PITCH 18°
2" x 2" reapers
1''x9''
board
16
15
16'-3"
16'
15'
14'
12.5
12'-3"
7'-8"
27'-11"
3'
10'
9'-11"
7'
8'-2"
7'-7"
FRONT ELEVATION. LEFT SIDE ELEVATION. BACK SIDE ELEVATION. SECTIONAL A-A
2" x 2" reapers
d2 -2'-6"
10'
8'-6"
6'-3"
5'
store
w2 room
C
20'-5"
o
1'-10"
19'
19'
18'-2"
p
e OPEN VERANDAH
15'-2"
5'
15'
n -2'-6" dw 13'
10'
bed room
12'-8"
v
13'
a
15'-6"
13'-3"
9'-1"
r -2'-0"
n d2
w2
d 3'
11'-9"
15'
5"
9"
a
-2'-0"
18'-1"
h
5' 10'
14'-7"
1''x9''
10'
12'
3'
10'-11"
7'-10"
8'-6"
7'
1'-10"
DN bath room board
7'-7"
10'
9'-6"
9'
9" 9"
8'-8"
2'
8'-2"
+0'-6"
6"
w2 bed room 9"
2'
1'
+1'-0" 7'
12'
6"
1'-6"
6"
10'-8" bath room
6"
SECTIONAL C-C
1'-10"
9' 11'
7'-3"
5'
SECTIONAL B-B
+1'-0" d2 d2
7' w2 bed room
10'
o
p kitchan
12'
e 16'-9" d2 d2
n 14'
w2
+1'-6" 6"
10'
3' w2 access openings
v
B d2
B
bed room 500mm min.
24'-6"
a 6"
13'
1'-10"
r
n UP 13'-8" ø 6"(150mm)
+1'-0" 11'-3" 6"(150mm)
d DN
B B 2'-0"
4'-0"
d1
13'-6"
o4"
a dining 4y12(04 nos)
2'3"
h area A A
10'
4y12(04 nos)
16'-9"
2'3"
5' d1
w1 UP +2'-0"
5'
5'
13'-6"
SEPTIC TANK ARRNGEMENT SEPTIC PIT ARRNGEMENT
A
6" 3"
17'-9"
A
10'
w4
10'
6" 3"
5' d2 3'
+0'-6" 9' 4"tk.1:2:4(12
5'
4"tk.1:2:4:(12
A
C
3'
A
1'
14' 6"(150mm)
1'-0" min
access openings
vent pipe o1
1'
-
+0 w2 6"(150mm)
500mm min. 1
2"min 4'-0"
G.L
G.L
C
1'
2" opening
15'
min 1
open jointed
2"tk 1:2
cement motar(1:5) 11.5000
ct.int
1'
m
3"
cement motar(1:5) depth
3'
mass con. 1:5 r.r masonary 9" tk
1'6"
8'-0"
2.5m min
GROUND FLOOR PLAN.
4" opening
3"
1
2") ct.con
3'
1.2m min
mass con. 2' base
1'6"
2' 0'-9" 0'-6"
DETAIL OF COLUMN FOOTING &
g.w.t.(seasonal height)
8'-0" 4'-0"
12 14'-0" SECTION A-A
FOUNDATION FOR BLIND WALL. 12
3' DETAIL OF COLUMN FOOTING & both ways
3'
both ways
FOUNDATION SEPTIC TANK & SOAKAGEPIT DETAILS
SCHEDULE OF OPANING. designed by : R.M.PARAKRAMA. DEATIAL OF DRAWING :
PROPOSED HOUSE
DIP. IN (CIVIL ENG.)