CASE STUDY 1: LUNA APA RTMENT Week 1 CASE S T UDY 2: T HE B L OCK

Project Initiation

In this case, the main


contractor involved at
this early stage - Project
Intiation - in order to
bring the project on a
fast-track.

Due to the close relationship between


Project Manager and the client,
Project Manager involved in and co-
ordinates all information with other
consultants.

Key deliverables at this stage are the client’s brief, budget, preferred procurement The Block required a fast-track process so it is different from a regular schedule.
strategy, timeframe, who is the key contactor(decision maker), any third party The Main Contractor involved at this early stage to shorten the procurement in
stake-holders involved, design constraints, and Territorial Authority require- order to get the design executive as soon as possible. In this case, there is a third
ments. In this case, Luna Apartment had one decision maker, the chairman of the party stakeholder, TV3, who responded to the outcome as well but do not have a
Body Corporate, who represents the committee to communicate their thoughts monetary connection with Architect directly.
with the Architect. The project Manager established the connection between the
client - Body Corporate Committee, and the Architect, so this role involved to
co-ordinate information.
CASE STUDY 1: LUNA APA RTMENT Week 2 CASE S T UDY 2: T HE B L OCK
Concept Design

Concept Design phase is about to generate response to the brief. In this period, In this case, Architect work with consultantcy closely as usual, and get Client
Luna apartments had six options for its remediation. Each one had to be discussed involved in this phase as well. In order to bring the project on a fast track,
with consultation such as Facade Engineer, Structural Engineer to have overall Client’s decision is a key. Client is required to attend Design Team meeting
understanding on the possibilities and limitations. During this period, Architect to quickly process concepts. This phase will relatively leave Main Contractor
would communicate with QS to have quatation of each option. Meanwhile, less communication until the team has an excutive scheme that satisfiy all
Architecte will speak to both Project Manager and Client to narrow the options stakeholders. The concept will be agreed during the meeting to make desicion
down. Architect will present a couple of concepts for client to review, then collect faster.
feedback to refine the concept.