2010 - 2011 PROJECT No. (01) pagel/2
‘The given area belongs to an investor who will construct a small industrial factory shown in the figure.
The factory contains a main building with span B1. height Hl, crane P ton capacity and two
administration buildings with equal spans B2. One of the administration buildings with height H2 is
used as a full height storage area, The other one is containing a mezzanine floor with height 3.00 m to
provide many offices in the upper floor, while the ground floor is used as a small exhibition for the
factory products with height 4.00 m. The main dimensions of the different parts of the factory are
given in the attached table.
qm
@
l IIL
HEH
EVATION 3
in
ELEVATION TAIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECT No. (01) page2/2
Nouiaixa
onicrinalvek
o 2? &
GROUND FLOOR PLAN MEZZANINE FLOOR PLANAIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECT No. (02) page 1/2
A factory for manufacturing electrical machines will be constructed on the shown area. The factory
accommodates both of machine hall, welding area and stores for the raw materials and end products,
The factory is provided with longitudinal overhead crane P1 ton capacity with span B and spacing
between main supporting systems S. Minimum clear height HI is required for the factory. The
machine hall between axis 2 & 3 is required with minimum clear height H2 and transverse overhead
crane P2 ton capacity. The main dimensions of the factory are given in the attached table.AIN SHAMS UNIVERSITY
FACULTY OF ENGINEERING
STRUCTURAL ENGINERING DEPARTMENT
2010 - 2011
FOURTH YEAR CIVIL
STRUCTURAL ENGINEERING DIVISION
STEEL STRUCTURES PROJECT
PROJECT No. (02)
page 2/2AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECT No. (03) page 1/2
A glazed tile factory is to be constructed at SUEZ city. The factory is containing two buildings with
equal span B and two diffemet heights H1 and H2. The higher building with height H2 is used as a
working area and an overhead crane of capacity P tons cover the longitudinal direction of it, The other
building is used as a storage area, Additional two spacings with mezzanine floor are available at the
factory end for the offices. The plan and the cross sections of the factory are shown in the drawings.
The main dimensions of the factory are given in the attached table:
G®@OOHOOOOO
(Ha)
(nt)
AXIS (1-1)
SG®@®@OOOOHOGBOSO
Gm)
sys ys ssysysysyjsys
AXIS_(3-3)
S®B®@OPOOHOOOO
i)AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECT No. (03) page 2/2AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECT No. (04) page 1/1
An industrial complex for brick production is to be constructed as shown on the given drawings. The
factory is containing two adjacent buildings for the working area with unequal spans B1 and B2. The
two buildings are covered with two overhead cranes of capacity P ton along length L = 48 m of the
longitudinal direction of the factory with required column spacing S. The factory is to be extended
with length 2*S for the offices. Minimum height H is required for the two buildings of the working
area. The main dimensions of the factory are given in the attached table,AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECT No. (05) page 1/1
An industrial factory for ceramic pipe production is constructed using steel structure as shown in the
given drawing. The main building contains workshop area with crane of capacity P ton and span B1,
inaddition of mezzanine area for the offices with span 6.00 m. Minimum clear height H and spacing
between columns $ are required for the workshop area, The factory is extended with adjacent building
divided into two parts, a mezzanine floor with span 6.00 m and a storage area with span B2. The main
dimensions of the factory are given in the attached table.
a
CRANE P tonAIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECT No. (06) page 1/2
A car painting workshop of area L * B is required to be constructed over the area shown in the given
srawings. The factory length L is divided into three equal parts. The middle one is provided with heavy
overhead crane of capacity P ton, The workshop is provided with a mezzanine floor as shown in the
architectural drawings. The floor system of each floor is reinforced concrete slabs supported over steel
beams. The final roof is covered by inclined steel frames with one slope only and provided with sky
lights as shown, Minimum clear height H is required for the factory. The main dimensions of the
different parts of the factory are given in the attached table,
CRANE P tonAIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECT No. (06) page 2/2
® ®AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECTS DIMENSIONS —_page 1/2
The main dimensions of the different parts of all projects are given in the following tables.
PROJECT (01 ):
BI 1d.
20 POLS
POL-10
POL-lL
PoI-12
POI-13
Pol-l4
Polls
POl-l6
PO2-1T
P0212
PO2-13
PO2-14
02-15
02-165
PROJECT
la.
1.
03-9
PO3-10
03-11
PO4-12
POS-13,
06-14
PO7-IS
POR-16AIN SHAMS UNIVERSITY FOURTH YEAR CIVIL
FACULTY OF ENGINEERING STRUCTURAL ENGINEERING DIVISION
STRUCTURAL ENGINERING DEPARTMENT STEEL STRUCTURES PROJECT
2010 - 2011 PROJECTS DIMENSIONS —_page2/2.
The main dimensions of the different parts of all projects are given in the following tables.
PROJECT (04 ):
BI 1d.
36 O49
POS-10
POs-I1
PO4-12
PO4-13
Pos-4
POs-15
POs-16
1.
POS-9
POS-10
POS-11
05-12
OS-13,
POS-14
POS-15
05-16)
PROJECT
la.