If Post-Review,Plan-Goods
Public Disclosure Authorized
Date of General Procurement Notice 10 November 2008 Posted on line No-objection Dates are Not Required
including specs and SPN
Loan #:4458 ET, Grant # H395-ET BASIC DATA Bidding Period Bid Evaluation Contract Finalization Contract Implementation
quantities, draft SPN Advert
On-line
Prior/ Prep & Bid Submission No- Plan Contract Date Date Opening Arrival Inspection
Package Lot Estimated Proc. Plan vs. No-objection UNDB Bid Closing-
Description* Post Submission Invitation Bid Eval objection vs. Amount in Contract Contract of of Final
Number Num Am’t US$ Method Actual Date Gateway Opening
Review. Date Date Rpt Date Actual US$’000 Award Signature LC Goods Acceptance
Nat Press
Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks Plan 1 wk 1.5-3 wks
Norm Duration of Proc Steps
Actual Actual
List of Contracts
Motor cycle Qty 135 for new and existing weredas) IV 473.00 Plan
Actual Actual
Sub Total 2,223.00
Plan
Radio Transmitter for new 20 Longbase for 16 MSTs Plan 27/04/09 04/05/09 03/06/09 03/07/09 13/07/09 Actual 18/07/09 28/07/09 26/09/09 11/10/09
2 and 4 RPCUs
F/NCB/Y1/01 I 100.00 NCB Post
Plan
Public Disclosure Authorized
Actual Actual
Sub Total 10.00
Specialized equipments (GPS Devices, GPS software,
AO Plotterand other Office machine ArcGIS
Sostware, MCAfee anti Virus, Red hat linux, Plan 31/07/09 07/08/09 06/09/09 27/09/09 Plan 07/10/09 22/10/09 21/12/09 11/01/10
8 GPS+pocket PC, Note Books, Projectors, Cisco F/NCB/Y1/04 I 181.00 NCB Post
Routers-switchj and fix, and other Apparatus for Early
warning Offices Actual Actual
Sub Total 181.00
I
Somali Region: Office equipment and office Plan 20/07/08 04/08/08 03/09/08 01/10/08 Plan 16/10/08 31/10/08 30/11/08 15/12/08
losure Authorized
I
Somali Region:Office equipment & furniture for Plan 25/08/09 09/09/09 09/10/09 06/11/09 Plan 21/11/09 06/12/09 03/10/10 18/10/10
10 RPCU and existing weredas,
Somali-NCB 55.00 NCB Post
II
Actual Actual
Somali Reg. Sub Total 145.00
496250PROP0p101ement0Plan0July02009.xls 1 of 10 7/30/2009 11:50 PM
Date of General Procurement Notice 10 November 2008 Posted on line Draft Bid Documents, Procurement
If Post-Review,Plan-Goods
No-objection Dates are Not Required
including specs and SPN
Loan #:4458 ET, Grant # H395-ET BASIC DATA Bidding Period Bid Evaluation Contract Finalization Contract Implementation
quantities, draft SPN Advert
On-line
Prior/ Prep & Bid Submission No- Plan Contract Date Date Opening Arrival Inspection
Package Lot Estimated Proc. Plan vs. No-objection UNDB Bid Closing-
Description* Post Submission Invitation Bid Eval objection vs. Amount in Contract Contract of of Final
Number Num Am’t US$ Method Actual Date Gateway Opening
Review. Date Date Rpt Date Actual US$’000 Award Signature LC Goods Acceptance
Nat Press
Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks Plan 1 wk 1.5-3 wks
Norm Duration of Proc Steps
Actual Actual
List of Contracts
I
Afar Region: Office furniture & equipment for 6 Plan 20/07/08 04/08/08 03/09/08 01/10/08 Plan 16/10/08 31/10/08 30/11/08 15/12/08
11 Afar-NCB 80.00 NCB Post
new weredas
II
Actual Actual
I
Afar Region:Office equipment & furniture for RPCU Plan 25/08/09 09/09/09 09/10/09 06/11/09 Plan 21/11/09 06/12/09 03/10/10 18/10/10
12 Afar-NCB 50.00 NCB Post
and existing weredas,
II
Actual Actual
Afar Reg. Sub Total 130.00
I
Oromia Region: Office furniture & equipment for 7 Plan 15/07/09 30/07/09 29/08/09 26/09/09 Plan 11/10/09 26/10/09 25/11/09 10/12/09
13 Oro-NCB 85.00 NCB Post
new weredas
II
Actual Actual
I
Oromia Region: Office equipment & furniture for Plan 20/08/09 04/09/09 04/10/09 01/11/09 Plan 16/11/09 01/12/09 31/12/09 15/01/10
14 Oro-NCB 50.00 NCB Post
RPCU and existing weredas,
II
Actual Actual
Oromia Reg. Sub Total 135.00
I
SNNP Region: Office furniture & equipment for 4 Plan 15/07/09 30/07/09 29/08/09 26/09/09 Plan 11/10/09 26/10/09 25/11/09 10/12/09
15 new weredas
SNNP-NCB 50.00 NCB Post
II
Actual Actual
I
SNNP Region: Office equipment & furniture for Plan 20/08/09 04/09/09 04/10/09 01/11/09 Plan 16/11/09 01/12/09 30/01/10 01/03/10
16 RPCU and existing weredas,
SNNP-NCB 40.00 NCB Post
II
Actual Actual
SNNP Reg. Sub Total with 10% contingency 90.00
Computer Printers and Ups Qty 146 (4 for FEWRD,
126 for weredas each, 6 for Zonal and 10 for region
17 Early warning response offices and Database server F/NCB/Y2/01 I 365.00 NCB Post Plan 30/10/09 14/11/09 14/12/09 04/01/10 Plan 19/01/10 29/01/10 29/04/10 20/05/10
for FEWRD & REWB each) , laptop computers,
severs external drives, UPS colour p[rinters
Actual Actual
Year 2 Sub Total 365.00
Motor cycle Qty 126 for EWR one per pastoral and
18 agro-pastoral wereda
F/NCB/Y2/03 I 441.00 NCB Post Plan 15/11/09 30/11/09 30/12/09 20/01/10 Plan 04/02/10 14/02/10 15/05/10 05/06/10
Actual Actual
Year 2 Sub Total 441.00
Hardwares for WAN/LAN conection and connection Plan 01/12/09 16/12/09 15/01/10 12/02/10 Plan 27/02/10 14/03/10 13/04/10 28/04/10
19 materials to RPCU/PCDP weredas
F/NCB/Y2/01 I 90.00 NCB Post
Actual Actual
Sub Total 90.00
Total Cost for the first 18 months 4,429.00
Un allocated for Goods 1,060.00
Note
1. the basis of this revised procurement plan is the Aide Memoire of the Review and Implementation Support Mission conducted May 14-29, 2009. Accordingly inclusion of some recommended items and rescheduling of procurement process are reiterated.
2. The current trend of Foreign currency shortage may cuase delay in opening of LC for bidders competing under NCB
3. Goods under: Som/G/NS/Y1, Afa/G/NS/Y1, Oro/G/NS/Y1 and SNN/G/NS/Y1 are expected to be be procured around the respective regional and nearby cities.
4. WAN/LAN hardware connection devices, Computers and Motorcycles for Early Warning response offfices are planned to be procured in year 2 of the project period
5. Un-allocated cost estimate is earmarked for replacements of goods for existing weredas and any un-identified needs of additional 25 weredas for immediate future and to be iterated in the next periodical PP revision if necessitated
6. Estimated budget for Items which have been included in this procurement plan are reallocated from other packages having excessive quantity and cost estimate. One of the scaled down package in this regard is GPS and A0 Ploter
weredas
Q
Actual
221.00
Actual
80.00
Undertake Social Analysis on 23 Plan 15/07/09 25/07/09 04/08/09 19/08/09 03/09/09 13/09/09
2
BS
Actual
75.00
Preparation of Guideline and
Provision of Training and Technical Plan 01/08/09 11/08/09 21/08/09 05/09/09 20/09/09 30/09/09
3
BS
DPSIP Actual
100.00
Actual
15.00
weredas
Q
Actual
277.00
Underatke Mid Term Project
5
B
C
Evaluation Procurement Plan-Consultants
Q
Actual
143.00
Total Cost with 10% price and physical contingency 1,002.10
unallocated 50.00
weredas
Q
Actual
Actual
Undertake Social Analysis on 23 Plan 23/09/09 23/10/09 13/11/09 07/03/10 21/03/10 04/04/10
2
BS
New weredas
C
Q
Actual
DPSIP Actual
weredas
Q
Actual
B
C
Evaluation Procurement Plan-Consultants
Q
Actual
weredas
Q
Actual Actual
Actual Actual
New weredas
C
Q
Actual Actual
11/06/09
PCDP I Sub-Projects
/
IC
weredas
Q
Actual Actual
B
C
Evaluation Procurement Plan-Consultants
Q
Actual Actual
Note
1. After assessments of potential firms for radio program production and broadcasting service FPCU has found only one eligible private firm with a capacity
having full coverage of radio broadcasting widely and clearly reach all pastoral and agro-pastoral areas of the country using four major languages.
2. Radio fana is the only private firm having full coverage of radio broadcasting its programs to pastoral areas of Somali, Afar, SNNP and Oramiya regions in their respective
3. The air time purchase will be based on time alotted for each agreed means of media(language) subject to periodic supervision, monitoring and evaluation against
3. Its institutional capacities are dependable both the audiences perception and from PCDP satisfaction during radio program transmission conducted during PCDP phase one
4. FPCU, threfore, believed no other legally and technically competent firm with regard to the coverage, apprpriate media types and proven institutional capacity to properly d
5. For the fact that it will be dealt with single service provider, the Draft TOR as well as the Draft contract will be a subject of prior review.
6. The proposed media firm (Radio Fana) has also commenn development objective as manifested in its proposal up to 70 % cost sharing and 30 % of the cost to be
No-objection Dates are Not Required
Inspectio
Submissio Contract
No- Date Date n
n Plan vs. Amount start completion
objection Contract Contract Final
Bid Eval Actual in date date
Date Award Signature Acceptan
Rpt US$’000
ce
1.5 - 3 wks 1 - 1.5 wks Plan 1 wk 1.5-3 wks
Actual
Actual
regions in their respective local languages namely Afarigna, Somaligna, Oromifaa, and Amharic
g and evaluation against clear scope of asignment depicted in the TOR.
d during PCDP phase one
onal capacity to properly disseminate the intended assignment up to the required extent.