Doha Metro Project

Asset Fault/Defect Report


S200-ACIFM-MNT-34-
RPT-XXXXXXX-01517 M008:GWST040
ACIFM Report No: Station: Date: 10/08/2020
Al Messila

Sub 14:27
RKH Ref. No. CM WO: 183813 RCU Time:
System

ACIFM/ Sub- ACIFM


Location of Event: Al Messila – North under Platform corridor
Contractor:

Position & Electrical Technician


Person(s) Involved: Edward
I.D:

☐ Customer ☒ Assets
Subsequent Impact: Safety: ☒ High* ☐ Med* ☐ Low* ☐ Operations
Experience Reliability / Life
* High: Immediate Safety Impact (within 1 week) Medium: Potential Safety Impact (~1week or more) Low: Potential Safety Impact (~1month or more)

Fault/ Defect Title: FCU-CL-W-167 - General fault

Fault/ Defect Description: Corrective Maintenance (CM) reported by Station Master (SM).
“183813” FCU-CL-W-167 showing General Fan Fault from BACS, serving North
Under Platform corridor.
When ACIFM team reached the location and noticed that BACS showing
general fault in FCU-CL-W-167.

Asset/ Plant/ Equipment reference: FCU-CL-W-167

Means of Fault / Defect realisation ☐ PM ☒ CM ☒ Testing ☐ Random Inspection ☐ Incident /Accident


☐ Other Specify______________

Actions Taken: • Checked in the field and noticed that the asset tag number was wrong,
the asset tag number placed in the control panel, not in the FCU (FCU-
CL-W-113).
• Team had checked FCU controller input voltage which found to be
normal meanwhile the FCU not functioning.
• Tried to run the FCU through bypassing its command from the
controller between terminals 29 & 30 but the FCU not functioning its
shows Failed to run in BACS.
• BACS command and status feedback to the unit has been normal but
the terminal 4 & 5 of the controller are in open position.
• Measured the voltage in both the temperature sensors and observed
that the Voltage receiving normal (1.610VDC & 21.61VDC).
• Checked the output voltage from the transformer for the actuator and it
was receiving normal (26.28VAC).

Parts removed ☐ Yes ☒ NO


Is Yes [Specify Equipment Description/Part Number/Serial Number]
1.
2.
3.

Property: QHSE Dept. ACIFM – Internal Use Only


M01-ACI-HSE-FRM-0034 Rev. 2 Page 1 of 3
Doha Metro Project

Parts Used ☐ Yes ☒ NO


Is Yes [Specify Equipment Description/Part Number/Serial Number]
1.
2.
3.

Current Status: ☒ Open/Outstanding ☐ Partial/Temporary ☐ Closed/resolved


☐ Other Specify______________

Action(s) to Be Taken/ Recommendation(s): Responsible Due Date

JV shall fix the issue and ensure the FCU functioning normal and BACS free
PSH JV 25/08/2020
from fault.
Root cause analysis shall be conducted then to implement corrective action.

Full Name Arun Selastin Position Electrical Engineer

Approved: Adib Yaghi Position MEP Manager

Supporting information: WO Planned Start


00000000000000129710 18/05/2020 11:17
00000000000000150129 15/06/2020 09:15
00000000000000167392 13/07/2020 06:32
00000000000000188073 10/08/2020 07:12

Asset tag different

Property: QHSE Dept. ACIFM – Internal Use Only


M01-ACI-HSE-FRM-0034 Rev. 2 Page 2 of 3
Doha Metro Project

Output Voltage from the transformer

Input

Temperature sensor voltage normal

Property: QHSE Dept. ACIFM – Internal Use Only


M01-ACI-HSE-FRM-0034 Rev. 2 Page 3 of 3