Professional Documents
Culture Documents
Cmi 104 - 1668141282
Cmi 104 - 1668141282
(Company/Designation/Name/Sign/Date) (Company/Designation/Name/Sign/Date)
Note : You are directed to execute this site instruction at the appointed time which interpret contract documents or change
orders without changes in contract amount and time. Proceeding with the work in accordance with this Site Instruction
indicates acceptance without time and cost implications.
Should you consider that a change in contract amount or time is required, notify the the construction manager within 24 hours
from your receipt of this instruction prior to proceeding with this work. Submit a change order proposal within five (5) working
days from your notification.
Distributions: CONTRACTOR DOCUMENT CONTROLLER OTHERS Rev. 001 - July 2020
CD - 03
50 ±900 50 REVIEWED
The document has been reviewed by the relevant Consultant(s) and is accorded the
following status referred to in Project Procedure for action by the Trade Contractor.
A B C
Consultant review of this document does not relieve the Trade Contractor
of its responsibilities under the Trade Contractor.
NOTES:
50
REFLECTED_CEILING_PLAN
REV DATE DESCRIPTION DWN
CLIENT:
ADDITIONAL
200
SHOWER LINEAR
HAND HOLE 220
10 10 UHRI
OWNER
NUSTAR - CEBU INTEGRATED RESORT Kawit Point, SRP, Cebu City
2 2
200
MEPF CONSULTANT:
W.P.
ELV CONSULTANT:
W.P.
KITCHEN AND LAUNDRY CONSULTANT:
2
200 AUTHOR:
SD
2
TM
W.P.
PTR NO. DATE ISSUED TIN
PRC NO. VALIDITY PLACE
IAPOA NO. VALIDITY
PROJECT NAME:
PROJECT STAGE : -
DISCIPLINE : XXX
KEY PLAN
W.P.
DO NOT SCALE DRAWINGS, VERIFY ALL DIMENSIONS ON SITE
SHEET CONTENTS:
ADDITIONAL LINEAR HAND HOLE
REFLECTED CEILING PLAN
01 REFLECTED CEILING PLAN DRAWN BY DATE 26-JUNE-21 SHEET NO