Us,
VERTICAL ok ali DATE:
SPACE FIL/HOTEL & RESORT dune 9,2022
INTERIORS ILOGATION: REF. #
sree Ld ‘KAVAIT POWNT, CEBU SOUTH ROAD PROPERTY, CEBU CTTY VSHEHR-PC-2022-0710
PIECE CONTRACT
1 SCOPE OF WORKS: Lovol 20 Executive Suit - Bay 2021
2 JOB ORDERS VS12021-2775-A
a SUBCONTRACTOR 6 TRUCKING (RACHEL)
rem oN DESCRIPTION ary [| uwirprice | amount
7 Tot___| Gating framing and board up works
ating framing at Living, Foye nd tathrom 00
Celing boardup @Bukhead
Catig cove instalatn (Foyer. el ng and bekoam)
Fiat Celing at Living room
Celing boardup at ing Boroem, Foyer ard batvoam
2 Tot___| Walliraming and boardup at Living aeafbedroom/ 100
toletioyer
‘STOS0 raring
‘STCS5 framing
TCD Boartup
STCeDSBoardup
Wal rang ard board up at a a mulion :
Wal amin and board up at TV wal
Wal rain and boar up at Tole a
nslalaton of AC il wth rain ard bomp
3 ist Painting works (apo second coat ony) 100)
aining works at at celng (rg and bedroom)
: airing works atbulibead
Painting works at cling cove (ning and broom)
raining works at foyer rea
Paling works ato area
a Tet FRaciowoolnsaaton 100)
[TOTAL ANOUNT al :
EE Richard D. Bojra
YSI- VP of Operations
vP snlmig UR eerie(eve = b780z AVE!| riers 17802 AVE)
suneet avn/ 50
0 NOVAS \ 10”wef Peete
ILWASTS <9) | ARTE
awe { @)
TONOLWASmee ree / 10
Nid ONTHSO Gala aH
_ NV Id ONITIRG SAL a ag | 10