NUSTAR - CEBU INTEGRATED RESORT

Kawit Point, SRP, Cebu City


Control No.
UHRI_CIR_CMI_0009_VSI_00104

Form No. Date Issued:


SITE INSTRUCTION October 14.2022
RLC-CCM-GF-014
TO : VERTICAL SPACE INTERIORS, INCORPORATION
ATTENTION : Ms. CARMELITA MORALEDA - PROJECT MANAGER
SUBJECT : PROVIDE ADDITIONAL GLASS DOOR FOR BAY 5 & 15 (LEVEL 9-11)
Contract Package: CP- 10E
Date Needed: ASAP
Description:
This is to formally instruct your office to proceed on additional Linear manhole on toilet area
at Level 9-11 and 20-23 Hotel Tower 2. (See attached plan)
--------------------------- Nothing Follows -----------------------------

Prepared By : Recommended By:

Ar. Archie Jalen Ambulo Engr. Ismael Dario


RLC-UHRI/CONSTRUCTION ARCHITECT RLC-UHRI/CONSTRUCTION MANAGER

Approved By : Received By:

Ar. Paulo Llaguno


RLC-UHRI/CCM/OIC
(Company/Designation/Name/Sign/Date)
Actions Taken:

Prepared By : Approved By:

(Company/Designation/Name/Sign/Date) (Company/Designation/Name/Sign/Date)
Note : You are directed to execute this site instruction at the appointed time which interpret contract documents or change
orders without changes in contract amount and time. Proceeding with the work in accordance with this Site Instruction
indicates acceptance without time and cost implications.
Should you consider that a change in contract amount or time is required, notify the the construction manager within 24 hours
from your receipt of this instruction prior to proceeding with this work. Submit a change order proposal within five (5) working
days from your notification.
Distributions: CONTRACTOR DOCUMENT CONTROLLER OTHERS Rev. 001 - July 2020

RLC - Corporate Construction Management August 2019


PROJECT LOGO:

CD - 03
50 ±900 50 REVIEWED
The document has been reviewed by the relevant Consultant(s) and is accorded the
following status referred to in Project Procedure for action by the Trade Contractor.

A B C
Consultant review of this document does not relieve the Trade Contractor
of its responsibilities under the Trade Contractor.

NOTES:
50

REFLECTED_CEILING_PLAN
REV DATE DESCRIPTION DWN
CLIENT:

ADDITIONAL
200

SHOWER LINEAR
HAND HOLE 220
10 10 UHRI
OWNER
NUSTAR - CEBU INTEGRATED RESORT Kawit Point, SRP, Cebu City

PROJECT MANAGEMENT CONSULTANT:

2 2
200

QUANTITY SURVEYOR / COST CONSULTANT:


PT - 01

ADDITIONAL LINEAR HAND HOLE


ARCHITECTURE:
02 BLOW-UP DETAIL
BLOW-UP PLAN 01 SCALE: 1:30 MTS
ARCHITECT OF RECORD:

CIVIL & STRUCTURAL CONSULTANT:

MEPF CONSULTANT:

W.P.
ELV CONSULTANT:

ARCHITECTURAL LIGHTING CONSULTANT:


SD

W.P.
KITCHEN AND LAUNDRY CONSULTANT:
2

200 AUTHOR:
SD

2
TM

INTERIOR DESIGN : TURN-KEY JOBS : CUSTOM MADE FURNITURES


VERTICAL SPACE INTERIORS, INC.
268 FACTORY B. BARANGAY NIOG 3 BACOOR CITY, CAVITE, PHILIPPINES
TEL: 0946 431 4494 FAX: 0946 417 0267

W.P.
PTR NO. DATE ISSUED TIN
PRC NO. VALIDITY PLACE
IAPOA NO. VALIDITY
PROJECT NAME:

FILI HOTEL & RESORT


NUSTAR - CEBU INTEGRATED RESORT
Kawit Point, SRP, Cebu City

PROJECT STAGE : -
DISCIPLINE : XXX
KEY PLAN

W.P.
DO NOT SCALE DRAWINGS, VERIFY ALL DIMENSIONS ON SITE
SHEET CONTENTS:
ADDITIONAL LINEAR HAND HOLE
REFLECTED CEILING PLAN
01 REFLECTED CEILING PLAN DRAWN BY DATE 26-JUNE-21 SHEET NO

01 SCALE: 1:30 MTS CHECKED BY DATE 26-JUNE-21


APPROVED BY DJJ
-FPP
DATE 26-JUNE-21
FIT-00032D
REVISION SCALE 1:30 @ A3
JOB NUMBER VSI_2021_2775A
CCM
DRAWING NO. VSI_CIR_SD_CD_HT2_FIT_00032