Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

Well Test Match in 3D Simulator and Green Field

Development

Wazed Ali
History

- Matched well test in SAPHIR for green field wet-gas carbonate reservoir
- Completed well test match in 3D ECLIPSE simulator
- Matched flowing bottom whole pressure, water cut, and gas rate.
- Optimized development scenarios
- Maintain plateau production rate 90 mmscfd as long as possible by optimized well location, spacing and
completion.
Tested Wells #3,5,6 and 7 in Simulation Model
Saturation, Sw Matching between Eclipse and Petrel Models
Well #MH5: BHP Match

Build Up start
Well #MH5: Gas Rate Match
Well #MH5: Water Production Rate Match

Issue with
water
measurement
time
Well #MH7(Horizontal): BHP Match
Well #MH7: THP Match
Well #MH7: Water Production Rate Match
SCHEMATIC OF WELL #MH-5
Well #MH-5: IPR/VLP Matching Comparison
SCHEMATIC OF WELL #MH-7
Well #MH-7: TVD vs Distance
VFP Curve for Well #MH-7
Well #MH-7: IPR/VLP Matching Comparison
Field Production: Vertical vs Horizontal Well Development
Scenarios Comparison
Vertical vs Horizontal Well Recovery Comparison

You might also like