DATE 44 SEPTEMBER 2022
To Mr. Ricardo Sinangote
‘SUBJECT ‘SCOPE OF WORK CONFIRMATION
Dear Mr. Ricardo Sinangote,
Regarding to our previous reconciled scope of work for “Guard House Rehabiltation’ | would lke to recuest for your
confirmation for the scope of work ifthe following wers included in your cost proposal,
Painting Works (Interior & Exterior Paint) ~ Color for Approval
Ceiling works for Northwest Gate (Interior & Exterior Ceiling);
Replacement of Roofinc with big holes and deformations with same speciications as installed;
Cabinet Replacement at North West Gate Guard House;
Moveable Concrete Steps (Please provide shop drawing);
All wall panels with damages shall be replaced;
Columns & Rafters wil be replaced if damaged (Tango-3 at Foxtrat-2)
Pease contact us for any clerifications. Please see below contact details for your reference.
Engr. Michael Pefia; Contact No. 0917-857-4974; E-rall Add, michaeipena.sepi@amail;com
Engr. Rhea Sebastian; Contact No, 0965-526-3069; E-mail Add. rheasebastian sepi@amail.com
Thank you.
ENGR. MICHAEL KEVIN C. PERNA
Project Site/Office Engineer
Conformed by:
MR, RICARDO SINANGOTE Date
Principal Office Address. : Bo. Mali, Sta Rosa Cty, Laguna, Philipines, Telefax No. (049) 549-2522
[Administration Office Address. : 3° Floor, Urba1 Building, 405 Sen. Gil Puyat Avenue, Makati City, Pilppines
Tel. Nos. : 886-6176/79; 889-6170; 869-6181, Fax Nc. 886-6175,