Professional Documents
Culture Documents
Prof Ethics Flash Card
Prof Ethics Flash Card
ated under
principles of the constitution; Crafted and passed by the congress RA No. 10350
Proclamation that declares every last week of May as “National Continuing Professional Education/Development
Interior Design Week”
CPE/CPD
Proclamation No. 390, Series of 2012
An area inside a building or room with respect to design and
Predecessor of RA No. 10350. “An Act Regulating The Practice of decoration, the purpose, the function and dimensions of which is
Interior Design In The Philippines” took effect on February 23, 1998 prescribed in the contract documents
Additional subject in the board exams as per declaration of RA No. Documents that form part of the legal contract for services between
10350 two or more parties
Objectives of RA No. 10350 Scope of work which may include but not limited to conducting
research; identifying and analyzing the requirements of clients
1. The examination, registration and licensure if professional ID
Programming
2. The supervision, control and regulation of the practice
When was the first ID licensure exams
3. The development of the professional competence of interior
designers through CPD Program August 22, 1983
Commission
Circular in form with a stylized human figure wearing a hat, arms An ID shall enjoy ______ over all drawings, specifications and other
outstretched upward; between his parted legs is a bahay-kubo; to his contract documents prepared by her.
right are three stars and rays of the sun; to his left are sampaguita
Proprietary Rights
flowers and laurel leaves
Official Seal of the Board Foreign and filipino designers working jointly on a special project shall
divide the professional fees and other charges from said project
All applicants for registration for the practice of interior designs shall _____________ according to their participation
be required to pass a _______ in such places and on such dates as
the Commission may designate Equitably
D. History of Arts and Interior Design D. Refusal to join or remain a member in good standing at AIPO
E. Interior Construction and Utilities E. Neglect or failure to pay annual registration fees
Offering of free preliminary sketches or other services without Shall not knowingly compete with other designers on the sole
basis of professional charges
benefit of an agreement
The IDr shall: Shall not seek commission already known to him as previously
endowed to another IDr.
Acquaint from the client of their business relationship the exact
Shall not undertake commission which he knows another IDr has
scope of services
already been previously employed until notified that original
Explain conditional character of estimates. Shall not mislead employment has been terminated.
client
Shall not knowingly injure falsely or maliciously the reputation,
prospects or practice of another IDr
Shall not engage as a competitor in any ID competition when he Types of legal issues that can be brought about by ethics
has direct relations with formulation of program
Non performance
Shall inspire loyalty with suitable working conditions
Slander
Unselfishly give his share in interchange Of technical
Injury
information and experience among colleagues
Non-compliance
Earnings usually take the following forms:
Negligence
Salary
Fixed contract amount for goods and services Can the designer change the percentages in the schedule of fees?
Carelessness or lack of diligence; consists in the omission of diligence The employer relieves the contractor of any liability for any defect in
that is required by the nature of the obligation the work
There is a ore existing obligation arising from a contract and there is Neither the employer nor the contractor or designer know how much
fault in carrying out such the job will cost until its completion
Where there is failure in performance of an obligation on time A fixed amount representing services rendered is agreed upon
constituting the breach beforehand between the designer or contractor who undertakes to do
the job on a cost plus fixed amount basis
Mora/ delay
Cost + fixed amount
Delay on the part of the creditor to accept the performance of the
obligation Compensation of the contractor designer is not fixed in that the exact
amount cannot be determined as well
Mora accipiendi
Cost + certain %
Delay of obligors in reciprocal obligations. Neutralizes the delay of the
debtor It has no effect at all; cannot be ratified nor validated
Includes delivery of money and performance of obligation in another It shall be obligatory in whatever form they might have been entered
manner to provided all the essential requisites for their validity are present
Payment Contract
Obligations arising from contracts have the force of law between the The life of the contract where its perms are being complied with or
contracting parties and should be complied with in good faith implemented
The contracting parties may establish stipulations, clauses, terms and Damages that are agreed upon by the parties to a contract to be paid
conditions as they may deem convenient provided that hey str nit in case of breach
contrary to law, morals good customs
Liquidated
Autonomy
Awarded to vindicate or recognize the right of the plaintiff which has
been violated
Nominal damages When a one storey building houses more than one occupancy, each
portion of the building shall_________________________
Imposed in addition to moral, temperate, liquidated or compensatory
damages as an example to the public good conform to the requirements of the particular occupancy housed
therein.
Exemplary or corrective damages
Eaves over required windows shall_________________
The adequate compensation for pecuniary loss suffered
Not be less than 750mm from the side and rear property lines
Actual or compensatory damages
Dwelling shall occupy not more than ___________ of a corner lot and
Payment made in good faith to any person in possession shall release
________ of an inside lot
the debtor
90%
Credit
80%
Group C occupancy
How many sanitary toilets and adequate washing and drainage should
Education and recreation
there be in every dwelling?
Group E occupancy
One
Business and mercantile
Minimum thickness and size below the surface of the ground of the
Group G occupancy foundation footings
Occupant load 1000 or more Minimum width height and run of stairs
Vertical 200mm
Horizontal 200mm
2.7m
Clear ceiling height above and below a mezzanine The clearance between the established grade of the street and the
lowest under surface of any part of the balcony shall not be less than
1.8m
3M
Minimum size and dimension of rooms for human habitation
Clear height of arcaded pedestrian walkways
6sqm
3M
Least dim: 2m
A permanent roofed structure above the door projecting over a wall or
Minimum size and dimension of rooms for bath and toilet
sidewalk
1.20sqm Canopy/marquee
Least t
Horizontal clearance between the outermost edge of the marquee and
Dim of 0.6m the curb line
Minimum air space for school rooms Not less than 300mm
12 cu. mts A non structural facing o brick ,concrete, tile, metal, plastic etc
attached to a backing or structural components of the building for the
Minimum air space for habitable rooms purpose of ornamentation, protection or enclosure
14 cu mts Veneer
Free area for window openings What veneer supports
10% of the floor area of the room No load other than its own weight
Percentage of the window that should remain unobstructed Number of exits on the floor above the first storey which had more
65% than 500-999 occupant load
Openings Number of exits on the floor above the first storey which had more
than 1000 or more occupant load
Spaces that should have artificial ventilation
4 exits
Spaces hosing industrial or heating equipment
Min Width and height of every required exit doorway The higher the load, the _____the aisle
900mm w Wider
Clear width of exit doorway when the door is full opened 1:8
700mm Minimum aisle with if serving only one side (another side is a wall)
Where required standard fire extinguisher should be installed Laminated safety glass (6.4mm thk)
Every storey, basement, cellsr with area of 200 sqm if more with Maximum least dimension of a glass light
occupant load of 20
450mm
Characteristic of wall boards
Signs written on a foreign language should have a/an ______
Fire resistive
English translation or local dialect
Minimum dimension of openings with approved plastic
Buildings or structures intended to be used for the manufacture and or
600mm any kind of article or product shall observe adequate _________
The building official is authorized to order the _______ of the Group J occupancy
occupancy or use of any building or structure or portion thereof found
Accessory
to be occupied or used contrary to the provisions of section 208
What happens if there is a change in the character of occupancy
Discontinuance
A. Subject for approval of building official
Industrial establishments shall be provided with positive ________ to
tone down the noise level of equipment and machineries to B. Provide new proposed use to be less hazardous
acceptable limits set down by DOLE and DENR
Types of occupancy separation
Noise-abatement materials
One
May be recovered when the court finds that some pecuniary loss has
been suffered Two
Estimated reparation in money for detriment or injury sustained as Four— hour fire resistive
caused by violation of a legal right No building should be constructed unless it has __________
Damages Direct access to a public space, yard or street on at least one of
May be recovered if they are the proximate cause or result of the Its sides
defendant’s wrongful act or omission Minimum setback from property line
Moral damages 2 meters
Group A occupancy Live load on the second floor
1. Residential for single families 150 kg/sqm
2. Residential (townhouses, dorms, duplex) 1 storey ceiling ht minimum w artificial ventilation
10 people or less 2.4m
Group B occupancy Ceiling hts of Buildings with more than one storey
Apartments, hotels, buildings that accommodate more than 10 Ground floor: 2.7m
people
Second floor : 2.4m
Group D occupancy
Succeeding floors: 2.1m unobstructed vertical clearance
Intstitutional
Minimum size and dimension of rooms for kitchens
Group F occupancy
3 sqm
Min Projection from the side and rear property lines of eaves, 6 meters
canopies and awnings
Width of staircase with occupant load of less than 50
750mm
900mm
Minimum clear opening of windows as emergency egress
Width of staircase with occupant load of less than 10
820mm and 1m ht
750mm
All buildings with _____ and or _____ construction shall be provided
Standard rise and run of stairways
with ratproofing
Awning 300mm
Number of exits on the floor above the first storey which had more 1 meter
than 10 occupant load Area that connects the foyer and main area
2 Vomitories
Max door leaf angle at exit doors Spacing of rows of seats from back to back
90 degrees Min 840mm
Max width of an exit doorway Clear space for rows of 35 or less
1200mm 500mm
Max ht of exterior landing from exit door Maximum rise of a row
200mm 400mm
Spacing between supports of flat wired skylights There shall be kept as the jobsite at all times a _______ wherein
actual progress of construction including tests are conducted, weather
625mm
conditions and other pertinent data are to be recorded
Spacing between supports of corrugated wired skylights
Logbook
1500mm
The building official shall within _________ from payment of the
What to provide For window type ACU required fees by the applicant issue the building permit applied for
Railing height of balconies The owner of the building who is issued or granted a building permit
under sec 308 shall engage the services of a __________ to
750mm minimum undertake the fulltime inspection and supervision of construction work
(But!!! Safe standard is 900mm- 1m in height Architect or civil engineer
Thin strips of wood or mesh that gives more strength and insulation
reinforcement with drywall installation
Lathe/ lathing
225 or less
Elevators shall be installed in all private and public buildings for public
use accessible to disabled persons pursuant to the objectives of
________