One-Line Diagram - OLV1 (Load Flow Analysis)

FROM PANEL GL 20
100 MVAsc

Cable1
1-3/C 70
LOCATION : GL 19
0 A
MV SWITCHGEAR GL 19 LBS2 630 A
Bus1
6.6 kV 6600 VAC, 3 Ph, 50 Hz, 3P

0 A LBS1 630A 0 A LBS1 630A3

GENSET 700 KVA


595 kW
Cable (3c x 70) TRAFO GL 19
0 MVA

TRANSFORMER GL19
700 kVA
Cable (7x1c x 300)
Cable (7x1c x 300)x

LOCATION : GS 4 / GS NIBUNG

PANEL ATS
MCCB-72 MCCB 1
Bus2 1600 A 1600 A
0.4 kV
400 VAC, 3 Ph, 50 Hz, 3P + N

MCCB-7
MCCB-44 MCCB-2 50 A
1600 A 100 A

Cable12

7 x 1C x 300 mm 1-4/C 10 1-4/C 10


Cable3

LP1 10 KW 10 kVA
10 kVA BATTERY CHARGER

LOCATION : PANEL LV GS4

PANEL LV gs 4
MCCB-62
2000 A
0.4 kV

MCCB-77 MCCB-56 MCCB-58


MCCB-52 MCCB-74 MCCB-75 MCCB-55 MCCB-68
16 A 50 A 50 A
400 A 400 A 400 A 100 A
16 A

Cable52 Cable38
Cable34 Cable49 Cable50 Cable43
Cable37
1-4/C 10 1-4/C 10
1-3/C 70 1-3/C 70 1-3/C 70 1-4/C 10
1-4/C 10
Cable45

1-4/C 10
jockey pump
crude tf pump2 11 kW
75 HP 75 HP 75 HP
crude tf pump INS AIR KOMPRESOR 11KW
crude tf pump3
1.1 kW 11 kVA
1.1 kW oil spill pit
oil catcher pump LP2 10 KW
10 kVA

page 1 23:19:52 Jul 14, 2022 Project File: GS NIBUNG 4