed By)

Site Manager Name: _______________________________ Signature: _____________________ Date: _____________________


Page 1 of 2 Rev.2 [08-April-2019]Projects Business Unit
PROJECT NAME: Expansion of Existing Badar SS 9013 and Reactor
Installation at SS9008 and PP-77 (9007)
ELEMENT 1.4c
DRINKING WATER STATION INSPECTION CHECKLIST

(Accepted By)

Page 2 of 2 Rev.2 [08-April-2019]Projects Business Unit

You might also like