Steel Project 2010-2011 1st Term LECTURE03
Steel Project 2010-2011 1st Term LECTURE03
Oct.18, 2010
STEEL
PROJECT
1st term
(Ref: CES499)
4th year structural department
Ain Shams University
2010-2011
By
Dr. Ahmed Matloub
ahmedmatloub@yahoo.com
CONTINUE LAST
LECTURE …..
Check that columns and beams
are connected each other
Merge the duplicated joints at
same coordinates
Notice
the units
Define the steel properties
Define steel cross-sections
Notice
the units
Define built-up I-section (flange 200x16 & web 400x8)
Define steel cross-sections
Define tapered built-up I-section
(flange 200x16 & web 600/400x8)
View the local axes of
the frame elements
Reverse
local axes
of the
selected
elements
Assign the cross-
sections of the
frame elements
Check the cross-section
of the frame elements
Increase the font size to
be readable
Check the cross-section
of the frame elements
Assign the restraints of
the hinged bases
Assign intermediate
hinges of simple beams
CASES OF LOADING
Important for minimum load
where:
D=dead load+own weight LL=live left span LR=live right span
LM=live mid span WL=wind from left WR=wind from right
CVL=crane max. vertical at left CVR=crane max. vertical at right
CASES OF LOADING cont’
Important for minimum load
where:
CHLL=crane max. horizontal at left from left side
CHLR=crane max. horizontal at left from right side
CHRL=crane max. horizontal at right from left side
CHRR=crane max. horizontal at right from right side
CASES OF LOADING cont’
Case A Case B
00 30 40 10 20 50 60 70 80
01 31 41 11 21 51 61 71 81
02 32 42 12 22 52 62 72 82
03 33 43 13 23 53 63 73 83
04 34 44 14 24 54 64 74 84
05 35 45 15 25 55 65 75 85
06 36 46 16 26 56 66 76 86
07 37 47 17 27 57 67 77 87
20 21 22 23
18 19 24 25 26
05 12 R2
04 R1 R1 11 27 28
10 29 30
03 09
16
02
31 B1
h 08 15
2/3 h 07 14
01 06 17 13
C1 C2 C4 C3
MAIN SECTIONS cont’
Sections position design
01,06,13,17 column base C1,C2,C3,C4 and bases
02 at 2/3 height of tapered column1 check C1
03,04 below & above crane bracket C1
05,12,16 at columns top ends C1,C2,C3
07,08 below & above mezzanine floor C2
09 below rafter C2
10,11 below & above crane bracket C2
14,15 below & above mezzanine floor C3
18,26,27,30 (design rigid connection between rafter and column)
19,21,23,25,29 ends of haunches R1,R2
20,24,28 mid spans of rafters R1,R2
22 (design rigid connection between two rafters)
31 mid span of mezzanine beam B1