Steel Projects 2010-2011 1st Term

You might also like

Download as pdf
Download as pdf
You are on page 1of 12
AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (01) pagel/2 ‘The given area belongs to an investor who will construct a small industrial factory shown in the figure. The factory contains a main building with span B1. height Hl, crane P ton capacity and two administration buildings with equal spans B2. One of the administration buildings with height H2 is used as a full height storage area, The other one is containing a mezzanine floor with height 3.00 m to provide many offices in the upper floor, while the ground floor is used as a small exhibition for the factory products with height 4.00 m. The main dimensions of the different parts of the factory are given in the attached table. qm @ l IIL HEH EVATION 3 in ELEVATION T AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (01) page2/2 Nouiaixa onicrinalvek o 2? & GROUND FLOOR PLAN MEZZANINE FLOOR PLAN AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (02) page 1/2 A factory for manufacturing electrical machines will be constructed on the shown area. The factory accommodates both of machine hall, welding area and stores for the raw materials and end products, The factory is provided with longitudinal overhead crane P1 ton capacity with span B and spacing between main supporting systems S. Minimum clear height HI is required for the factory. The machine hall between axis 2 & 3 is required with minimum clear height H2 and transverse overhead crane P2 ton capacity. The main dimensions of the factory are given in the attached table. AIN SHAMS UNIVERSITY FACULTY OF ENGINEERING STRUCTURAL ENGINERING DEPARTMENT 2010 - 2011 FOURTH YEAR CIVIL STRUCTURAL ENGINEERING DIVISION STEEL STRUCTURES PROJECT PROJECT No. (02) page 2/2 AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (03) page 1/2 A glazed tile factory is to be constructed at SUEZ city. The factory is containing two buildings with equal span B and two diffemet heights H1 and H2. The higher building with height H2 is used as a working area and an overhead crane of capacity P tons cover the longitudinal direction of it, The other building is used as a storage area, Additional two spacings with mezzanine floor are available at the factory end for the offices. The plan and the cross sections of the factory are shown in the drawings. The main dimensions of the factory are given in the attached table: G®@OOHOOOOO (Ha) (nt) AXIS (1-1) SG®@®@OOOOHOGBOSO Gm) sys ys ssysysysyjsys AXIS_(3-3) S®B®@OPOOHOOOO i) AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (03) page 2/2 AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (04) page 1/1 An industrial complex for brick production is to be constructed as shown on the given drawings. The factory is containing two adjacent buildings for the working area with unequal spans B1 and B2. The two buildings are covered with two overhead cranes of capacity P ton along length L = 48 m of the longitudinal direction of the factory with required column spacing S. The factory is to be extended with length 2*S for the offices. Minimum height H is required for the two buildings of the working area. The main dimensions of the factory are given in the attached table, AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (05) page 1/1 An industrial factory for ceramic pipe production is constructed using steel structure as shown in the given drawing. The main building contains workshop area with crane of capacity P ton and span B1, inaddition of mezzanine area for the offices with span 6.00 m. Minimum clear height H and spacing between columns $ are required for the workshop area, The factory is extended with adjacent building divided into two parts, a mezzanine floor with span 6.00 m and a storage area with span B2. The main dimensions of the factory are given in the attached table. a CRANE P ton AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (06) page 1/2 A car painting workshop of area L * B is required to be constructed over the area shown in the given srawings. The factory length L is divided into three equal parts. The middle one is provided with heavy overhead crane of capacity P ton, The workshop is provided with a mezzanine floor as shown in the architectural drawings. The floor system of each floor is reinforced concrete slabs supported over steel beams. The final roof is covered by inclined steel frames with one slope only and provided with sky lights as shown, Minimum clear height H is required for the factory. The main dimensions of the different parts of the factory are given in the attached table, CRANE P ton AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECT No. (06) page 2/2 ® ® AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECTS DIMENSIONS —_page 1/2 The main dimensions of the different parts of all projects are given in the following tables. PROJECT (01 ): BI 1d. 20 POLS POL-10 POL-lL PoI-12 POI-13 Pol-l4 Polls POl-l6 PO2-1T P0212 PO2-13 PO2-14 02-15 02-165 PROJECT la. 1. 03-9 PO3-10 03-11 PO4-12 POS-13, 06-14 PO7-IS POR-16 AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT 2010 - 2011 PROJECTS DIMENSIONS —_page2/2. The main dimensions of the different parts of all projects are given in the following tables. PROJECT (04 ): BI 1d. 36 O49 POS-10 POs-I1 PO4-12 PO4-13 Pos-4 POs-15 POs-16 1. POS-9 POS-10 POS-11 05-12 OS-13, POS-14 POS-15 05-16) PROJECT la.

You might also like