PROJECT TURN OVER FORM

Project Name: Location: PIECE CONTRACT NO.:


FILI HOTEL AND RESORT KAWIT POINT SRP, CEBU CITY REF. # : VSI-FHR-PC-2021-0141

Work Description:
Bay 5 Bay 6-10
Painting Painting
Zocalo 150mm x 300mm sqm Ceiling Painting 168.65
sqm Ceiling Painting 71.29 lm Bulkhead Painting 19.65
lm Bulkhead Painting 3.93 lm Covelight painting 86.45
lm Covelight painting 17.29 at Wall
Ceiling Framing lm Corner Plastering 63.3
sqm at Bedroom & Foyer 25 lm Pipe Chase Header Concreting 10.7
sqm at Bathroom 15 Bay 11-15
Curtain Cove/bulkhead Ceiling Framing at Wall
lm at Bedroom 200/300mm H 3.93 sqm STC - 50 Boardup 37.43
Cove Light Ceiling Framing sqm STC - 55 Boardup 50.75
lm at Bedroom 225mm H 14 sqm Standard Drywall Boardup 26.46
lm at Foyer 140mm H 1.49 sqm Rockwool Installation 188.25
lm at Bathroom 140mm 1.8 Painting
Ceiling Boardup sqm Ceiling Painting 206.09
sqm at Bedroom & Foyer 25 lm Bulkhead Painting 19.65
sqm at Bathroom 15 lm Covelight painting 86.45
Curtain Cove/bulkhead Ceiling Boardup Prelims
lm at Bedroom 200/300mm H 3.93
at Bedroom Underslab Ceiling
sqm Framing 31.29
sqm Boardup 31.29

COMULATIVE PERCENTAGE ACCOMPLISHMENT: 90%

THIS IS TO CERTIFY THAT THE SCOPE OF WORK STIPULATED ABOVE HAVE BEEN DELIVERED AND ACCPTED IN ACCORDANCE WITH THE STANDARDS AND REQUIREMENTS SET FORTH BY
VERTICAL SPACE INTERIORS INC.

CHECKED BY:

Ms. Trisha Jane Aldea


VSI- QUANTITY SURVEYOR

REMARKS

SUB-CONTRACTOR CONFIRMATION EVALUATED BY:

Ar. Mary Anthonette A. Olmoguez Ms. Carmelita Carla Moraleda