DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

Attachment

II

SCHEDULE OF RATES
PETRONAS

TENDER NO:

RFP-000000000173

TENDER TITLE:

PROVISION OF CORROSION UNDER


INSULATION FOR PETRONAS GROUP OF
COMPANIES

Open
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

TABLE OF CONTENT

1. MOBILIZATION & DEMOBILIZATION - ONSHORE ...................................................................................................... 3

2. MOBILIZATION & DEMOBILIZATION - OFFSHORE ..................................................................................................... 7

3. PHONON ACTIVITIES - SITE DATA GATHERING ........................................................................................................ 10

4. PHONON ACTIVITIES - DATA ANALYSIS & REPORT .................................................................................................. 11

5. MANPOWER / EQUIPMENT .................................................................................................................................... 12

5.1. OFFSHORE ................................................................................................................................................................ 12


5.2. ONSHORE ................................................................................................................................................................. 12

6. SCAFFOLDING SUPPORT ......................................................................................................................................... 13

7. INSULATION SUPPORT ........................................................................................................................................... 14

8. PAINTING SUPPORT ............................................................................................................................................... 15

9. RISERS/SUBSEA PIPELINE ....................................................................................................................................... 16

10. ONSHORE PIPELINE (ABOVEGROUND/ UNDERGROUND) ................................................................................... 17

Open
2
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

1. MOBILIZATION & DEMOBILIZATION - ONSHORE

Work Unit of Unit Rate


No Description
Location Measurement (RM)

1 Site Visit (2 pax + equipment) per location Northen Team 1,000.00

2 Mobilization & Demobilization for Phonon Work Northen Return Trip 6,000.00

3 Mobilization & Demobilization - Project Engineer Northen Return Trip 2,100.00

4 Mobilization & Demobilization - Field Engineer Northen Return Trip 2,100.00

5 Mobilization & Demobilization - Work Leader Northen Return Trip 1,800.00

6 Mobilization & Demobilization - Painting Supervisor Northen Return Trip 1,800.00

7 Mobilization & Demobilization - Safety Site Supervisor Northen Return Trip 2,100.00

8 Mobilization & Demobilization - Scaffolder Level 3 Northen Return Trip 1,800.00

9 Mobilization & Demobilization - Scaffolder Level 2 Northen Return Trip 1,500.00

10 Mobilization & Demobilization - Scaffolder Level 1 Northen Return Trip 1,500.00

11 Mobilization & Demobilization - Rigger Foreman Northen Return Trip 1,800.00

12 Mobilization & Demobilization - Rigger/Scaffolder Northen Return Trip 1,500.00

13 Mobilization & Demobilization - Blaster Northen Return Trip 1,500.00


14 Mobilization & Demobilization - Painter Northen Return Trip 1,500.00

15 Mobilization & Demobilization - Helper / Rigger Northen Return Trip 1,500.00

16 Mobilization & Demobilization - Firewatcher Northen Return Trip 1,500.00

Mobilization & Demobilization - Diesel Generator


17 Northen Return Trip 2,000.00
2.5kVA
18 Site Visit (2 pax + equipment) per location Eastern Return Trip 1,000.00

19 Mobilization & Demobilization for Phonon Work Eastern Return Trip 6,000.00

20 Mobilization & Demobilization - Project Engineer Eastern Return Trip 2,100.00

21 Mobilization & Demobilization - Field Engineer Eastern Return Trip 2,100.00

22 Mobilization & Demobilization - Work Leader Eastern Return Trip 1,800.00

23 Mobilization & Demobilization - Painting Supervisor Eastern Return Trip 1,800.00

24 Mobilization & Demobilization - Safety Site Supervisor Eastern Return Trip 2,100.00

Open
3
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

25 Mobilization & Demobilization - Scaffolder Level 3 Eastern Return Trip 1,800.00

26 Mobilization & Demobilization - Scaffolder Level 2 Eastern Return Trip 1,500.00

27 Mobilization & Demobilization - Scaffolder Level 1 Eastern Return Trip 1,500.00

28 Mobilization & Demobilization - Rigger Foreman Eastern Return Trip 1,800.00

29 Mobilization & Demobilization - Rigger/Scaffolder Eastern Return Trip 1,500.00

30 Mobilization & Demobilization - Blaster Eastern Return Trip 1,500.00

31 Mobilization & Demobilization - Painter Eastern Return Trip 1,500.00

32 Mobilization & Demobilization - Helper / Rigger Eastern Return Trip 1,500.00

33 Mobilization & Demobilization - Firewatcher Eastern Return Trip 1,500.00

Mobilization & Demobilization - Diesel Generator


34 Eastern Return Trip 2,000.00
2.5kVA
35 Site Visit (2 pax + equipment) per location Southern Return Trip 1,000.00

36 Mobilization & Demobilization for Phonon Work Southern Return Trip 6,000.00

37 Mobilization & Demobilization - Project Engineer Southern Return Trip 2,100.00

38 Mobilization & Demobilization - Field Engineer Southern Return Trip 2,100.00

39 Mobilization & Demobilization - Work Leader Southern Return Trip 1,800.00

40 Mobilization & Demobilization - Painting Supervisor Southern Return Trip 1,800.00

41 Mobilization & Demobilization - Safety Site Supervisor Southern Return Trip 2,100.00

42 Mobilization & Demobilization - Scaffolder Level 3 Southern Return Trip 1,800.00

43 Mobilization & Demobilization - Scaffolder Level 2 Southern Return Trip 1,500.00

44 Mobilization & Demobilization - Scaffolder Level 1 Southern Return Trip 1,500.00

45 Mobilization & Demobilization - Rigger Foreman Southern Return Trip 1,800.00

46 Mobilization & Demobilization - Rigger/Scaffolder Southern Return Trip 1,500.00

47 Mobilization & Demobilization - Blaster Southern Return Trip 1,500.00

48 Mobilization & Demobilization - Painter Southern Return Trip 1,500.00

49 Mobilization & Demobilization - Helper / Rigger Southern Return Trip 1,500.00

50 Mobilization & Demobilization - Firewatcher Southern Return Trip 1,500.00

Open
4
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

Mobilization & Demobilization - Diesel Generator


51 Southern Return Trip 2,000.00
2.5kVA
52 Site Visit (2 pax + equipment) per location Labuan Return Trip 2,200.00

53 Mobilization & Demobilization for Phonon Work Labuan Return Trip 7,600.00

54 Mobilization & Demobilization - Project Engineer Labuan Return Trip 3,500.00

55 Mobilization & Demobilization - Field Engineer Labuan Return Trip 3,500.00

56 Mobilization & Demobilization - Work Leader Labuan Return Trip 1,800.00

57 Mobilization & Demobilization - Painting Supervisor Labuan Return Trip 2,000.00

58 Mobilization & Demobilization - Safety Site Supervisor Labuan Return Trip 3,500.00

59 Mobilization & Demobilization - Scaffolder Level 3 Labuan Return Trip 2,500.00

60 Mobilization & Demobilization - Scaffolder Level 2 Labuan Return Trip 2,000.00

61 Mobilization & Demobilization - Scaffolder Level 1 Labuan Return Trip 2,000.00

62 Mobilization & Demobilization - Rigger Foreman Labuan Return Trip 2,500.00

63 Mobilization & Demobilization - Rigger/Scaffolder Labuan Return Trip 2,000.00

64 Mobilization & Demobilization - Blaster Labuan Return Trip 2,000.00

65 Mobilization & Demobilization - Painter Labuan Return Trip 2,000.00

66 Mobilization & Demobilization - Helper / Rigger Labuan Return Trip 2,000.00

67 Mobilization & Demobilization - Firewatcher Labuan Return Trip 2,000.00

Mobilization & Demobilization - Diesel Generator


68 Labuan Return Trip 2,800.00
2.5kVA
69 Site Visit (2 pax + equipment) per location Sarawak Return Trip 2,200.00

70 Mobilization & Demobilization for Phonon Work Sarawak Return Trip 7,600.00

71 Mobilization & Demobilization - Project Engineer Sarawak Return Trip 3,500.00

72 Mobilization & Demobilization - Field Engineer Sarawak Return Trip 3,500.00

73 Mobilization & Demobilization - Work Leader Sarawak Return Trip 1,800.00

74 Mobilization & Demobilization - Painting Supervisor Sarawak Return Trip 1,800.00

75 Mobilization & Demobilization - Safety Site Supervisor Sarawak Return Trip 2,100.00

76 Mobilization & Demobilization - Scaffolder Level 3 Sarawak Return Trip 1,800.00

Open
5
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

77 Mobilization & Demobilization - Scaffolder Level 2 Sarawak Return Trip 1,500.00

78 Mobilization & Demobilization - Scaffolder Level 1 Sarawak Return Trip 1,500.00

79 Mobilization & Demobilization - Rigger Foreman Sarawak Return Trip 1,800.00

80 Mobilization & Demobilization - Rigger/Scaffolder Sarawak Return Trip 1,500.00

81 Mobilization & Demobilization - Blaster Sarawak Return Trip 1,500.00

82 Mobilization & Demobilization - Painter Sarawak Return Trip 1,500.00

83 Mobilization & Demobilization - Helper / Rigger Sarawak Return Trip 1,500.00

84 Mobilization & Demobilization - Firewatcher Sarawak Return Trip 1,500.00

Mobilization & Demobilization - Diesel Generator


85 Sarawak Return Trip 2,500.00
2.5kVA

86 Site Visit (2 pax + equipment) per location Sabah Return Trip 2,300.00

87 Mobilization & Demobilization for Phonon Work Sabah Return Trip 7,600.00

88 Mobilization & Demobilization - Project Engineer Sabah Return Trip 3,500.00

89 Mobilization & Demobilization - Field Engineer Sabah Return Trip 3,500.00

90 Mobilization & Demobilization - Work Leader Sabah Return Trip 1,800.00

91 Mobilization & Demobilization - Painting Supervisor Sabah Return Trip 2,000.00

92 Mobilization & Demobilization - Safety Site Supervisor Sabah Return Trip 3,500.00

93 Mobilization & Demobilization - Scaffolder Level 3 Sabah Return Trip 2,500.00

94 Mobilization & Demobilization - Scaffolder Level 2 Sabah Return Trip 2,000.00

95 Mobilization & Demobilization - Scaffolder Level 1 Sabah Return Trip 2,000.00

96 Mobilization & Demobilization - Rigger Foreman Sabah Return Trip 2,500.00

97 Mobilization & Demobilization - Rigger/Scaffolder Sabah Return Trip 2,000.00

98 Mobilization & Demobilization - Blaster Sabah Return Trip 2,000.00

99 Mobilization & Demobilization - Painter Sabah Return Trip 2,000.00

100 Mobilization & Demobilization - Helper / Rigger Sabah Return Trip 2,000.00

101 Mobilization & Demobilization - Firewatcher Sabah Return Trip 2,000.00

Mobilization & Demobilization - Diesel Generator


102 Sabah Return Trip 2,500.00
2.5kVA

Open
6
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

2. MOBILIZATION & DEMOBILIZATION - OFFSHORE

Unit Rate
No Description Work Location Unit of Measurement
(RM)
1 Site Visit (2 pax + equipment) per location Eastern Return Trip 1,500.00
Mobilization & Demobilization for Phonon
2 Eastern Return Trip 7,000.00
Work
Mobilization & Demobilization - Project
3 Eastern Return Trip 2,100.00
Engineer
Mobilization & Demobilization - Field
4 Eastern Return Trip 2,100.00
Engineer
5 Mobilization & Demobilization - Work Leader Eastern Return Trip 2,100.00
Mobilization & Demobilization - Painting
6 Eastern Return Trip 2,100.00
Supervisor
Mobilization & Demobilization - Safety Site
7 Eastern Return Trip 2,100.00
Supervisor
Mobilization & Demobilization - Scaffolder
8 Eastern Return Trip 2,100.00
Level 3
Mobilization & Demobilization - Scaffolder
9 Eastern Return Trip 2,100.00
Level 2
Mobilization & Demobilization - Scaffolder
10 Eastern Return Trip 2,100.00
Level 1
Mobilization & Demobilization - Rigger
11 Eastern Return Trip 2,100.00
Foreman
Mobilization & Demobilization -
12 Eastern Return Trip 2,100.00
Rigger/Scaffolder
13 Mobilization & Demobilization - Blaster Eastern Return Trip 2,100.00

14 Mobilization & Demobilization - Painter Eastern Return Trip 2,100.00


Mobilization & Demobilization - Helper /
15 Eastern Return Trip 2,100.00
Rigger
16 Mobilization & Demobilization - Firewatcher Eastern Return Trip 2,100.00
Mobilization & Demobilization - Diesel
17 Eastern Return Trip 2,300.00
Generator 2.5kVA
18 Stanby Rate for team and equipment Eastern Per team/day 20,000.00

19 Site Visit (2 pax + equipment) per location Labuan Return Trip 2,000.00
Mobilization & Demobilization for Phonon
20 Labuan Return Trip 10,000.00
Work
Mobilization & Demobilization - Project
21 Labuan Return Trip 3,500.00
Engineer
Mobilization & Demobilization - Field
22 Labuan Return Trip 3,500.00
Engineer
23 Mobilization & Demobilization - Work Leader Labuan Return Trip 3,500.00
Mobilization & Demobilization - Painting
24 Labuan Return Trip 2,500.00
Supervisor
Mobilization & Demobilization - Safety Site
25 Labuan Return Trip 3,500.00
Supervisor
Mobilization & Demobilization - Scaffolder
26 Labuan Return Trip 2,500.00
Level 3

Open
7
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

Mobilization & Demobilization - Scaffolder


27 Labuan Return Trip 2,300.00
Level 2
Mobilization & Demobilization - Scaffolder
28 Labuan Return Trip 2,300.00
Level 1
Mobilization & Demobilization - Rigger
29 Labuan Return Trip 2,500.00
Foreman
Mobilization & Demobilization -
30 Labuan Return Trip 2,300.00
Rigger/Scaffolder
31 Mobilization & Demobilization - Blaster Labuan Return Trip 2,300.00

32 Mobilization & Demobilization - Painter Labuan Return Trip 2,300.00


Mobilization & Demobilization - Helper /
33 Labuan Return Trip 2,300.00
Rigger
34 Mobilization & Demobilization - Firewatcher Labuan Return Trip 2,300.00
Mobilization & Demobilization - Diesel
35 Labuan Return Trip 3,000.00
Generator 2.5kVA
36 Standby Rate for team and equipment Labuan Per team/day 20,000.00
37 Site Visit (2 pax + equipment) per location Sarawak Return Trip 2,000.00
Mobilization & Demobilization for Phonon
38 Sarawak Return Trip 10,000.00
Work
Mobilization & Demobilization - Project
39 Sarawak Return Trip 3,000.00
Engineer
Mobilization & Demobilization - Field
40 Sarawak Return Trip 3,000.00
Engineer
41 Mobilization & Demobilization - Work Leader Sarawak Return Trip 3,000.00
Mobilization & Demobilization - Painting
42 Sarawak Return Trip 2,300.00
Supervisor
Mobilization & Demobilization - Safety Site
43 Sarawak Return Trip 2,500.00
Supervisor
Mobilization & Demobilization - Scaffolder
44 Sarawak Return Trip 2,500.00
Level 3
Mobilization & Demobilization - Scaffolder
45 Sarawak Return Trip 2,000.00
Level 2
Mobilization & Demobilization - Scaffolder
46 Sarawak Return Trip 2,000.00
Level 1
Mobilization & Demobilization - Rigger
47 Sarawak Return Trip 2,500.00
Foreman
Mobilization & Demobilization -
48 Sarawak Return Trip 2,000.00
Rigger/Scaffolder
49 Mobilization & Demobilization - Blaster Sarawak Return Trip 2,000.00

50 Mobilization & Demobilization - Painter Sarawak Return Trip 2,000.00

Mobilization & Demobilization - Helper /


51 Sarawak Return Trip 2,000.00
Rigger

52 Mobilization & Demobilization - Firewatcher Sarawak Return Trip 2,000.00

Mobilization & Demobilization - Diesel


53 Sarawak Return Trip 2,800.00
Generator 2.5kVA
54 Stanby Rate for team and equipment Sarawak Per team/day 20,000.00
55 Site Visit (2 pax + equipment) per location Sabah Return Trip 2,100.00

Open
8
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

Mobilization & Demobilization for Phonon


56 Sabah Return Trip 10,000.00
Work
Mobilization & Demobilization - Project
57 Sabah Return Trip 3,500.00
Engineer
Mobilization & Demobilization - Field
58 Sabah Return Trip 3,500.00
Engineer
59 Mobilization & Demobilization - Work Leader Sabah Return Trip 3,500.00
Mobilization & Demobilization - Painting
60 Sabah Return Trip 2,500.00
Supervisor
Mobilization & Demobilization - Safety Site
61 Sabah Return Trip 3,500.00
Supervisor
Mobilization & Demobilization - Scaffolder
62 Sabah Return Trip 2,500.00
Level 3
Mobilization & Demobilization - Scaffolder
63 Sabah Return Trip 2,300.00
Level 2
Mobilization & Demobilization - Scaffolder
64 Sabah Return Trip 2,300.00
Level 1
Mobilization & Demobilization - Rigger
65 Sabah Return Trip 2,500.00
Foreman
Mobilization & Demobilization -
66 Sabah Return Trip 2,300.00
Rigger/Scaffolder
67 Mobilization & Demobilization - Blaster Sabah Return Trip 2,300.00

68 Mobilization & Demobilization - Painter Sabah Return Trip 2,300.00


Mobilization & Demobilization - Helper /
69 Sabah Return Trip 2,300.00
Rigger
70 Mobilization & Demobilization - Firewatcher Sabah Return Trip 2,300.00
Mobilization & Demobilization - Diesel
71 Sabah Return Trip 2,800.00
Generator 2.5kVA
72 Standby Rate for team and equipment Sabah Per team/day 20,000.00

Open
9
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

3. PHONON ACTIVITIES - SITE DATA GATHERING

No Phonon Activities Unit of Measurement Length Unit Rate (RM)


1 Site Data Gathering per run 0 < X <10 m 14,325.00
2 Site Data Gathering per run 10<= X <=16 m 17,190.00
3 Site Data Gathering per run > 16 m 21,010.00

Open
10
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

4. PHONON ACTIVITIES - DATA ANALYSIS & REPORT

No Phonon Activities Unit of Measurement Length Unit Rate (RM)

1 Data Analysis & Report per run 0 < X <11m 15,700.00


2 Data Analysis & Report per meter 11 <= X <16m 1,470.00
3 Data Analysis & Report per meter 16 <= X <21m 1,393.00
4 Data Analysis & Report per meter 21 <= X <31m 1,335.00
5 Data Analysis & Report per meter 31 <= X <41m 1,295.00
6 Data Analysis & Report per meter 41 <= X <51m 1,265.00
7 Data Analysis & Report per meter 51 <= X <71m 1,240.00
8 Data Analysis & Report per meter 71 <= X <=100m 1,225.00
9 Data Analysis & Report per meter >100m 1,215.00

Open
11
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

5. MANPOWER / EQUIPMENT

5.1. Offshore

No Description Unit of Measurement Unit Rate (RM)

1 Project Engineer Daily Rate 900.00


2 Field Engineer Daily Rate 800.00
3 Work Leader Daily Rate 650.00
4 Painting Supervisor Daily Rate 750.00
5 Safety Site Supervisor Daily Rate 500.00
6 Scaffolder Level 3 Daily Rate 700.00
7 Scaffolder Level 2 Daily Rate 300.00
8 Scaffolder Level 1 Daily Rate 280.00
9 Rigger Foreman Daily Rate 600.00
10 Rigger/Scaffolder Daily Rate 300.00
11 Blaster Daily Rate 300.00
12 Painter Daily Rate 300.00
13 Helper / Rigger Daily Rate 260.00
14 Firewatcher Daily Rate 260.00
15 Diesel Generator 2.5kVA Daily Rate 350.00

5.2. Onshore

No Description Unit of Measurement Unit Rate (RM)

1 Project Engineer Daily Rate 650.00


2 Field Engineer Daily Rate 600.00
3 Work Leader Daily Rate 525.00
4 Painting Supervisor Daily Rate 500.00
5 Safety Site Supervisor Daily Rate 380.00
6 Scaffolder Level 3 Daily Rate 500.00
7 Scaffolder Level 2 Daily Rate 260.00
8 Scaffolder Level 1 Daily Rate 230.00
9 Rigger Foreman Daily Rate 420.00
10 Rigger/Scaffolder Daily Rate 260.00
11 Blaster Daily Rate 220.00
12 Painter Daily Rate 220.00
13 Helper / Rigger Daily Rate 220.00
14 Firewatcher Daily Rate 220.00
15 Diesel Generator 2.5kVA Daily Rate 300.00

Open
12
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

6. SCAFFOLDING SUPPORT

Unit of Unit Rate


No Description Volume Remark
Measurement (RM)
Below 40 meter elevation or Monthly flat rate
1 < 216 M3 M3 25.00
Hanging Scaffold - first month
Below 40 meter elevation or Monthly flat rate
2 > 216 M3 M3 25.00
Hanging Scaffold - first month
Below 40 meter elevation or subsequent
3 M3 23.00
Hanging Scaffold month
Above 40 meter elevation or Monthly flat rate
4 < 216 M3 M3 28.00
Hanging Scaffold - first month
Above 40 meter elevation or Monthly flat rate
5 > 216 M3 M3 28.00
Hanging Scaffold - first month
Above 40 meter elevation or subsequent
6 M3 24.00
Hanging Scaffold month

Open
13
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

7. INSULATION SUPPORT

No Description Pipe Size_Inch Unit of Measurement Unit Rate (RM)


1 Hot Insulation (Rockwool) 2" meter 819.00
2 Hot Insulation (Rockwool) 3" meter 819.00
3 Hot Insulation (Rockwool) 4" meter 846.00
4 Hot Insulation (Rockwool) 6" meter 846.00
5 Hot Insulation (Rockwool) 8" meter 887.00
6 Hot Insulation (Rockwool) 10" meter 887.00
7 Hot Insulation (Rockwool) 12" meter 955.00
8 Hot Insulation (Rockwool) >14" meter 955.00
9 Cold Insulation (Foam Glass) 2" meter 675.00
10 Cold Insulation (Foam Glass) 3" meter 675.00
11 Cold Insulation (Foam Glass) 4" meter 1,376.00
12 Cold Insulation (Foam Glass) 6" meter 1,376.00
13 Cold Insulation (Foam Glass) 8" meter 2,004.00
14 Cold Insulation (Foam Glass) 10" meter 2,004.00
15 Cold Insulation (Foam Glass) 12" meter 2,550.00
16 Cold Insulation (Foam Glass) >14" meter 2,563.00

Open
14
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

8. PAINTING SUPPORT

No Description Pipe Size_Inch Unit of Measurement Unit Rate (RM)

1 Painting without blasting 2" meter 120.00


2 Painting without blasting 3" meter 120.00
3 Painting without blasting 4" meter 144.00
4 Painting without blasting 6" meter 144.00
5 Painting without blasting 8" meter 162.00
6 Painting without blasting 10" meter 162.00
7 Painting without blasting 12" meter 188.00
8 Painting without blasting >14" meter 204.00
9 Painting with blasting 2" meter 700.00
10 Painting with blasting 3" meter 750.00
11 Painting with blasting 4" meter 790.00
12 Painting with blasting 6" meter 820.00
13 Painting with blasting 8" meter 850.00
14 Painting with blasting 10" meter 900.00
15 Painting with blasting 12" meter 950.00
16 Painting with blasting >14" meter 1,050.00

Open
15
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

9. RISERS/SUBSEA PIPELINE

Pipeline size z Unit Rate for first 100m Unit Rate for next 100m
No
(inch) (RM) (RM)
1 6 285,000.00 255,000
2 8 285,000.00 255,000
3 10 285,000.00 255,000
4 12 285,000.00 255,000
5 14 285,000.00 255,000
6 16 327,500.00 310,000
7 18 327,500.00 310,000
8 20 327,500.00 310,000
9 22 327,500.00 310,000
10 24 327,500.00 310,000
11 26 327,500.00 310,000
12 28 327,500.00 310,000
13 30 370,000.00 342,500
14 32 370,000.00 342,500
15 34 370,000.00 342,500
16 36 370,000.00 342,500
17 38 370,000.00 342,500

Note: PDT is done using planar mode and maximum of 200 Meter length
Assumption: Subsea Pipeline is not less than 1 Kilometer length to perform linear mode

Open
16
DocuSign Envelope ID: 1F039D32-0185-4937-9C0A-BFFEBDB20E9C

10. ONSHORE PIPELINE (ABOVEGROUND/ UNDERGROUND)

Pipeline size Unit Rate for first 1 km Unit Rate for next per km
No
(inch) (RM) (RM)
1 6 88,000 85,000
2 8 88,000 85,000
3 10 88,000 85,000
4 12 88,000 85,000
5 14 88,000 85,000
6 16 88,000 85,000
7 18 90,000 86,000
8 20 90,000 86,000
9 22 90,000 86,000
10 24 92,000 87,000
11 26 92,000 87,000
12 28 94,000 88,000
13 30 94,000 88,000
14 32 94,000 88,000
15 34 94,000 88,000
16 36 94,000 88,000
17 38 94,000 88,000
18 40 94,000 88,000
19 42 94,000 88,000
20 44 94,000 88,000
21 46 94,000 88,000

Note: PDT is done using linear mode and maximum of 1 Kilometer length
Underground pipeline more than 1 kilometer to be excavated for transducer installation

Open
17