Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (Basement B1&B2)
BOQ
Total
Sec. ITEM ITEM ITEM Unit Rate
Amount Notes
No. DESCRIPTION UNIT Qty. EGP
EGP
Division 15 (FIRE PROTECTION WORKS)
15101 Piping & Fitting Materials
1‐ERW Pipes
Supply , install , connecting and test of electric‐resistance‐
welded black steel pipe (ERW) as per ASTM. A53 Schedule 40
for fire protection piping system complete including pipes,
fittings , supports , hangers , seismic support, inserts and all
couplings and adapters all as specified and as shown on
drawings.
25 mm nom. Dia.Piping M. 3000
32 mm nom. Dia.Piping M. 1000
40 mm nom. Dia.Piping M. 1100
50 mm nom. Dia.Piping M. 400
65 mm nom. Dia.Piping M. 70
100 mm nom. Dia.Piping M. 2200
150 mm nom. Dia.Piping M. 40
200 mm nom. Dia.Piping M. 190
2‐Galvanized Steel Pipes
Supply, install, connect and test sprinkler drainage
galvanizedblack steel pipe (ERW) piping system complete,
including but not limited to pipes & fittings, supports &
hangers, sleeves & inserts, piping identifications, and all
couplings and adapters as per A.S.T.M. A‐53 schedule 40, all
as specified and as shown on drawings.
50 mm nom. Dia.Piping M. 50
75 mm nom. Dia.Piping M. 100
15111 VALVES
1‐O.S. & Y gate valves
Supplying installing, connecting and testing of O.S. & Y gate
valves with tamper (supervisory) switches to be installed on
sprinkler zone branch pipes and on riser bases, all as
specified in section 15315 and as shown on drawings.
50 mm Dia.Valves NO. 2
100 mm Dia.Valves NO. 6
150 mm Dia.Valves NO. 6
2‐Check valves
100 mm Dia.Valves NO. 6
3‐ Alarm Check valves
Alarm Check Valve Assembly including OS&Y gate valves
(normally open), alarm check valve, water motor gong with
test drain valves, retard chamber and water flow switch:
interconnecting pipes & fittings and all necessary accessories:
all in as stated in specifications.
200 mm Dia.Valves NO. 1
SHAKER Consultancy Group
Rev. 1 ‐ 27 Sep., 2018.
SCG-2423-19A_20A-BOQ-F-X-001-FC-01.xlsx Page 1 of 9
Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (Basement B1&B2)
BOQ
Total
Sec. ITEM ITEM ITEM Unit Rate
Amount Notes
No. DESCRIPTION UNIT Qty. EGP
EGP
Division 15 (FIRE PROTECTION WORKS)
4‐Pressure Reducing Valves
Supplying, installing, connecting and testing of pressure
reducing valves (PRV) to discharge at 12 bar (175 PSI)
downstream pressure , complete with all valves , pressure
gauge as shown on drawings.
100 mm Nom. Dia. Pressure Reducing Valves NO. 6
5‐Drainage Valves
Supplying, installing and connecting, gate valve of 50 mm
diam. at the end of the main pipes and at the base of each NO. 14
riser.
15300 SPRINKLER PIPE FIRE SUPPRESSION SYSTEMS
1‐ Water Flow Switch
Supplying, installing, connecting and testing of vane‐type,
weather proof dust tight construction housing water flow
switches to be installed on zone sprinkler branch pipes and
on bottom of risers, all as specified in section 15330 and as
shown on drawings.
50 mm Dia.Valves NO. 2
100 mm Dia.Valves NO. 6
150 mm Dia.Valves NO. 6
2‐ Inspectors test & Drain Valve
Supplying, installing, connecting, and testing of 50 mm diam.
inspector's test and drain assembly consisting of a single self
locking operating handle drilled for seal, 50 mm diam orifice
plate giving a flow equivalent to one operating sprinkler
NO. 6
head, two self draining cleanable sight glasses and all other
accessories required for the complete assembly, as specified
in section 15330 and as shown on drawings.
3‐ Pendant Sprinklers
Supplying, installing, connecting and testing of 15 mm
pendant concealed quick response sprinkler heads to be NO. 71
installed in finished areas.
4‐ Upright Sprinklers
Supplying installing, connecting and testing of 15 mm up‐
right sprinkler heads to be installed in unfinished areas
NO. 1572
(without false ceilings) and high ceiling void areas.
5‐ Side Wall Sprinklers
Supply , install , connect and test of 15 mm extended
coverage side wall sprinkler with K‐Factor (5.65) to be
NO. 62
installed in all areas without false ceiling all as specified and
as shown on drawing .
SHAKER Consultancy Group
Rev. 1 ‐ 27 Sep., 2018.
SCG-2423-19A_20A-BOQ-F-X-001-FC-01.xlsx Page 2 of 9
Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (Basement B1&B2)
BOQ
Total
Sec. ITEM ITEM ITEM Unit Rate
Amount Notes
No. DESCRIPTION UNIT Qty. EGP
EGP
Division 15 (FIRE PROTECTION WORKS)
15305 NOVEC Clean Agent Extinguishing System
Supply and install total flooding automatic fire extinguishing
system of 4.5 % concentration by volume of FK‐5‐1‐12
(NOVEC) in Maximum 5 seconds discharge time, system shall
be complete including but not limited to the following
cylinders, manifolds, nozzles, piping work, control panels,
detectors, alarm horns, abort switch, flashing devices
switches, batteries annuciators, manual pull stations, all
accessories and control cabinets all as specified.
System (01) ‐ LV room, Basement 1
NO. 1
MAIN: 3 cyl. X 115 = 345 kg.
System (02) ‐ UPS room, Basement 1
NO. 1
MAIN: 1 cyl. X 110 = 110 kg.
System (03) ‐ Battery room, Basement 1
NO. 1
MAIN: 1 cyl. X 65 = 65 kg.
System (04) ‐ Battery room, Basement 1
NO. 1
MAIN: 1 cyl. X 65 = 65 kg.
System (05) ‐ UPS room, Basement 1
NO. 1
MAIN: 1 cyl. X 110 = 110 kg.
System (06) ‐ LV room, Basement 1
NO. 1
MAIN: 3 cyl. X 115 = 345 kg.
System (07) ‐ UPS room, Basement 1
NO. 1
MAIN: 1 cyl. X 65 = 65 kg.
System (08) ‐ Battery room, Basement 1
NO. 1
MAIN: 1 cyl. X 40 = 40 kg.
RESERVE: 10 % OF TOTAL SYSTEMS
NO. 1
190 kg.
15304 FIRE STANDPIPE SYSTEM
1‐ Fire Hose Station
Supplying, installing, connecting and testing of fire hose
stations ( FHS ) with fire extinguishers consisting of 40 mm
pressure restricting type brass control valve with 65 PSI
down stream pressure, fire hose reel, fire hose 25 mm Dia.
and 30 m long, 65 mm diam. fire department landing valves, NO. 13
pressure restricting type with 100 PSI down stream pressure
having connections, nozzle, steel cabinet, fire extinguisher 6
k.g dry powder and all adapters and fittings required for the
complete assembly as specified and as shown on drawings.
2‐ Fire Extinguishers
Supplying, installing, connecting and testing of dry powder
manual, portable, hand held, fire extinguishers to be installed
all around the building, in addition to CO2 manual fire
extinguishers to be used in electrical and mechanical rooms
all as specified in section 15375 and as shown on drawings.
SHAKER Consultancy Group
Rev. 1 ‐ 27 Sep., 2018.
SCG-2423-19A_20A-BOQ-F-X-001-FC-01.xlsx Page 3 of 9
Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (Basement B1&B2)
BOQ
Total
Sec. ITEM ITEM ITEM Unit Rate
Amount Notes
No. DESCRIPTION UNIT Qty. EGP
EGP
Division 15 (FIRE PROTECTION WORKS)
6 kg cap. dry powder fire extinguishers. FE‐1 NO. 42
6 kg cap. CO2 fire extinguishers. FE‐2 NO. 26
TOTAL FIRE PROTECTION WORKS
SHAKER Consultancy Group
Rev. 1 ‐ 27 Sep., 2018.
SCG-2423-19A_20A-BOQ-F-X-001-FC-01.xlsx Page 4 of 9
Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (Building)
BOQ
Total
Sec. ITEM
ITEM ITEM Unit Rate Amount Notes
No. DESCRIPTION
UNIT Qty. EGP EGP
Division 15 (FIRE PROTECTION WORKS)
15101 Piping & Fitting Materials
1‐ERW Pipes
Supply , install , connecting and test of electric‐resistance‐
welded black steel pipe (ERW) as per ASTM. A53 Schedule 40
for fire protection piping system complete including pipes,
fittings , supports , hangers , seismic support, inserts and all
couplings and adapters all as specified and as shown on
drawings.
25 mm nom. Dia.Piping M. 10620
32 mm nom. Dia.Piping M. 3525
40 mm nom. Dia.Piping M. 1520
50 mm nom. Dia.Piping M. 2540
65 mm nom. Dia.Piping M. 475
100 mm nom. Dia.Piping M. 3775
150 mm nom. Dia.Piping M. 100
2‐Galvanized Steel Pipes
Supply, install, connect and test sprinkler drainage
galvanizedblack steel pipe (ERW) piping system complete,
including but not limited to pipes & fittings, supports &
hangers, sleeves & inserts, piping identifications, and all
couplings and adapters as per A.S.T.M. A‐53 schedule 40, all
as specified and as shown on drawings.
50 mm nom. Dia.Piping M. 60
75 mm nom. Dia.Piping M. 120
15111 VALVES
1‐O.S. & Y gate valves
Supplying installing, connecting and testing of O.S. & Y gate
valves with tamper (supervisory) switches to be installed on
sprinkler zone branch pipes and on riser bases, all as
specified in section 15315 and as shown on drawings.
100 mm Dia.Valves NO. 20
2‐Check valves
Supplying, installing, connecting and testing swing type check
valves to be installed on zone control stations , all as
specified in section 15315 and as shown on drawings.
100 mm Dia.Valves NO. 20
3‐Automatic Air Release
25 mm Dia.Valves NO. 8
4‐Pressure Reducing Valves
Supplying, installing, connecting and testing of pressure
reducing valves (PRV) to discharge at 12 bar (175 PSI)
downstream pressure , complete with all valves , pressure
gauge as shown on drawings.
100 mm Nom. Dia. Pressure Reducing Valves NO. 8
SHAKER Consultancy Group
Rev. 1 ‐ 27 Sep., 2018.
SCG-2423-19A_20A-BOQ-F-X-001-FC-01.xlsx Page 5 of 9
Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (Building)
BOQ
Total
Sec. ITEM
ITEM ITEM Unit Rate Amount Notes
No. DESCRIPTION
UNIT Qty. EGP EGP
Division 15 (FIRE PROTECTION WORKS)
5‐Drainage Valves
Supplying, installing and connecting, gate valve of 50 mm
NO. 20
diam. at the end of the main pipes.
15300 SPRINKLER PIPE FIRE SUPPRESSION SYSTEMS
1‐ Water Flow Switch
Supplying, installing, connecting and testing of vane‐type,
weather proof dust tight construction housing water flow
switches to be installed on zone sprinkler branch pipes and
on bottom of risers, all as specified in section 15330 and as
shown on drawings.
100 mm Dia.Valves NO. 20
2‐ Inspectors test & Drain Valve
Supplying, installing, connecting, and testing of 50 mm diam.
inspector's test and drain assembly consisting of a single self
locking operating handle drilled for seal, 50 mm diam orifice
plate giving a flow equivalent to one operating sprinkler
NO. 20
head, two self draining cleanable sight glasses and all other
accessories required for the complete assembly, as specified
in section 15330 and as shown on drawings.
3‐ Pendant Sprinklers
Supplying, installing, connecting and testing of 15 mm
pendant concealed quick response sprinkler heads to be NO. 4177
installed in finished areas.
4‐ Upright Sprinklers
Supplying installing, connecting and testing of 15 mm up‐
right sprinkler heads to be installed in unfinished areas
NO. 4595
(without false ceilings) and high ceiling void areas.
5‐ Side Wall Sprinklers
Supply , install , connect and test of 15 mm extended
coverage side wall sprinkler with K‐Factor (5.65) to be
NO. 42
installed in all areas without false ceiling all as specified and
as shown on drawing .
6‐ Closed space Sprinklers
Supplying, installing, connecting and testing of 15 mm closed
space quick response sprinkler heads to be installed in NO. 18
finished areas.
SHAKER Consultancy Group
Rev. 1 ‐ 27 Sep., 2018.
SCG-2423-19A_20A-BOQ-F-X-001-FC-01.xlsx Page 6 of 9
Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (Building)
BOQ
Total
Sec. ITEM
ITEM ITEM Unit Rate Amount Notes
No. DESCRIPTION
UNIT Qty. EGP EGP
Division 15 (FIRE PROTECTION WORKS)
15305 NOVEC Clean Agent Extinguishing System
Supply and install total flooding automatic fire extinguishing
system of 4.5 % concentration by volume of FK‐5‐1‐12
(NOVEC) in Maximum 5 seconds discharge time, system shall
be complete including but not limited to the following
cylinders, manifolds, nozzles, piping work, control panels,
detectors, alarm horns, abort switch, flashing devices
switches, batteries annuciators, manual pull stations, all
accessories and control cabinets all as specified.
System (01) ‐ Main telecom room, Ground floor
MAIN: 2 cyl. X 100 = 200 kg. NO. 1
System (02) ‐ RMU room, Ground floor
MAIN: 2 cyl. X 90 = 180 kg. NO. 1
System (03) ‐ Meduim voltage room, Ground floor
MAIN: 2 cyl. X 140 = 280 kg. NO. 1
System (04) ‐ Battery room, Ground floor
MAIN: 1 cyl. X 50 = 50 kg. NO. 1
System (05) ‐ Fire Command Center, Ground floor
MAIN: 1 cyl. X 175 = 175 kg. NO. 1
15301 FOAM FIRE SUPPRESSION SYSTEM
Supply, install, connect, test and commissioning a fixed, skid
mounted self contained, constant flow induction type foam
system to be installed on the generator, system shall be
complete using film forming flouoroprotein (FFFP) foam
compounds at 3% induction and including oscillating
monitors, nozzles, foam tank, foam pump, relief valve,
strainers, all inter‐connect piping work and ancillaries with all
necessary fire extinguishers, all as specified and as shown on
drawings.
System (01) ‐ Generator Room, Ground, 65 gallon. NO. 1
System (02) ‐ Generator Room, Ground, 65 gallon. NO. 1
15304 FIRE STANDPIPE SYSTEM
1‐ Fire Hose Station
Supplying, installing, connecting and testing of fire hose
stations ( FHS ) with fire extinguishers consisting of 40 mm
pressure restricting type brass control valve with 65 PSI
down stream pressure, fire hose reel, fire hose 25 mm Dia.
and 30 m long, 65 mm diam. fire department landing valves,
NO. 54
pressure restricting type with 100 PSI down stream pressure
having connections, nozzle, steel cabinet, fire extinguisher 6
k.g dry powder and all adapters and fittings required for the
complete assembly as specified and as shown on drawings.
SHAKER Consultancy Group
Rev. 1 ‐ 27 Sep., 2018.
SCG-2423-19A_20A-BOQ-F-X-001-FC-01.xlsx Page 7 of 9
Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (Building)
BOQ
Total
Sec. ITEM
ITEM ITEM Unit Rate Amount Notes
No. DESCRIPTION
UNIT Qty. EGP EGP
Division 15 (FIRE PROTECTION WORKS)
2‐ Fire Extinguishers
Supplying, installing, connecting and testing of dry powder
manual, portable, hand held, fire extinguishers to be installed
all around the building, in addition to CO2 manual fire
extinguishers to be used in electrical and mechanical rooms
all as specified in section 15375 and as shown on drawings.
6 kg cap. dry powder fire extinguishers. FE‐1 NO. 96
6 kg cap. CO2 fire extinguishers. FE‐2 NO. 96
6 kg cap. K‐TYPE fire extinguishers. FE‐3 NO. 18
Fire Blanket NO. 18
TOTAL FIRE PROTECTION WORKS
SHAKER Consultancy Group
Rev. 1 ‐ 27 Sep., 2018.
SCG-2423-19A_20A-BOQ-F-X-001-FC-01.xlsx Page 8 of 9
Government District At New Capital ‐Minsitreis Building (Cluster 19A_20A) (SITE LAYOUT)
BOQ
Total
Sec. ITEM ITEM ITEM Unit Rate
Amount Notes
No. DESCRIPTION UNIT Qty. EGP
EGP
Division 15 (FIRE PROTECTION WORKS)
15101 Piping & Fitting Materials
1‐ERW Pipes
Supply , install , connecting and test of electric‐resistance‐
welded black steel pipe (ERW) as per ASTM. A53 Schedule 40
for fire protection piping system complete including pipes,
fittings , supports , hangers , seismic support, inserts and all
couplings and adapters all as specified and as shown on
drawings.
150 mm nom. Dia.Piping M. 10
15304 FIRE STANDPIPE SYSTEM
1‐ Siamese with Fire Hydrant
Supply , install , connect and test of siamese with fire hydrant
connection 150X65X65X65X65 outlets, pedistal type
NO. 2
including all requirement valves, check valves & all
accessories as specifeed and as shown on drawings.
TOTAL FIRE PROTECTION WORKS