Professional Documents
Culture Documents
Mag 14 2017 August 1
Mag 14 2017 August 1
Mag 14 2017 August 1
oedigital.com
▼
EPIC SUBSEA DRILLING
Marginal Fields 28 Flow Assurance 32 New concepts 44
Offshore Engineer • August 2017
FPSO Outlook
w
ie
v
& Technologies
Re
on
i
at
om
48
ge
ut
page 20
pa
A
e
or
sh
ff
O
Real change
starts here
TechnipFMC is a new and dynamic force in energy.
Discover more.
TechnipFMC.com
AUGUST 2017
FEATURE FOCUS
FPSO OUTLOOK
& TECHNOLOGIES
20 Testing the waters
In advance of OE’s 2017 Global FPSO
Forum, held in Houston this month,
Audrey Leon chats with the forum’s
board members to learn what is
in store for the FPSO sector and
discover how digitalization may play
a role.
24 Weathering the storm
Infield Systems’ Catarina Podevyn
surveys the FPSO market and
discusses recent projects awards.
26 Making MODUs into FPUs
Mobile offshore drilling units could
be a FPU conversion alternative.
Karen Boman sets out the details.
Features
QUARTERLY AUTOMATION REVIEW
48 Internet of oil things
The Internet of Things is becoming ever more embedded in the
oil psyche. Steve Hamlen reports.
EPIC 50 Virtual metering
28 Marginal options for small pools NEL’s Damian Krakowiak examines the potential of virtual
The UK North Sea’s marginal fields offer an attractive prize, flow metering technology and how better testing could enable
if they can be economically unlocked. Steve Hamlen reports. its adoption.
30 North Sea honey bee 52 Improving maintenance
Elaine Maslin surveys solutions to tap an estimated 3.4 Karen Boman speaks with Prasantha Jayakody of Bsquare
billion of resources locked up in UK marginal pools. about the benefits of condition-based maintenance and the
challenges of implementation in the oil and gas industry.
SUBSEA
32 Nightmares on wax REGIONAL OVERVIEW: GULF OF MEXICO
Waxy crude on the Pil and Bue project and topside 54 Turn the page
constraints has led VNG Norge to explore pipe-in-pipe After years of turbulence fueled by scandal and debt woes,
heating systems. Elaine Maslin reports. Brazil and its oil company Petrobras detailed how they intend
34 Let’s get connected to get back on the right track. Melissa Sustaita reports.
Sometimes seen as the weak link in the system, subsea 56 Pioneering under pressure
connectors have come a long way, says Hydro Group Petrobras’ insatiable deepwater production plays a significant
Systems’ Bill Mildon. role when it comes to driving global subsea systems demand.
Elaine Maslin speaks with the fi rm’s Subsea Systems
PRODUCTION Executive Manager Cristina Pinho.
36 Design once, build many
Rob Gill and Steve Henzell explain how WorleyParsons 58 Pre-salt prevails
intends to make wellhead facilities production cheaper and Brazil is slowly emerging from one of its worst economic
faster with a design one, build many ethos. crises with the country’s oil and gas sector no exception, says
the EIC’s Pietro Ferreira.
38 Room for improvement
While UK North Sea production efficiency has made improve-
ments since diving to a dire 60% in 2012, more can still be done,
says Gordon Lawrence from Asset Performance Networks.
5
y since 197
Gas Industr
bal Oil &
for the Glo
reading
Required
ON THE COVER
▼
With its remote and harsh operations, mining has similar DRILLING 44
The journey awaits. In mid-July,
Augus t
epts
rance
EPIC Flow Assu
utlook
2017
v
Re
ati
48
m
ge
to
& Techn
pa
Au
ore
page 20
sh
Off
Offshore
Vol. 42 •
No.8
No matter where you go around the world, the oil and gas
industry relies on API Standards to meet the highest level
of safety. Show the world your commitment to safety.
Start with API standards by starting at API.org/Standards.
877.562.5187 (Toll-free U.S. & Canada) | +1.202.682.8041 (Local & International) | sales@api.org | www.api.org
© 2017 – API, all rights reserved. API, the API logo, the “Onshore-Offshore-Every Shore” tagline, the “It All Starts with API” tagline, and the “It’s times like these” tagline are
trademarks or registered trademarks of API in the United States and/or other countries.
Volume 42, Number 8 August 2017
10 Global Briefs
News from the around the world, including discoveries,
62 Activity
Company updates from around the industry. ®
64 Editorial Index
International
oedigital.com
The power of
partnership.
Engineering Ingenuity
OEdigital.com
Solutions
Solutionsfor
forthe
theOil
Oil&&Gas
GasIndustry
Industry
What’s Trending
The journey
EDITORIAL
Editor/Associate Publisher
Audrey Leon
begins
aleon@atcomedia.com
European Editor
Elaine Maslin
emaslin@atcomedia.com
A
kboman@atcomedia.com
s OE went to press two huge piec- In our FPSO Outlook, OE asks floating
es of news floated by our desks. In production experts, from OE’s Annual Asia Pacific Editor
Audrey Raj
June, Shell’s giant Prelude FLNG facility Global FPSO Forum, how digitalization araj@atcomedia.com
(pictured above) set sail from Geoje could help the FPSO segment, which is
Web Editor
shipyard in South Korea and began trying to bring about new cost savings to
Melissa Sustaita
its 5800km trek to Western Australia, make the use of these massive systems msustaita@atcomedia.com
where fi rst production is set for 2018. more viable.
Contributor
The vessel, built by the Technip- One of our respondents, on page 21,
Steve Hamlen
Samsung consortium, will be stationed said digital technology could automate
475km north-northeast of Broome, and high-cost, dangerous, or error-prone ART AND PRODUCTION
will have a capacity of at least 5.3 MTPA tasks. Automation can significantly Bonnie James
of liquids: 3.6 MTPA of LNG, 1.3 MTPA improve [companies’] bottom lines, and Verzell James
of condensate and 0.4 MTPA of liquefied improve production efficiency. Another CONFERENCES & EVENTS
petroleum gas. The Prelude FLNG facil- respondent said that digital technolo- Conference Director
ity is 488m-long and 74m-wide, making gies will allow access to more real-time Jennifer Granda
jgranda@atcomedia.com
it the largest offshore floating facility data, enabling better decision-making.
ever built, Shell says. In our Quarterly Automation Review, PRINT
Japan’s Inpex also announced in July starting on page 48, writer Steve Hamlen Quad Graphics, West Allis, Wisconsin, USA
that its Ichthys LNG’s FPSO facility, dives deeper into the benefits of the
Ichthys Venturer, sailed away from its Internet of Things (IoT). “In an IoT world, SUBSCRIPTIONS
To subscribe or update details, email:
Okpo, South Korea, yard beginning its many companies will discover that subservices@atcomedia.com or visit oedigital.com.
5600km journey to the Browse Basin, being just a manufacturing company or Rates $99/year for non-qualifi ed requests.
220km offshore Western Australia. an internet company will no longer be $10 for individual copy.
The vessel, which will be moored in sufficient,” says Dave Mackinnon, head NOTICE: Print magazine delivery for free qualified
250m water depth, measures 336m-long of Technology Innovation at Total E&P subscriptions restricted to North America & Western
ship-shaped FPSO has a storage capacity UK. “They will need to become both – or Europe. All other regions will be receive digital
of 1.12 MMbbl of condensate. Inpex said become subsumed in an ecosystem in format – email address is required
that following its mooring, the FPSO will which they play a smaller role.” CIRCULATION
undergo hook-up and commissioning, So, what does all this mean? The Inquiries about back issues or delivery problems
along with the Ichthys Explorer central Industry 4.0 is upon us, and the oil should be directed to subservices@atcomedia.com
processing facility 3.5km away. The field and gas industry has an opportunity to
REPRINTS
is expected onstream by Q3 2017. adopt new technologies that could make Print and electronic reprints are available for an
The Ichthys Venturer is featured on the massive data glut work better for upcoming conference or for use as a marketing tool.
this month’s cover. decision-making. Mackinnon describes Reprinted on quality stock with advertisements
a future where the supply chain will be removed, our minimum order is a quantity of 100.
For more information, call Jill Kaletha at
Reaping Digitalization’s benefits digitized and will allow for the tracking Foster Printing: +1-219-878-6068 or
In OE’s June issue, we set out to showcase and tracing the lifecycle of many things, email: JillK@fosterprinting.com
the new world of digitalization tech- including a subsea Xmas tree.
nologies that are ready to infiltrate the There is a whole open world of pos- DIGITAL
www.oedigital.com
industry and influence positive change. sibilities due to digital technologies, and Facebook: fb.me/ReadOEmag
This month’s issue looks at how various you can read more about them in this is-
Twitter: twitter.com/OEdigital
industry segments are applying them. sue’s Quarterly Automation Review.
Linked in: www.linkedin.com/groups/4412993
K Total to drill
off Bulgaria
Total will drill one well
F
offshore Bulgaria, beginning
O next month (September) with
the Noble Globetrotter II
G drillship. In Bulgaria, Total
has an interest in the Khan
Asparuh license in the Black
Sea, about 120km from the
coast in -2000m water depth.
The French supermajor made
a deepwater oil discovery in
October 2016 in the license.
interest (operator), alongside 2015. Shell’s share of Corrib Valhall West Flank, Snadd L Shah Deniz II
Pancontinental Namibia, represented 27,000 boe/d in and Storklakken. inches closer
with 30% interest, and 2016. Aker BP will develop its BP has installed the top-
Paragon Oil and Gas, with Valhall Flank West project sides for the Shah Deniz
5% interest. I Aker BP out of the Tor formation Stage 2 quarters and utilities
targets PDO trio at the western flank of the platform in the Caspian Sea,
H Shell exits Corrib Aker BP is preparing to Valhall field in the southern in early July, as the project
Shell will exit upstream submit plans for develop- area of the Norwegian North inches closer to fi rst gas in
operations in Ireland, selling ment and operation (PDO) for Sea. The concept is a nor- 2018.
its Corrib gas field stake to a three of its operated projects: mally unmanned installation BP says that the platform’s
Canadian pension fund for
up to US$1.23 billion. Under J Gina Krog online with 58.7% interest. Its partners are Total E&P
the agreement, Shell affili- Statoil started production on the US$3.8 billion Norge (15%), KUFPEC Norway (15%), PGNiG
ate Shell Overseas Holdings Gina Krog development in the North Sea on Upstream Norway (8%) and Aker BP (3.3%).
will sell its shares in Shell 30 June. The Gina Krog platform is tied into
E&P Ireland, which holds Sleipner A and uses both processing capacity on
45% interest in the Corrib gas the platform and existing pipelines for sending
venture, to CPP Investment the gas to the market in Europe. Oil from the
Board Europe SARL. The field is transported by a floating storage and
sale is part of Shell’s strategy offloading unit. The recoverable reserves for
to reshape itself through a Gina Krog are 16.8 MMscm of oil, 11.8 Bcm of
three-year, US$30 billion gas and 3.2 million tonne of NGL. Gina Krog is
divestment program. Corrib 30km northwest of Sleipner and 230km offshore
started production in late Stavanger, Norway. Statoil operates Gina Krog
fi rst residents – the platform gas for the Iranian market N Total, QP take O ConocoPhillips
manager and the initial hook- from 2021, under the 20-year Al-Shaheen reins submits Barossa plan
up and commissioning (HUC) deal, which is also the fi rst France’s Total and Qatar ConocoPhillips has
team – were transferred to Iranian Petroleum Contract Petroleum (QP) have taken submitted its development
the platform to begin HUC (IPC) signed in Iran. over operatorship from proposal for the gas and
operations. The fi rst development Maersk Oil of the giant Al- condensate Barossa field in
BP operates Shah Deniz phase will consist of 30 Shaheen oil field offshore the Timor Sea, to Australian
on behalf of the Shah Deniz wells and two wellhead plat- Qatar for a term of 25 years. authorities. The Barossa Area
joint venture with 28.8% forms connected to existing Al-Shaheen is 80km north Development is expected
interest. Its partners in- onshore treatment facilities of Ras Laffan in the Persian to be a floating production,
clude: TPAO (19%), Petronas by two subsea pipelines. Gulf, and produces 300,000 storage and offloading
(15.5%), AzSD (10 %), Lukoil At a later stage, once b/d. The field began produc- vessel based project in the
(10%), NICO (10%) and SGC required by reservoir condi- tion in 1994. The fi rst phase Bonaparte Basin, in 130-
Upstream (6.7%). tions, a second phase will of Al-Shaheen’s development 350m water depth, about
be launched involving the plan consists of drilling 56 300km north of Darwin. The
M Total, CNPC to construction of offshore new wells, which is set to expected LNG and condensate
develop South Pars compression facilities, a fi rst begin this summer with the production rates are about
Iran signed a new contract on the South Pars field and mobilization of the fi rst two 3.7 MTPA and 1.5 MMbo a
to develop its South Pars gas potentially the largest in the rigs. A third rig will be added year, respectively. The life of
field with France’s Total and Gulf region. at the beginning 2018. the project is expected to be
China National Petroleum Total says the project will This fi rst phase will be about 20 years from first gas,
Corp. have a production capacity followed by two others over which is targeted for 2023. A
Total is expected to invest of 2 Bcf/d or 400,000 boe/d, the next five years to further final investment decision is
up to US$5 billion to produce including condensate. develop the field, Total says. targeted for 2019.
Contracts
vessels Normand Vision and repair and maintenance (IRM)
Normand Reach. Project man- and pipeline inspection ser-
agement and engineering will vices in Brazil.
be based at Ocean Installer’s The new award follows
Wood Group wins assist in turret integration and headquarters in Stavanger and Fugro’s successful completion
White Rose gig offshore commissioning activi- start with immediate effect. of an initial 12-month contract
Wood Group will complete ties in Mozambique. for the oil major, after taking
detailed engineering for Husky OneSubsea wins delivery of the newbuild ves-
Energy’s White Rose topsides Ocean Installer wins EPCIC Otter deal sel Fugro Aquarius.
for the concrete gravity-based Statoil work TAQA has awarded OneSubsea Built specifically for the
wellhead platform, which will Statoil has awarded Ocean an EPCIC contract for a subsea Brazilian market by Wilson
tieback to the SeaRose floating Installer a contract for sub- multiphase boosting system for Sons shipyard in São Paulo,
production vessel offshore sea installations and tie-in the Otter field in the UK North with local content of more than
eastern Canada. The project operations on Johan Sverdrup, Sea. OneSubsea and its subsea 60%, Fugro Aquarius is an 83m,
includes procurement services Utgard, and Bauge. integration alliance partner, DP-2 ROV support vessel. With
and engineering design work. The award is part of Statoil’s Subsea 7, will supply and install a deck area of 520sq m, the
First oil is scheduled for 2022. Marine Wave 2 program and a subsea multiphase boost- vessel is permanently equipped
means that Ocean Installer ing system including topside with two Fugro-built 150HP
SOFEC to supply will continue playing a key role and subsea controls, as well as 3000m work class ROVs.
Coral South in the Johan Sverdrup subsea associated life-of-field services. Operations began in May 2017.
A TechnipFMC and JCG joint works, initiated under the The project will result in a 30km
venture has awarded SOFEC a Marine Wave 1 umbrella. The subsea tieback to the TAQA- Wood Group inks
supply contract for the turret complete work scope encom- operated North Cormorant plat- Culzean job
mooring system meant for passes umbilical installation form. This will be the longest Wood Group has won a new
Eni’s Coral South Floating LNG at Johan Sverdrup, Bauge subsea multiphase boosting contract from Maersk Oil
facility. and Utgard, as well as spools, tieback in the UK North Sea. to deliver mechanical and
Under the contract, SOFEC cover, tie-in and manifold management services for the
will conduct engineering, installation at Utgard. Fugro to provide IRM hook-up and commissioning
procurement and construction Offshore operations will services for Petrobras of the Culzean gas condensate
work related to the internal take place in 2019 and Ocean Fugro has won a two-year con- field in the UK central North
turret mooring system and Installer will utilize a combina- tract from Petrobras to provide Sea. The three-year contract is
its ancillary components, and tion of the construction support comprehensive inspection, effective immediately.
Thank
you!
We look forward to another successful year
Colin Johnston Ronnie Northcutt Brian Skeels David Carr J.J. Duenas Rob Hill Daniel Vela
Ryan Schmidt John Felarca Matt Lewis David Brown Hakan Eser Alex Lawler Paul Barbre
deepwaterintervention.com
Hosted By: Sponsored By: Organized By: Produced By:
shore Engineer
FIELD OF VIEW
The
nutcracker
Marginal fields don’t always and that they’re hard to image with seis-
mic. It’s also difficult to drill, in terms
turn out to be that marginal,
of fi nding reservoir, but not difficult to
especially when you have produce from, as “it’s pretty much the
efficient topsides and an ability best reservoir quality you can get, with
34% porosity. It’s not really rock. It’s
to find hidden pockets in your
sand. If you take a core, it falls apart,”
reservoir. Elaine Maslin reports. she says.
It’s a cracker
“Venture branded [Chestnut] a stranded Hummingbird Spirit.
Photos from Centrica.
asset. It’s the smallest standalone devel-
opment in the UK North Sea, and almost online with a pre-drilled water injec- MacLean was working for Bluewater
defi nitely in the (wider) North Sea,” tor, then two production wells, via the at the time and says that many were be-
says Nigel MacLean, Central North Sea Sevan-design Hummingbird Spirit FPSO mused by the new cylindrical concept.
manager, Centrica. “We never realized in 2008. The field was developed on the MacLean, however, liked it and man-
Chestnut would be as large as it is.” assumption that it contained 7 MMbbl aged to get a job on Chestnut.
“Chestnut is unlike any of our other recoverable. There had been a concern The 200,000 bbl capacity Sevan300
fields. It’s an injectite reservoir, not pri- about the connectivity of the reser- Hummingbird Spirit was Sevan’s second
mary deposition. It was found by acci- voir, but this was proved unfounded, cylindrical unit and the fi rst one in
dent, as they usually are, when a deeper and with very good water sweep, via the North Sea. Sevan’s fi rst cylindrical
Forties reservoir was being targeted,” an injection well, maintaining initial FPSO was the Sevan Piranema, now
says Gemma Campbell, Centrica’s pressure. Piranema Spirit and operated by Teekay
development and production manager The Sevan floater fitted Chestnut Petrojarl, launched in 2007, offshore
for the Central and northern North Sea. because it was a new technology – a Brazil, in 1000m water depth. Both were
“Injectite sands come from a sand body cylindrical FPSO vessel – which meant built at Yantai Raffles/Keppel Verlome.
deeper down in the sequence, for ex- then-operator Venture was able to get Sevan’s third unit was the Sevan300
ample a turbidite sandstone. The shale preferential rates (which have since Sevan Voyageur, used by Premier Oil on
compresses, forcing the sand up through been updated to reflect market condi- the Shelley field, from 2009-2010, then
the over burden. Re-depositing the sand tions), MacLean says. The idea for on the Huntington field, since 2013, for
in a shallower part of the sequence,” Hummingbird Spirit was for it to go EON, where it still resides. A Sevan1000
Campbell explains. around and work on small pools with was then used to develop the Eni-
It is difficult to assess the size of such this small production unit, much like its operated Goliat field and a Sevan400,
reservoirs, due to their uncertain nature namesake bird. built at Cosco, will be used for the
Juan Carlos
Zepeda, president
commissioner, CNH,
speaks at the Pemex
Farm-out day event.
Photos from Pemex Flickr.
The fruits of
Mexico’s labor
Mexico’s energy reform efforts have been realized with recent successes from prior bid rounds. Now,
Mexican national Pemex has added a steady schedule of farm-outs in shallow and deep water.
Audrey Leon surveys the plays on the agenda.
2016, Pemex fi nally found its fi rst joint venture partner (BHP Round 2.1
Billiton) for the Trion field, in the deepwater Gulf of Mexico, Ayín–Batsil
to add more detail on the plays added to the farm-out agenda. Reserves in the
Planned/
The Ayin-Batsil area, he says, offers 359 MMboe of undevel- Golden Triangle possible
49,065 (46,890)
fields are in 80-120m water depth. That’s why we left it there United States
to be done.” Shallow 4 27 71
Production
The total area of the complex is 1096sq km in water depths
systems worldwide
Deep 20 780 1277 (operational and 2017 onwards)
ranging 150-170m, deeper than the shallow water fields in Ultradeep 17 2089 1780 (last
Floaters
which Pemex normally operates, he said. month)
González Anaya added that there is infrastructure nearby West Africa Operational 298 (308)
– the Litoral-A central processing platform, which is 24km Shallow 110 3524 16314 Construction/
45 (44)
Conversion
from Ayin-Batsil and 50km from shore – to plug into produc- Deep 24 2075 3430
Planned/possible 295 (287)
tion and take production onshore. “You still have to build a Ultradeep 12 1611 2398
638 (639)
50km pipeline from where we are to the existing infrastruc- Total 232 22,176 39,821
(last month) (236) (22,240) (39,611)
ture Pemex has. But the infrastructure is there. That’s why we Fixed platforms
waited,” he said. Greenfield reserves Operational 9,105 (9041)
Ayin was discovered in 1991. Initial production rates from 2017-21 Construction/
72 (90)
Ayin-Batsil, Hernandez said, were between 1200 b/d and .32 Water Field Liquid Gas Conversion
depth numbers reserves reserves Planned/possible 1,372 (1304)
MMcf/d (Batsil) and 8200 b/d and .33 MMcf/d (Ayin). There (mmbbl) (bcf)
10,549 (10,435)
Shallow 877 33,163 320,829
Nobilis-Maximino (last month) (887) 33,381) (329,080)
Subsea wells
Deep 119 5208 76,071
20 km from (last month) (121) (5208) (78,071) Operational 4,879 (5148)
Great White
220 km Ultradeep 76 16,155 47,097 Develop 374 (342)
from shore (last month) (76) (16,155) (47,097)
Planned/possible 6,425 (6330)
1 Total 1072 54,526 443,997 11,678 (11,820)
Tamaulipas
Global offshore reserves (mmboe) onstream by water depth
40 km
from
Trion 2015 2016 2017 2018 2019 2020 2021
Shallow 21,290.9 32,117.92 21,897.92 20,138.7 12,010.12 16,128.42 19,525.56
(last month) (21,275.90) (32,136.74) (24,737.17) (17,328.56) (12,834.19) (15,683.92) (20,790.44)
Exploration
Blocks Total 24,252.06 39,433.73 24,762.01 27,150.68 18,240.17 29,981.07 32,643.55
in three years what no other country has in terms of reform,” well, offshore Mexico. Wood Mackenzie called it one of the 20
he said. “Today, we have 54 companies working in Mexico’s largest shallow water fi nds in the past 20 years, and the fi rst
E&P sector.” for the private sector.
As a result of the fi rst five bidding cycles, Flores-Quiroga Zama-1 was drilled in 166m water depth, about 37mi (60km)
said that Mexico expects US$57 billion in investment. They off Tabasco, in the Block 7 in the Sureste Basin, using the
have already signed 49 new contracts and have participation Ensco 8503 semisubmersible.
from 17 countries. The well reached an initial shallow target vertical depth
Flores-Quiroga also mentioned that the new five-year plan of approximately 11,100ft (3383m). Talos said it hit a 1100ft
will offer 509 exploration and production blocks, and 82 (335m) oil bearing interval, with 558-656ft (170-200m) of net
production fields. “The aim is to present these at auctions oil pay in Upper Miocene sandstones with no water contact.
by 2019,” he said. “We will announce six months before the The fi rm said initial gross original oil in place estimates for
round. We aim to make the process more standardized.” the Zama-1 well range from 1.4-2 billion bbl. Oil samples
Of the 509 blocks, Flores-Quiroga said 119 are deepwater indicate light oil, with API gravities between 28-30° and some
blocks with prospective resources of 6594 MMboe and an av- associated gas.
erage block size of 1000sq km. The blocks are in three basins, On the same day as Talos’ announcement, Italy’s Eni said
the Salina del Istmo, Cordilleras Mexicanas, and Perdido. The its Amoca field, inside Area 1 in the Sureste Basin, has 1 bil-
next deepwater rounds will be scheduled for January 2018 lion boe of resources in place. Eni said that the Amoca-3 well
(Round 2.4) and October 2018 (Round 3.2), he said. proved the presence of multiple significant oil levels in the
There are also plenty of shallow water blocks up for grabs. Orca and Cinco Presidentes Formations. Amoca is 1200km
Flores-Quiroga said that there are 112 blocks with prospective west of Ciudad Del Carmen, in the Bay of Campeche in 25m
resources of 3555 MMboe with an average block size of 400sq water depth. The Amoca-3 well was drilled to 4330m total
km. The shallow water blocks are in three basins – Burgos depth and encountered 410m of net oil pay (25-27° API), in
(near the US/Mexico maritime border), Tampico-Misantla (off- several high-quality Pliocene reservoir sandstones, of which
shore Veracruz), and Sureste (offshore Tabasco and Campeche, 300m were found in the deeper sequence of Cinco Presidentes,
and home to Eni’s Amoca and Talos' Zama discoveries). in various cluster levels of Pliocenic age with good reservoir
characteristics.
Historic finds The total resource base estimate for Area 1 is 1.3 billion bbl
No doubt Mexico’s energy reform efforts will not only be of oil in place, according to Eni. The Italian explorer plans to
measured in monetary success but in production volumes as submit an accelerated and phased development plan in 2017
well. Two days after Pemex’s farm-out day in Houston, Talos targeting an early production phase with a plateau ranging
Energy announced it made an estimated 1.4-2 billion bbl, from 30-50,000 b/d, with the start of operations planned for
“world-class” light oil discovery at the Zama-1 exploration early 2019.
Testing
the waters
In advance of OE ’s 2017 Global OE: What does the future hold for the floating
production/FPSO industry because of the downturn?
FPSO Forum, held in Houston
Chris Barton, senior vice president,
this month, Audrey Leon business development – Offshore,
Wood Group Mustang: The challenge
chats with the forum’s board now is to make deepwater FPSO (floating
members to learn what is in production, storage and offloading)
projects economic. Leaner, less complex
store for the FPSO sector and designs are the talk of the day. There are a
lot of assets out there and operators want
discover how digitalization to fi nd solutions. As such, operators are considering reutiliz-
ing designs and repurposing facilities.
may play a role. Operators are more willing to look at tiebacks as opposed
to standalone developments. Wood Group has developed
its “Catalog of Designs” as a means to an end. BP’s Mad
Dog 2 is a dramatic example of how costs have changed.
Estimated at US$20 billion before the price fall, the project
was given the green light at $9 billion in late 2016, thanks
to a significant redesign and negotiating lower prices with
suppliers.
the 5-7-year life cycle through operations, and across projects. Nevertheless, this
of these projects. should be supported by well-defined lessons learned, standard-
For brownfield ization, and integrity management goals rather than simply data
programs, companies accumulation in order to provide real efficiency gains.
develop overlays (for
example, upgrades Van Dijk: Database driven design is one development that
of wireless and is getting more and more traction. We are moving from 3D
mobile) that pull the design to 6D or even 7D – if you talk to some operators. I still
required data flow have some doubts about the cost benefits, because man-hours
out of the platform on projects keep on going up despite all this technology.
to support analytics Another interesting application is wireless commissioning
The Turritella FPSO. units. This approach and use of RFID technology. I’m convinced that defi nitely
Photo from Shell.
helps to avoid being pays off.
locked in by technology choices from the past.
OE: Life Extension of existing floating systems is also
Petruska: The process is starting downhole and will work another big topic for the industry due to the downturn.
its way back to the host. Initially, it will be to allow access What are some of the technologies that you have an eye
to more real-time data to make decisions quicker, but it will on that could be used in this space?
then lead to more data mining to fi nd other values to augment
operations. For the host, one outcome could be fewer work- Barton: Technology advancements and business changes
ers needed offshore all the way to de-manning for normal are leading operators to look at extending the service life of
operations. Barriers will be not fully understanding the value their offshore floating facilities. To go beyond the originally
statement of the technology and cost. approved design life, the operator requires the approval the
regulating bodies.
Biasotto: While the digitalization benefits are indisputable, To obtain this approval, the operator needs to demonstrate
the offshore, and oil and gas industries face some of the key that the facility can be maintained fit-for-service for the new
challenges as the industry in general, e.g. lack of standards and life span. Developing a life extension plan requires careful re-
regulation for digitalization, digital security and skills. While evaluation of the design and new extrapolations of expected
in the long-term it will require changes in the way we develop future damage mechanisms, including fatigue and corrosion.
and operate floating production/FPSO facilities, in the short- The challenge is to provide assurance that an old design
term such changes will need to demonstrate cost savings are that has been in an operating environment for a prolonged
effective, otherwise it will fall behind opex reduction needs. period will meet future needs and can satisfy demanding new
regulations and design criteria.
Van Dijk: One of the main opportunities that I see is digitaliza- Life extension challenges are to ensure that safety con-
tion enabling remote operations and, therefore, reduced man- ditions remain satisfactory and that your extended use is
ning. This will result in cost savings on both the opex and capex approved by the statutory authorities. This requires a rigor-
side and will also improve safety by having less people offshore. ous assessment of the integrity of the asset combined with a
I don’t think the industry is ready for a major shift yet, but it is detailed analysis of potential hazards that could occur when
just a matter of time before we will see broader applications. production volumes are maintained. Advanced analysis meth-
ods and smart methodologies are being developed to enhance
OE: What are some new advances that may change and streamline the analysis process.
FPSO design, construction, and/or operations?
Petruska: Better inspection and surveying equipment.
Barton: More eWorking will certainly start transforming Although this is not a technology, but these are rooted in the
the industry. Wood Group is developing eXpert and eWork- engineering, i.e. what are acceptable design limits for a life
pack and an example of how this technology contributes to extension vs. a new design.
conservation.
Biasotto: Risk based inspection (RBI), Condition based main-
Petruska: I would like to see risk-based stability used, in or- tenance (CBM), inspection techniques, digital asset platforms
der to improve understanding and to see if that could change for management of inspection and maintenance data.
the design. I suspect we will see more large gas handling
FPSOs. Not an advancement, per se, but we will need to un- Van Dijk: Life extensions are naturally messy and it is
derstand their design and process safety aspects vs. what we important to know the physical status that a facility is in.
been doing with oil-dominated FPSO field developments. Proper asset integrity management will give us a better idea
of the scope of life extension projects. Laser scanning of
Biasotto: Digitalization should support a true lifecycle man- existing facilities will also play an important role in life
agement for floating production/FPSO facilities from design extensions.
OFFSHORE WIND
MARINE ENERGY
Register now
Offshore Energy attracts a global audience of more than 12,000 offshore energy industry professionals.
The three-day event, features an exhibition where over 650 companies will showcase their products
and services. The accompanying conference addresses current and future issues in the offshore
industry, covering developments in oil & gas, offshore wind and marine energy. See you in Amsterdam!
Weathering
the storm Infield Systems’ Catarina Podevyn surveys the FPSO
market and discusses recent projects awards.
T he leased float-
ing production,
storage and
offloading (FPSO) sector
is integral to the floating
production system (FPS)
developments, most notably Petrobras’s Libra pilot project.
As Petrobras is the leading deepwater operator, Brazil’s NOC
has also increasingly utilized leased FPSOs, with both SBM
Offshore and MODEC historically the contractors of choice.
Other key operators expected to employ leased production
platforms over the 2017-2021 timeframe include Italy’s Eni,
market. With cost reduc- UK-based independent EnQuest and Ophir Energy.
tion high on the agenda The four main FPSOs contractors (SBM, MODEC, BW
of upstream operators, the Offshore, and Bumi Armada) control more than 60% of
option of a leased facility the operational leased fleet. MODEC and SBM dominate
The John Evans Atta Mills MV25 is becoming increasingly the supply of high-end FPSO units and have provided the
FPSO, operating at Tullow’s TEN attractive for key majors majority of leased FPSOs employed by Petrobras. While
project, offshore Ghana. and national oil companies they both have experience with engineering, fabricating
Photo from MODEC. (NOCs), which have tradi-
tionally favored owned and operated facilities.
Currently, Wood Mackenzie forecasts for up to 14 projects
involving leased platforms to see fi nal investment deci-
sion (FID) during 2017 and 2018, driven by Brazil’s pre-salt
developments, including Sepia, where MODEC is currently
the frontrunner for the lease award. A number of projects
in emerging and remote areas of production, such as SNE
(Sangomar Deep), offshore Senegal, and the Sea Lion develop-
ment, in the Falklands, are also expected to see FID during
the next 18 months, with leased production facilities the
favored development option.
In terms of installations, conversions are expected to
meet over 80% of leased platform demand over the 2017-
2021 timeframe. Tanker conversions are often selected for
leased FPSO facilities, and have been historically utilized on
small-to-medium sized offshore fields. Such facilities have
in the main been converted very large crude carrier (VLCC)
units, which have been primarily used by small and mid-cap
operators developing small-to-medium size offshore fields. We
are now seeing a greater use of converted facilities on larger
Making MODUs
into FPUs InterMoor tows the ATP Innovator FPU from the Gomez
field in the Gulf of Mexico. Photo from InterMoor’s Flickr.
Mobile offshore drilling units project development manager for floating production, and
Manuel Laranjinha, project manager floaters and drilling,
could be a FPU conversion Wood Group, in their OTC paper, Design Methodology for
Converting a MODU into a FPU. Converting MODUs into
alternative. Karen Boman FPUs has been less common over the past 15 years, but there
I
are examples, including the P-40 at the Marlim Sul field off
sets out the details. Brazil and the ATP Innovator at the Gomez field in the Gulf
of Mexico.
n a cash-constrained environment, finding alternative As operators look to reduce deepwater project costs, conver-
concepts could help make offshore developments float. sion of MODUs to FPUs might provide the oil and gas industry
One such alternative, discussed at this year’s Offshore an answer, the paper authors say. A decline in drilling activ-
Technology Conference (OTC) in Houston, would see mobile ity and the subsequent halt or delay of development plans
offshore drilling units (MODUs) converted into floating produc- means many MODUs are available that could be candidates
tion units (FPUs). for conversion into early production facilities, long-term well-
The conversion of tankers for floating production, storage testing facilities, minimum processing facilities and even full
and offloading (FPSOs) vessels has been a common practice, processing facilities in oil fields in benign areas, Moe and
accounting for almost two-thirds of operating units, due to Laranjinha say.
the relative economic attractiveness of a tanker hull versus For its base case, Wood Group used its own MODU design to
a newbuild FPSO hull, according to Anders Martin Moe, determine feasibility for converting a MODU to an FPU. The
Innovative.
Intelligent.
Informed.
Booth 2C111
With over 35 years’ experience in the oil eld we have developed materials and provided engineered solutions to
practically every deepwater project around the world.
Our technical, engineering, procurement and manufacturing teams are full of highly quali ed personnel, all brimming
with ideas. Supported by senior personnel with unrivalled experience we believe we provide an industry-leading service.
Bene t from the best product solutions with Balmoral engineered buoyancy, insulation and elastomer products.
A
the Scottish and UK governments. Our (more than 25-30km away, sometimes
s oil and gas provinces mature obligation is to match-fund this with in- less).
and the largest fields have dustry contribution envisaged as ‘benefit The use of existing infrastructure
already been developed, opera- in kind’ by allowing access and support would help to extend the life of the host
tors look to exploit the remaining smaller to oil and gas infrastructure, application facilities, which is within the remit of
reserves. This often involves the use of of expert knowledge and access to assets the UK’s MER (Maximizing Economic
new technology and more cost- that will assist us in achiev- Recovery) strategy.
effective solutions. This is cer- ing our goal.” Indeed, some of the undeveloped dis-
tainly the case for the UK North Around 70% of these mar- coveries are being assessed for suitabil-
Sea, as the region is looking to ginal fields hold less than 10 ity for ERD by the UK’s regulator, the Oil
“small pools” – marginal fields MMboe. In addition to their and Gas Authority (OGA),” Pearson says.
with less than 50 MMboe. small reserve volumes, other “Other fields will benefit from a re-
Chris Pearson, Small Pools challenges exist, such as, low duction in the entire lifecycle cost. This
Solution Centre Manager for the energy reservoirs, difficult does include how we design, build and
Oil & Gas Technology Centre fields, fluid commingling, install systems for a lower cost that we
Chris Pearson
(OGTC), is tasked with fi nding differential pressure and gas currently achieve. We are designing the
ways to develop them. disposal. next stage of those projects to fi nd a suit-
There are an estimated 600 marginal The best solutions on offer to opera- able field trial to demonstrate where the
fields around the world, according to tors come from adopting a “cluster and utilization of those technologies would
Pearson’s presentation this March, who collaborate” approach, Pearson notes, be appropriate.”
said this presents a great opportunity to adding that mapping of these small With regard to potential standalone
export technology and expertise from pools was completed in 2016 and cluster projects, Pearson adds: “There is a
the North Sea, because the majority of analysis has revealed promising areas of varied set of solutions, such as remotely
these fields are located offshore the UK. development. operated unmanned and light-manned
There are more than 350 undeveloped The Moray Firth has 43 discoveries in systems. There is no single approach
discoveries on the UK Continental Shelf 11 potential clusters, while the Central that can deal with the entire range of
(UKCS) and 160 are either in relin- North Sea (CNS) has 64 discoveries in 18 reservoirs properties currently undevel-
quished blocks or areas that have yet to potential clusters. oped, so we are supporting a number of
be re-licensed. “The majority of the marginal fields concepts to test feasibility, alignment
Together these represent 3.4 billion are in the CNS. However, in order to with our objectives of MER, plus the
boe of technically recoverable reserves achieve the objectives of the Wood economic value returned from support-
that offer the UK industry some US Report, the UK needs to develop and ing a reduction in life cycle costs for the
$228 billion (£175 billion) in potential utilize existing infrastructure across the developments.”
revenues. So, small pools could be big UKCS,” he says.
business and the supply chain could Licensing options
benefit from a push towards bringing Infrastructure access The OGA is putting a strong focus on
some of them onstream. Access to existing infrastructure offers mature areas and relinquished blocks
“It is therefore entirely logical that the marginal fields promising development in the upcoming 30th Licensing Round.
boost to the supply chain would almost options. The distance from these facili- The OGA will also release data packages
be instantaneous as industry sanctions ties will help dictate the best develop- on the aforementioned 160 unlicensed
their investment in the development of ment solution, Pearson says. discoveries, while also looking at mod-
these fields. It is with this in mind that The OGTC estimates that around 30 els “from cooperation to unitization” in
EPIC
on the cards, such as expiry and tim- grids, fi lling in for spare capacity. looked for more efficient designs and
ing commitments, “to induce syner- streamlined solutions.
gies for exploration and development Design and efficiency The fi rst saw an FPSO riser system
campaigns.” Industry body Oil & Gas UK is also cost $10.1 million (£7.75 million), a
Earlier this month, the OGA unveiled pushing operators to adopt leaner de- 25% cost saving; the second achieved
measures designed to make data openly signs using industry standardization for a saving of 18%, with a subsea pipeline
available and stimulate interest in the marginal developments. tieback costing US$16.9 million (£13
UKCS ahead of the 30th Round. Indeed, since the oil price crash million); a third saw a subsea mani-
“Data and technology are key to un- of mid-2014, many UK operators and fold and bundle costing $33.7 million
locking as many of these undeveloped contractors have realized that col- (£26 million), a 15% saving; while the
discoveries as possible,” says Gunther laboration is essential to driving down fourth, another subsea tieback cost
Newcombe, operations director, OGA. project costs, while development $18.8 million (£14.5 million), a 28%
“That’s why we’re making this data designs must be optimized to make saving.
openly available; to provide useful
insights into each discovery and the po-
tential these may hold. We want to see Small pools solution center – delivering information
swift deployment of technology to help
unlock many of these discoveries.”
honey bee
“It (Seillean) was a means of producing
oil from small offshore fields that would
be uneconomic to be developed through
conventional means, fi xed or floating,” he
says. It was a production system with a
riser system and storage capacity.
Finding a way to tap the North nearly an option for Chestnut. The 250m-long, 37m-beam fully DP
It was technically advanced for its unit, for 75-200m water depth, and
Sea’s estimated 3.4 billion of
time and arguably the fi rst floating off- 4.5m significant wave height, was built
resources currently locked up shore production system (FPSO), before at Harland & Wolff in Belfast. It had
FPSOs were invented. But, its commer- 51,000cu m storage tanks (320,000 bbl)
in marginal pools has become a
cial model didn’t stack up. The unit, and 15,000 b/d process equipment – later
perennial problem. Elaine Maslin named Seillean, Gaelic for “honey bee,” upgraded to 25,000 b/d. The unit had two
spent too much time transiting its oil moonpools, for the riser system and re-
looks at a past solution and
cargo to shore and not enough produc- mote operated vehicle (ROV – a low spec
ideas for today. ing to make it pay. work class Scorpio), and a derrick for
Seillean started work for BP in 1989, riser handling, and a tensioning system.
M
on the Donan and Cyrus fields. It was The riser system was a 5.5in outer
ore than 300 discovered fields then sold in 1993 to Reading & Bates, un- diameter bore drill pipe made up of 32ft
are sitting untapped across the der a move by BP to rent rather than own long pipe joints, with 5000psi operat-
basin, more than 150 of which assets. Next, the unit moved to Brazil to ing pressure. This was new and meant
are unlicensed. Many contain just 0-3 perform deepwater well tests (following the safety joint was needed – and was
MMboe (150), with 80 containing only some modification work) for Petrobras. indeed used. It was later upgraded when
4-6 MMboe. But, most of them are close After being acquired by Noble it went to Brazil, Meldrum says.
to existing infrastructure, says Gordon Drilling – and renamed Noble Seillean Pipe handling and tensioning facili-
Drummond, project manager, National – she was sold to Paragon Offshore, and ties were in one moonpool, with a sur-
Subsea Research Institutive (NSRI). renamed Paragon FPS01, and moved to face tree on a wireline BOP system, with
Some of it is about development cost. the US Gulf of Mexico. Paragon decided a swivel joint for 360 vessel rotation.
According to NSRI research into small to scrap her, along with three other This connected to a connection package,
pools, based on a US$60/bbl oil price, the units, early 2016. a flex joint, to allow 15-degree offset,
minimum viable field size that could and a safety joint.
be produced economically was 11.1 The riser connect package
MMboe. If the capex could be reduced didn’t need guidelines, and
by 25%, fields as small as 9.1 MMboe comprised a collet connector
could be produced, and even 5-8 for connection to the tree as-
MMboe, with 50% cost reduction. sembly (a flowline stab base,
However, small fields have been production tree, and re-entry
produced before. Indeed, Centrica’s hub installed using a drilling
Chestnut field was thought to rig on the wellhead), a conical
contain just 7 MMbbl when the O-ring interface, providing
Hummingbird Spirit FPSO start- flow paths for hydraulic
ed up in 2008, and the field is transfer between the riser
still producing today, now that and tree assembly, valves for
data suggests the field is larger isolation and flushing, and
than previously thought. shearing the wireline, and
Another earlier and a diver panel for recovery
more radical solution for of the riser connector
marginal fields was the package if the safety joint
single well oil production got separated. A re-entry
system (SWOPS), devel- hub would fit on top of
oped and deployed by the production tree via
BP in the 1980s and very the collet connector, and
incorporated a man-
drel onto which the
An original brochure,
from when SWOPS was riser connector package
first unveiled. OE Staff photo. locks.
EPIC
that untapped fields could be stranded,
umbilical. Direct hydraulic controls via in 100-400m water depth via catenary or
an umbilical (with 23 hydraulic lines tension tethers. if existing infrastructure, such as export
and two riser flushing cores) were used The buoy would contain controls, pipelines, is removed.
in conjunction with the riser package. power generation (including for up The situation could have applied to a
Acoustic monitoring was used to relay to six ESPs and water reinjection if new hub being developed by Independent
pressure information from the tree/flow- needed) and de-gassing equipment, with Oil & Gas (IOG), if not for a decision to
line back to the vessel. a typically 200,000 bbl subsea tank and recommission a 90km-long decommis-
In the early days, the plan was for the offloading system. Gravity and temper-
sioned southern North Sea (SNS) gas
vessel to go between 4-5 fields. But, some ature-based separation would be used,
pipeline – saving £100 million and two
of the wells didn’t live up to expecta- with the liquids heated and degassed.
tions, Meldrum says. BP, at the time, was Gas would be used for heating the tank years’ work, IOG CEO Mark Routh told an
in the process of moving from using its and process equipment space to reduce East of England Energy (EEEGR) event in
own rigs to using contractors instead. corrosion. But, this limits the system Norwich.
Meldrum says that compared with an to 9MMcf/d, Woods says. “There’s a gas IOG is acquiring the Thames Gas
FPSO that stays on station, the SWOPS oil ratio sweet spot. This would be for pipeline, which took gas into Bacton,
vessel had to leave once it was full to fields where you’re not sure what the
England, to transport some 500 Bcf
offload. “There was a lot of down time,” he production will be, they are stranded,
from its Blythe, Elgood, and Vulcan gas
says. Gas was dealt with through flaring. end of life production or a stand in for
hubs. IOG plans to drill 10 wells, lay over
an FPSO,” Woods says.
Other options While the buoy has been designed to 70km of new connector pipelines and
Other existing ideas for how to be reusable, the subsea storage system install up to five new platforms for these
produce these fields have included would be unlikely to be reused, says hubs. The Harvey asset, between Blythe
production buoys, “FPSO light” Woods. With the design assessed and and Vulcan, is likely to also be part of the
concepts, such as Amplus’ versatile review by design house ODE, OPB is project.
production unit (VPU) (OE: May 2016 now looking for field studies in the
“We saw a pipeline was empty and, if
– Small is beautiful), subsea produc- North Sea.
we recommissioned it, we would have
tion systems with subsea storage, such
as Kongsberg’s subsea storage system Commerciality a pipeline that could start to unlock
concept (OE: August 2016 – Tanked While some of the issues are around these stranded assets,” Routh said.
up), now owned by NOV. According to technology – including flaring, water Acquiring the pipeline from Perenco,
an NSRI study, out of these, produc- handling, sand management – ultimate- Centrica and Tullow cost £1, with IOG
tion buoys were deemed as having ly, one of the biggest blockers, as with taking on all future liabilities, which
the potential to be profitable after five Seillean, will be the commercial model. amount to several million pounds.
years. Subsea production was thought With the existing small pools, there’s
Environmental surveys started in
to have the potential to get “above the little incentive for those that hold them,
February, and in July, a field develop-
line” after five years, while FPSO light or those without infrastructure, to go af-
struggled to wash its face – based on ter them. With 120 players on the UKCS, ment plan was submitted.
$60/bbl prices. fi nding commercial alignment is diffi- Work to recommission a 60km sec-
Ian Dring, an executive at Sea cult, compared to the Dutch shelf, where tion of the 24in Thames pipeline is
Captaur, which has developed a produc- there are four players, one of which is underway, with plans to send intelligent
tion buoy concept (OE: August 2016), the national oil company, says Chris pigs down it to assess its condition.
says there’s an opportunity for such a Pearson, from the Oil & Gas Technology A solution to any problems could be a
technology. He says, of 347 undeveloped Centre in Aberdeen. “It’s classic market
16in run through the current pipeline,
fields on the UKCS, 130 contain more failure,” Drummond adds. “It’s now
which would be subject to more rigorous
than 6 MMboe and 155 are currently 80% owned by 20%, it’s lots of people
unlicensed. He suggests using an un- owning a few and no appetite that’s inspection than many other pipelines
manned buoy type system, with subsea killing us.” in the SNS, Routh said. “Pipelines are
oil storage and a shuttle tanker to offload There could be a change. Pearson usually over-engineered – some of the
oil periodically. It could also be used says that the UK regulator, the Oil and 1960s pipelines are still flowing gas
for late life field extension, when larger Gas Authority, is starting to take a “use safely more than 20 years beyond their
facility such as an FPSO is no longer it or lose it” approach to those sitting initial design life.”
viable, or as an early production system on these assets and not doing anything
The project will be the first recom-
for a larger field. with them. One operator was said to
missioning of a decommissioned SNS
John Woods, of Aberdeen-based have half a dozen of these opportunities
Offshore Production Buoy (OPB), but would not put them across infra- pipeline. IOG is inviting the supply chain
says: “There are a lot of assets (fields) structure other than their own. “This to work on the basis of payment on pro-
out there that need these solutions.” could help us, but it’s a big challenge,” duction, estimated at 150 MMcf/d at its
OPB has a ca.28m-diameter, 12m-high Pearson says. peak by 2020.•
on wax
water injection flowlines, served from the
Njord A topside, to an injection template,
close to the production template.
For the Pil and Bue flowline, VNG
Norge screened three options: pipe-in-
pipe (PIP) without active heating, which
Waxy crude on the Pil and Bue project and topside would rely on pipeline depressurization
for hydrate management and continuous
constraints has led VNG Norge to explore pipe-in-pipe wax pour point depressant injection;
heating systems. Elaine Maslin reports. electrical heat trace (EHT) PIP technol-
P
ogy; and direct electrical heating (DEH)
il and Bue, or bow and arrow, are makes it even more challenging.” of the pipeline.
oil and gas discoveries in Blocks VNG Norge looked at a standalone Forooghi says that early in the project
6406/11 and 12 on the southern development, using a floating produc- lifetime hydrate formation pressure
part of the Halten Terrace in the Norwegian tion vessel, but chose the tieback option will not be reached, when the flowlines
Sea. Both discoveries were made in 2014, to Statoil’s Njord A facility. The next are depressurized. But, there would be
and contain a total 80-155 MMboe. closest host for a tieback would be issues with low pressure startups, due
But, to produce these fields, operator Shell’s Draugen platform, some 65km to the amount of liquids left in the line
VNG Norge, faces a number of chal- away. But, while Njord A is closer, it after depressurization, leaving gelled
lenges. “The Pil and Bue fields are also has process constraints, including segments that would need 200-400 bar
quite waxy, with a high pour point [the gas compression ullage, surge volumes pressure to restart the line – without
point at which a liquid loses its liquid to accommodate slugging and liquid active heating.
properties],” Alireza Forooghi, lead flow handling for pipeline depressurization. In a DEH PIP, the flowline forms part
assurance engineer, VNG Norge, told The flow assurance challenge could of an electrical circuit. A number of
the Underwater Technology Conference be tackled using heated pipelines. Most variations exist, where the inner pipe
(UTC) in Bergen in June. “The fluids existing waxy crude developments are on- and outer pipe form a circuit (end-fed
form strong gels during shut down. A shore, Forooghi says. Those offshore are PIP), or where a piggy back cable provid-
30km journey to the topside facilities mostly non-gel forming and the few that ing power is used completing the circuit
SUBSEA
where power is supplied from a mid-line gas dehydration concept. It is a two-stage
connection along the pipe, then forming gas dehydration process based on the
an electrical circuit with the inner and firm’s Minox Deoxygenation technology.
outer pipes. The technology - initially designed for
Closed circuit (or center fed) DEH PIP topsides has two separators with static
has been used in the US Gulf of Mexico mixers upstream. Glycol (TEG or MEG) is
on the Oregano and Serrano fields, since used to extract moisture from the gas–
2001. This was a fi rst for the technology, including a conventional TEG regenera-
Forooghi says. Open loop, or piggy back tion. The system use less glycol than con-
DEH applications, have also been used ventional dehydration systems and would
on various Norwegian fields, including be a lot more cost effective solution than
the fi rst DEH application of any kind injecting glycol for flow assurance with an
on Asgard, in 2000. Center fed systems untreated gas.
have been used on Na Kika (2004) and Minox has completed full-scale testing
Habanero (2003), both in the US Gulf of of the system at Statoil’s K-Lab, at Kårstø,
Mexico. Norway, supported by Statoil and the
EHT PIP has also been used, Forooghi Research Council of Norway (Demo2000
says, on Total’s Islay project in 2011. program) and is awaiting a report. The
EHT uses trace heating elements, i.e. next steps will be adding a glycol pump
cables, helically wound around the and optimizing how much glycol is needed.
pipe. This is an option gaining traction, To take the system subsea, which the firm
Forooghi says, with others looking at it plans to do, will involve a full redesign
for Norwegian developments, including tailor-made for the subsea environment, Minox’s system. Photo from Minox.
Tommeliten Alpha, and it’s an option for says Minox CEO Bjørn Einar Brath.
Snadd, as well as Total’s Zinia 2 project Brath says that the system is already tower technology. It is an inline technology
offshore Angola. half the weight and size of a comparable that could be deployed onshore, offshore
“DEH PIP has some real advantages,” system. Traditional systems consist of and, potentially, subsea.
Forooghi says. “It has relatively high large contactor towers, absorbers, extend- cMIST removes water vapor from natural
thermal performance in the system, the ing up through multiple topside decks, gas with a 70% reduced footprint and 50%
flowline size is not limited. It can be where the wet gas reacts with TEG as it of the weight of traditional systems, the
laid in S-lay and J-lay, it is field-proven, passes through the absorber. The conven- firm says. At its core is a “droplet genera-
operational and possible to repair if tional towers are sensitive to movements tor,” used to break up conventional solvent
the system fails. The disadvantages of the installation, which can be a problem into tiny droplets that become dispersed
are that it has relatively high-power on floating installations, and require larger in the gas flow, increasing the surface area
demand, and while it’s applicable in volumes of TEG and the energy. for the absorption of water from the gas.
short flowlines, longer flowlines need to The firm has been making systems using This is followed by an inline separator that
be divided into sections, and it requires similar technology for water deaeration for coalesces the water-rich glycol droplets
a relatively high number of bulk head topsides since the late 1980s and it is used and moves them to the outside wall of
and water stops to make it,” although by nine major operators now. the pipe for effective separation from the
this is the same for EHT, he says. It’s ExxonMobil has also been working on dehydrated natural gas. The water-rich
also exposed to relatively heavy wait- gas dehydration technologies. Earlier this glycol is regenerated using a conventional
on-weather for offshore operations and year it unveiled its cMIST technology, system and sent back to the droplet
welding, he says. which dehydrates natural gas using an generator to be used again. ExxonMobil
The advantages of EHT are relatively absorption system inside pipes, replac- has licensed cMIST technology to the
high thermal and electrical efficiency, ing the need for conventional dehydration Chemtech division of Sulzer. •
he says. “It has a good level of redun-
dancy through using a number of heat on a continuous basis.” This could mean a move towards using
traced cables. It can be tested onshore VNG is running a competitive higher voltage cables, which would be
for faster offshore installation. The main front-end engineering and design exposed to relatively high temperatures.
disadvantage is the limitations in size of (FEED) study between Subsea 7 and “The overall system behavior will need
pipe. The biggest flowline size to date in TechnipFMC, following which it will to be designed and simulated to design
12in and it is limited to reel lay or tow- look to qualify the technology for Pil life,” Forooghi says.
ing to field and it’s not repairable. and Bue, due to new elements in the Development engineering work is be-
“EHT is the best option for Pil and Bue, system for the development. ing supported by Norway’s Reinertsen.
because we only need it in shut-down This is likely to be around the chal- The subsea production systems contract
and start-up. During normal operations, lenges of using this technology on a was awarded to TechnipFMC and Aker
we will be running quite hot. In late field 34km tieback – when previously it’s Solutions. A contract for engineering,
life we are planning to have gas cap blow been limited to shorter lengths (6km procurement, construction and installa-
down, when might be required to be used on Islay), due to short heating circuits. tion is due to be awarded in Q4 2017.
connected
Photos from Hydro Group Systems.
Sometimes seen as the weak system advances and, in some cases, is such as the military with concern over
even getting ahead of the market need. the submarine safety. Such problems led
link in the system, subsea However, as metal, plastic and new to the need for specific guidelines for
connectors have come a long exotic material housings improved, so designers and manufacturers of connec-
did system requirements, with a desire tors to develop qualification testing to
way. With new challenges, larger for more data or power conductors in the ensure specified requirements were met
throughput requirements, new connectors. This then drove the need for not only in performance and environ-
smaller conductors and higher-density mental testing, but material certification
materials and methods this is an connectors with acceptable dielectric tests too. Products were now required to
ever-evolving technology, says materials. be “qualified” to a specification.
As engineers worked on materials to A subset of this trend is in fiber optic
Hydro Group Systems’ house the epoxy – rubber, glass to metal components, which we’re seeing being
Bill Mildon. seals or plastics inserts –we found that continuously developed for use with
the increased power capability and huge increasing bandwidth in data and faster
S
increase in data transfer capability is speeds to get data from point to point.
ubsea electrical and optical sys- critical in the progress of undersea sys- As the components and systems are
tems connection has been devel- tems. This new ability, to power larger developed, the interconnection is also
oped from decades of research and systems and multiple systems with modified to attach elements of the sys-
development, looking for cost savings, one input cable and connector plus the tem together.
performance enhancements and ways to ability to add more sensors, is smarter The fiber challenge was very difficult
address environmental challenges. and can handle faster data rates and
Engineers and scientists have been increased bandwidth requirements.
supporting military operations and But, each new development has its
pushing oil and gas activities deeper, own set of problems,
farther and faster. This in turn has in one market
helped the telecom industry maximize or another,
throughput of data, reduce downtime
and lower the cost of systems at sea.
All such developments must include
connections to communicate, sup-
ply power and monitor status. These Subsea
connections have also evolved and are electrical
umbilical
being made from new materials for new
termination
environments and new system require- unitcoaxial
ments. In many cases the connector and electrical
industry is trying to keep up with the connector.
William (Bill)
Mildon is president
of Hydro Group
Systems in Pinellas
County, Florida, a
subsidiary of
UK-based Hydro
Group. Bill has held
a number of senior positions, most
recently as technical director at Nest
Technical Services. He has lead teams in
submarine penetration designs, under
Hybrid coaxial and water connectors and numerous fiber
electrical connector. optic inter-connect products.
Design once,
can provide control and power and also
carry out fluid processing.
While wellhead platforms have long
been a favorite in the shallow waters of
build many
the southern North Sea, up until now,
the preferred option for the develop-
ment of satellite fields in deeper water
has been to use a subsea manifold with
a tieback to the host facility. Subsea
manifolds are tried, tested and trusted,
but, WorleyParsons has carried out a
number of studies showing that they
Rob Gill and Steve Henzell
don’t necessarily provide the best value
explain how WorleyParsons solution for a multiple well develop-
ment. The difficulties and additional
intends to make wellhead
costs associated with maintenance and
facilities production cheaper future well intervention operations can
and faster with a design one, all contribute to increased costs over the
lifetime of a project.
build many ethos. With 30+ years’ experience in the de-
sign of unmanned wellhead platforms,
WorleyParsons has accumulated a refer-
ence list of more than 500 installations,
which are currently operating through-
out the world. The WorleyParsons team
has combined this experience with
ideas borrowed from the shale industry
– where standardization and modular-
ization of equipment is the key to low-
cost field development – and they have
T
come up with a new concept in well-
he pressure to reduce the cost our industry’s being forced to adapt to head platforms suitable for installation
of new developments has never new ideas. in deeper water and able to withstand
been greater for North Sea One development concept that’s start- North Sea conditions.
operators. The combination of low oil ing to gain traction is the use of low-cost The new design uses piled founda-
prices, decreased North Sea development wellhead platforms for the develop- tions, can be deployed in water depths
opportunities and increased competition ment of small satellite fields. These are of up to 120m, and provides space for a
from the US shale industry means that typically newly discovered fields close maximum of 12 well slots. No accommo-
dation has been provided for personnel
Varying water depth who will gain access for four-monthly
maintenance visits by vessels equipped
with a “walk-to-work” gangway. The
platform design includes a 5-tonne
crane and sufficient deck space to allow
full access for future well intervention.
WorleyParsons has also designed the
new platform for construction within
their covered yard near Stavanger,
Norway, and with one flat side to permit
installation by either barge launch or
60 m jackup platform to widen the choice of
installation contractor.
The platform is designed with a
80 m “design once, build many” approach to
capture economies of scale and effi-
ciencies more closely associated with a
100 m production line than a North Sea con-
struction yard. The design borrows from
the philosophies that WorleyParsons has
Minimal scalable facilities. Images from WorleyParsons. 120 m previously followed in both the Persian
P
73%. But, this is still far below an 80%
roduction efficiency has come efficiency...” as contributors to this ef- target and the report highlights that
under the spotlight on the UK ficiency loss. Oil & Gas UK’s Efficiency “Plant losses continue to be the largest
Continental Shelf (UKCS) – Task Force determined that most of loss category in 2016, representing
and not for good reasons. Even before the production loss referred to in the 60% of total losses.”
oil prices collapsed in mid-2014, the Wood Review could be attributed to
watershed Wood Review found that “unplanned plant losses and planned
“Production efficiency... has fallen shutdowns...” It subsequently issued
from 80% a decade ago to 70% in 2010 a pamphlet offering “Guidance for
and to an average of 60% in 2012.” the Efficient Execution of Planned
The Wood Review cited poor as- Maintenance Shutdowns.”
set stewardship and “poor project In June, the Oil and Gas Authority
management, planning and execution (OGA) published the UKCS Production
Top quartile 1% 4%
Industry average 7% 9%
Top quartile 3% 5%
in duration. On an annualized basis, a changes. Firstly, they communicate focus on, “How much scope can we
turnaround of 26 days each year versus a tight focus on what the turnaround implement in the time given to us?”
a turnaround of 30 days (15% longer) is intended to accomplish. A very This attitude is inadvertently enabled
every two years represents the asset specific and clear “premise” docu- and encouraged by the fact that the
being shut down for 7% of the year ment defi nes why the turnaround offshore turnaround duration is rarely
versus 4% of the year. The advantage is needed. This naturally leads into set by the team based on the scope of
of extending the interval appear to be a clear defi nition of the criteria for work. Rather, the durations for offshore
outweighed by increased turnaround including scope in the turnaround. In turnarounds are generally imposed
duration. the upstream industry, this premise on the turnaround team by senior
document is generally not written in management and are based on market
Reducing scope as clear a manner as those in the refi n- expectations, not on practical, scope
As well as extending the turnaround ing industry. Offshore premise docu- based need.
interval, an obvious step in reducing ments tend to focus on total shutdown
production loss is to reduce the dura- duration, no accidents, and other lag- The path forward
tion of the turnaround itself. This can ging performance indicators. What is It is the view of Asset Performance
be by focusing only on scope that is missing is a clear defi nition of “why” Networks that addressing the following
“necessary” for safe and uninterrupted the shutdown needs to take place and issues could have a major impact on pro-
operation and deleting “discretionary” hence what scope is “necessary” vs. duction efficiency in the North Sea.
scope. “discretionary.” • Focus on interval calculations that
Data gathered by Asset Performance Secondly, the onshore industry has take into account what the entire inter-
Networks indicates that offshore turn- begun using Risk Based Scope Review connected asset network is doing, not
arounds tend to include significant (RBSR). Prior to freezing the scope, all just the asset itself.
“discretionary” scope. Figure 1 shows scope items are “challenged” on wheth- • Set out a clear premise explaining
the average volume of scope added to er they meet the scope criteria and, in “why” the turnaround is needed, and
onshore turnarounds after scope freeze the case of preventive maintenance, on hence what the scope criteria are.
and before the turnaround, as well as whether the cost of including the item • Challenge scope inclusion, using RBSR
scope “discovered” during the turn- in the turnaround is less than the risk methods.
around. Figure 2 gives the equivalent of it breaking during the subsequent • Allow turnaround durations to be set
data for offshore turnarounds. This data turnaround interval, coupled with the according to the needs of the scope, not
shows that there is a significant “reduc- lost production and cost of repairing the desire of the market.
tion” in scope during the execution it when it breaks. Asset Performance
of offshore turnarounds. When inter- Networks has helped teams to reduce Gordon Lawrence
viewed about this reduction, offshore scope by typically 10% to 20% using is the manager of
teams explained that they had “dis- this method. Offshore teams tend not Capital Project
covery” work, just like onshore turn- to have the same rigor in challenging Consulting in the
arounds. However, offshore they were scope and the tendency is to include Amsterdam office
able to cut discretionary scope to not scope based on personal preferences of Asset
only accommodate the discovery work, and say-so. After both these actions, Performance
but also to ensure that the turnaround onshore teams retain their gains by Networks. He is a
duration was not excessively threatened. ensuring that the scope control pro- chartered engineer, a registered
This is clear evidence that offshore cess, post scope freeze, is rigorous and engineer with FEANI and a Fellow of
turnarounds contain a lot of “discretion- fi rmly enforced. the UK Institution of Chemical
ary” scope. Engineers. He holds degrees in chemi-
A decade ago, the onshore industry Changing the goal cal engineering, biochemical engineer-
also had a culture of pushing “discre- The focus on scope encourages onshore ing and business administration, with
tionary” scope into the turnaround. teams to ask, “How much time do we over 30 years’ experience in project
They managed to move away from need to implement this scope of work?” management and maintenance turn-
this attitude by implementing some Conversely, many offshore teams still arounds in the process industries.
Efficiency guidelines sets out recommendations and good procedures. A basic review would involve
practice for improving compression an assessment carried out after the execu-
Industry guidelines designed to boost system performance, covering areas tion of each maintenance activity, improv-
production efficiency in the UK Continental such as: ing efficiency by providing a real-time
Shelf have been published by Oil & Gas UK. • Compression system maintenance response to any issues which arise.
“Guidelines to Maximise Compression • Integrity assurance PETF chairman and Operations Director
System Efficiency” aims to address gas • Equipment and process condition moni- of North Sea Midstream Partners Matt
compression losses, which accounted for toring, and, Nicol said: “We have made great progress
more than 40 MMboe in unplanned pro- • Training and competency but still have more to do to achieve the
duction losses in 2015. It is recommended that companies have PETF’s 80% production efficiency target.
The document, devised by the a “lessons learned” process to ensure I encourage all operators to utilize this gas
Production Efficiency Task Force (PETF), continual improvement of maintenance compression best practice guide.” •
NEW
FOR 2017
Organised by
PRODUCTION
Mining
for ideas
With its remote and harsh We studied 26 improvement project the major oil and gas operators and sup-
case studies, carried out during 2009- pliers in the UKCS to get some under-
operations, mining has similar 2012, by a range of global mining organi- standing of where the oil and gas indus-
characteristics to oil and gas zations. They included below ground and try was in relation to their counterparts
open cut mines, extracting everything in mining in these areas.
exploration. Could the industry
from precious metals and stones to iron Many complained that vendors
learn from mining’s efficiencies? ore, oil sands, and copper. We then com- treated them as cash cows, while sup-
pared these approaches with current UK pliers said operators were forcing them
Innes Auchterlonie and Andrew
Continental Shelf (UKCS) trends. There into blanket rate cuts. Both views may
Woodward explain. were similarities and differences. have an element of truth and have
unfortunately led to an erosion of trust
W
Lean mining and an unwillingness to share risk.
e’ve heard a lot about how From a functional perspective, most In comparison, the successful initia-
the oil and gas industry mining improvement projects focused tives from mining focused heavily on
could learn from other sec- on contract and vendor management, win-win scenarios, aware that a strong,
tors. One sector the industry could learn working capital reduction, materials and responsive supply chain would be key to
from is mining. The industry operates inventory management and throughput. future success.
in similarly harsh environments, remote As an example, a copper mine in
locations and experiences fluctuating Australia that focused on the reduction of Inventory and
commodity prices, like oil and gas. It also working capital and spare parts inven- materials management
has a long history of operational improve- tory achieved annualized savings of US$9 The challenges around working in
ment projects, due to the challenging million, with $15 million in cash release. harsh remote environments, coupled
economic conditions in which it operates. We spoke with leaders from some of with the need to have spare parts at
Designs
DRILLING
on the future
in place. We’ve spoken to a number of
yards. We’ve got a full-scale prototype
that has been constructed and has been
tested. And, that’s the way we see the
market changing moving forward.
“Because the pressure from our cli-
ents is to materially take down deepwa-
ter cost through efficiency gains, and
something like the Floating Factory is
what is going to be required to deliver
on that opportunity.”
O
Photo from iStock. which is based on a previous design for
ffshore drilling contractors have Engineering Efficiencies Up Front to Noble Drilling’s Globetrotter rig and on
sought to meet future deepwater Reduce Deepwater Well Delivery Cost. Diamond Offshore’s operational experi-
drilling demands by enhancing Deepwater drilling efficiency will ences, de Groot says.
current capacity, but the idea of rede- need to be improved to meet the chal- There’s not yet a contract in place to
signing deepwater rigs altogether has lenges of exploration in plays such as build one of the rigs, but Huisman is con-
not been a major focus of discussion. the Gulf of Mexico Lower Tertiary/ ducting engineering for Diamond in prep-
Diamond Offshore’s Floating Factory rig Wilcox trend. These challenges include aration for construction, with the goal of
concept could change that conversation. complex sub-salt imaging capability, readying the Floating Factory rig for work
Diamond says it designed the con- reservoir depth, high-pressure, high- in 2020, de Groot says. In May this year,
cept with input from operators and temperature (HPHT) reservoirs, dis- ABS announced it had approved the basic
service companies to address the entire tribution of sand, flow capability, and Floating Factory drillship concept.
well lifecycle requirements expected cost-effective drilling and completion, A typical sixth generation floater has
from 2020-2030 and beyond. It says the Ken Richardson, EVP Offshore for clas- 2900sq m of free deck space, a 15-20m
Floating Factory aims to improve deep- sification society ABS, told OE. elevated drill floor, and measures 230m
water drilling by creating efficiencies, Current floating rigs “drill” only about by 42m. In comparison, the new design
enhancing safety, reducing overall well 20% of the time, with the balance charac- offers 4600sq m of free deck space, a
costs, and allowing for the future opti- terized as “flat time.” Flat time can include drill floor on the same level as the deck,
mization of 12,192m+ long well designs tripping, drill-line slip and cut, and the and measures 216m by 38m.
in greater than 3962m water depth. sequential rigging up and rigging down The Floating Factory rig features an
The concept, using lean methodolo- of equipment. This leaves considerable all-robotic drill floor, with tools that use
gies, combines improved safety with room for improvement through enhanced condition-based monitoring and offl ine
automation and robotics to reduce and new rig designs and equipment, said tool maintenance apps, West said in
bottlenecks and minimize controllable James C. West, senior managing director Evercore’s report. The rig has a casing
flat time for the entire well lifecycle, and partner with investment banking firm running tool integrated into the well
with a reduction in well duration and Evercore ISI, in a 22 June report. center, with automated changes to the
cost by 15-30%, says James Hebert, di- While the timing for the Floating casing clamp, and uses a fully auto-
rector of operations and technical sup- Factory may not be right for some in the mated pipe handling system. The center
port at Diamond, in a SPE/IADC 2017 industry. Diamond still believes in the of gravity on the rig also is reduced,
paper, The Floating Factory Concept: concept. and the weight is pushed outward. This
DRILLING
dealing with bad weather.
A dual multipurpose tower capable 6% BOP/Riser/Wellhead operations
6% Abandoning/Slot reclaimation
of handling 55m stands of pipe has
11% Mobilization
replaced the standard derrick and sub-
structure, reducing connection times, 15% Completion
Drilling Flat time
as the design is believed to be able to 23% 77%
trip at speeds of 1524m/hr. The hoist- 17% Casing and cementing
ing system is also designed for 1500-ton
static hook load compared to an average 22% Other flat time operations
of approximately 1250-ton for sixth gen-
eration drillships, West said.
The design eliminates the potential for
dropped objects by using welded connec- Drilling days saved with the floating factory in a GOM deepwater well
tions and an open character philosophy, DMPT Quantifiation Floating factory
or more open space for procedure prep. A efficiency aspect assumptions savings (days)
dual mud pit system allows for mud and Spud to BOP run
Increased offline casing and BOP handling 1.4
sequence
completions fluid to be treated simultane-
Unrestricted hi-speed Hi speed tripping of drill pipe d BHA only
ously. The Floating Factory also will have tripping Where surge and • 5,000ft/hr in open water and riser 4.2
three rooms with three medium-sized swab is not a limiting factor •4,000ft/hr inside casing down to 16in OD
engines in each versus older generation 180ft stands saves 2 connections per 1,000ft
Restricted tripping
designs that have three rooms with two • Tripping inside 16in and smaller casing
Where surge and swab is a 8.3
• Ability to run 16in casing from setback vs from main deck
large engines a piece. This should allow limiting factor
• Large bore or specialty tools
optimal engine loading, reduced fuel
Reduced drilling
consumption and lower engine wear and 180ft stands saves 2 connections per 1,000 -ft 0.7
connections
emissions output, West said. The rig can Dual multi-size Pipe OD range from 3.5in to 9.75in do not require insert
1.7
be fitted with a 15,000psi or 20,000psi power slips changes. Case slips can be installed quickly.
blowout preventer, de Groot says. Drill-line slip & cut Slip & cut is not required 2.1
Total days saved 18.4 days
Building a better mousetrap Percentage of total well time saved 16%
Instead of looking at new designs, the
focus of rig construction in the past
Drilling days saved with the floating factory in a GOM deepwater well
has been on building bigger rigs, Leslie
Floating factory Estimate Floating factory
Cook, principal analyst, upstream sup- efficiency aspect assumptions savings (days)
ply chain with Wood Mackenzie, told Improved logistics by increasing the amount of materials and
OE. To boost capacity for sixth- and sev- Increased deck equipment which can be stored on board improving off-line rig-up 4 to 7
enth generation rigs, drilling contractors storage area & rig-down capabiity. Also decreases risk of potential weather
related NPT.
added greater top drive and mud pumps
Provides space for extra 3rd party personnel to support the off-
capacity, and dual, larger blowout Increased POB
line rig-up & rig-down activity.
2 to 4
preventers with more shear rams. More Allows off-line handling, storage and treatment of drilling, comple-
storage capability was added to allow Dual mud system tion fluids, including spacers & flushes. Provides for safe and off- 1 to 7
more equipment to be stored onboard. line cleaning of shaker pits, mud pits and suction piping.
Strong demand for rigs in 2000-2014 Direct crane access Improves the ability to be assembled andtested off-line and placed
to a large drill floor on the drill floor as a larger system as 1 to 2
contributed to a lack of new innovation
area compared to handling with drill floor tuggers.
in rig design, West said. Then when the
Off-line rig-up & rig- Supports the ability to rig-up & rig-down items such as lift-frames,
downturn hit it was all about survival. down of completion surface flow trees, and hoses off-line while deploying the subsea 1 to 2
“We’re fi nally at a period where rig com- equipment trees.
panies are turning towards the future Total days saved 9 to 22
and the innovation that is necessary to Source: Company Reports, Evercore ISI Research
compete,” he added.
Shipyards also drove the design of
drilling units instead of the drilling
contractors who had to work with them.
This has led to a situation that is not ac- Floating Factory concept.
cepted in other, more competitive sectors Photo from Diamond Offshore.
of the offshore industry, de Groot says.
Getting a new floating rig design off
the ground in the next three to five years
will be challenging, Cook says, due to
the lack of appetite for newbuild rigs,
and the difficulty rig contractors will
more newbuild rigs is a good strategy. “In the context of the price environ-
According to Wood Mackenzie, the mar- Focus on efficiency ment, it appears that the rig contractors
keted utilization for the global floating Drilling contractors have been looking are looking to provide the best value
rig fleet is 60%, while total utilization to upgrade their current fleets to reduce for money for their clients – providing
for floating rigs is around 40%. non-productive time when rigs are on faster drilling, higher spec rigs,” Adams
The downturn – which has forced contract, and increase their likelihood of says. “I would infer that their strategy,
drilling rig contractors and many others being picked up for new contracts. Over while rig day rates are low, is to show
into a period of harsh self-reflection – the past year, drilling contractors have operators ‘how good it could be,’ getting
will provide a fantastic opportunity primarily focused on reducing operation- them to pick-up cheap, high spec rigs so
for new technologies over the long-run, al, maintenance and repair costs, which that when/if day rates recover, operators
Matt Adams, senior analyst, Douglas- account for 25% of daily cash costs, so choose to stick with the high spec rigs
Westwood, told OE. However, Adams they can continue to work through the due to greater efficiencies, rather than
doesn’t expect the Floating Factory to low day rate, low oil price environment. going for cheaper but lower spec rigs.”
be added to the existing fleet any time To reduce costs, contractors are Of course, Diamond believes the
soon. Instead, drilling contractors will leveraging Big Data and analytic tools, Floating Factory could aid in creating
mainly focus on improving efficiency Cook says. The oil and gas industry has further efficiencies. Edwards said in
and desirability of their existing fleets lagged in adopting these kinds of Silicon the Q1 call that while the dual derrick
before looking to new designs. Valley technologies, but is now looking system brings the most advantage, creat-
“From a capex perspective, it would at putting sensors on equipment and ing a 6-10% efficiency gain, the Floating
likely make more sense for contractors using predictive analysis to accurately Factory could potentially do better
to retrofit/upgrade their existing idled predict when equipment needs to be than that, however. “We’ve done some
units, rather than come up with new rig changed, or which parts of the drilling [deepwater operations plans] with our
designs and start a new ordering cycle,” and operations processes need to be im- Floating Factory designs and over and
Adams says. By doing that, they can both proved. Examples of these efforts include above the dual derrick rigs, we can put a
help operators, by bringing down well Ensco’s new asset management system, further 20-30% efficiency gain on drill-
costs and improving project economics, Diamond’s pressure control by the hour, ing the wells out there,” Edward said.
and help themselves by increasing the Noble Drilling’s digital rig solutions, and “So, that itself is quite compelling.”
Internet
of oil things
The Internet of Things is Innovation at Total E&P UK, told del- the fi rst machines that mechanized
egates the Subsea North East Conference some of the work that people did.
becoming ever more embedded & Exhibition in Newcastle, England, Industry 2.0 – Electricity, which created
in the oil psyche. mid-June. the assembly line and the birth of mass
Mackinnon described this as a clash production. Industry 3.0 – Computers,
Steve Hamlen reports.
between two worlds where you can no which brought about the beginnings of
longer be in just the machine camp or automation and saw robots and ma-
T
the Internet camp. In the near future, chines starting to replace human work-
he increasing use of sensors you will need to be in both or face seri- ers on those assembly lines.
coupled with the progress in ous challenges to
data collection and management survive. Digital supply chain
not only offers the oil and gas industry “In an IoT world, Mackinnon believes that the oil and gas
great cost reductions, but also the chance many companies industry is heading towards a digital
to fully embrace the march towards will discover that supply chain that will revolutionize the
“Industry 4.0” – where computers and being just a manu- sector. However, such a system is well
automation merge, where the Internet facturing company advanced in many other industries, so
and manufacturing are part of one digital or just an Internet oil and gas must play catch-up.
supply chain. company will no He used the example of a supermarket
Mackinnon
“This is the Internet of Things (IoT), longer be suf- planting a lettuce in one country and
where computers and automation come ficient; they will need to become both tracking it all the way from harvest to
together in an entirely new way, with – or become subsumed in an ecosystem transport to being placed on a shelf in a
robotics connected remotely to com- in which they play a smaller role,” UK store – all tracked and traced from
puter systems equipped with machine Mackinnon said. start to fi nish.
learning algorithms that can learn Industry 4.0 is this merging on com- “Can we do that,” Mackinnon asked
and control the robotics with very puters and machines. The pre-cursers, the audience, before citing other
little input from human operators,” he says, were: examples, such as Nike, which allows
Dave Mackinnon, head of Technology Industry 1.0 – Steam, which produced a customer to choose a training shoe
online, customize it with regards to “We are pleased to be collaborating with such expert partners in the devel-
colors, laces, size and then click for opment of Hrönn, a vessel that will show how digitalization and autonomy
delivery. All of this data is stored and have the potential to revolutionize the offshore services market,” said Stene
managed. Førsund, EVP Global Sales and Marketing, Kongsberg Maritime. •
Mackinnon suggested that this has
great potential in the oil and gas indus-
try, such as tracking and tracing the life-
cycle of a subsea Xmas tree. Collecting
and using the data of when and where
it was manufactured, who bought it
and where it was used, including any
maintenance work required, will help
any future buyers of the hardware make
an informed decision: “This is Industry
4.0,” he says.
The elements of the digital supply Hrönn Photo from ASL.
Virtual
can also operate in conjunction with
other modeling systems, for example,
well and pipework flow simulation soft-
ware can be integrated with the system
metering
to facilitate real-time modeling. VFM
systems can also be linked to statistical
analysis methodologies, which can as-
sist real-time trend identification.
Most of the existing virtual flow
meter models are based on the prin-
NEL’s Damian Krakowiak range of multiphase flow conditions. To ciples of conservation of momentum as
provide confidence to end users, more well as on mass and energy equations.
examines the potential of virtual
knowledge on the performance of VFM The correct application of these equa-
flow metering technology and systems is essential. tions ensures that each instrument will
be also “checked” for its operational
how better testing could enable
Virtual flow meter system health. In addition to the measurement
its adoption. In the last five years, several VFM sys- values from the existing instrumenta-
tems have been installed in most of the tion network, full data analysis and
W
major producing areas, including the reconciliation will show live respective
ith the variety of technologi- Gulf of Mexico, North Sea and East Asia. uncertainties for each measurement.
cal solutions for multiphase VFM systems models are based on This will be used to determine if indi-
flow metering, many compa- data from existing instrumentation vidual instrument measurements are
nies are now providing software solu- within the system such as pressure within uncertainty limits by changing
tions for establishing aver- the instrument state to alarm
age flowrates for specific state.
applications. Increased In turn, this will help
demand for real-time flow predict instrument behavior
rate representation for and aid decision-making on
both oil reservoir manage- routine maintenance, high-
ment and fiscal allocation lighting any instruments
are the main driving forces that are not working or not
for the development of performing within expected
software-based solutions uncertainty.
to estimate well flowrates.
Measurement of pro- Validation and
duction is essential to best verification
optimize the hydrocarbon Like most measurement
production strategy from technologies, VFMs re-
wells. This is achieved by quire period verification
performing a well test, the Validation needed. Photo from NEL. or calibration. On average,
data from which is used instruments are calibrated at
to optimize the well’s production rates. and temperature sensors, choke valve yearly intervals, or when there is a sig-
Installation of physical multiphase feedback, and control valves feedback. nificant change in process conditions or
flowmeters can be quite often problem- Various mathematical models are cre- well performance. Calibration involves
atic (calibrating, post-installation tun- ated to ensure that together they fit and comparing the VFM predictions with
ing, maintenance) and very expensive, fully represent the overall system ad- physical flow measurements. This can
however. equately. There are different approaches normally be accomplished by perform-
Virtual flow meter (VFM) systems that can be taken to create a complete ing a well test, i.e. routing the flow from
can be an effective alternative for model of multiphase flow. VFM models the well through a test separator or a
multiphase flowrate measurements can be created by including steady-state multiphase flow meter for a set period
and can be used as a backup for the or transient flow simulations that are of time. If necessary, model parameters
existing systems. However, there is based on data reconciliation and data will then be adjusted to minimize the
little understanding of the measure- validation techniques. Appropriate differences between the predicted and
ment uncertainty of VFM systems in modeling can be achieved by basing measured flow.
industry. Validation of VFM systems models on single components such as:
is crucial and, although recent studies reservoir, choke, valves, orifice, venture, Previous research
describe overall performance of virtual and flowlines. Another method is based Research Partnership to Secure Energy
measurement systems, they do not upon the complete network model that for America (RPSEA) completed an
evaluate the models which drive VFM consists of many components intercon- evaluation into flow modeling in 2011 [1].
systems in great depth nor over wider nected together. The RPSEA project planned to complete
dollars every year. An accurate mul- Houston 713.821.0050 the USA. Port Allen 6A – 1866 ISO – 3101 Q1 – 3130
Improving
massive amount of data gathered in
operations (OE: June 2017).
One example of industry’s interest in
CBM is drilling contractor Transocean
maintenance
and GE Oil & Gas’ announcement in
January that GE would provide CBM and
maintenance services for pressure con-
trol equipment on seven of Transocean’s
rigs over the next 10-12 years. The
agreement, signed in late 2016, lever-
Karen Boman speaks with CBM is a bit of a general catch-all ages GE’s digital capabilities to shift
term that encompasses several different from event and calendar-based main-
Prasantha Jayakody of Bsquare data-driven maintain/repair concepts. It tenance to condition-based monitoring
about the benefits of condition- should be viewed as a “maturity model” and maintenance. Working with GE on
as predictive maintenance can be done parts forecasting and service schedul-
based maintenance and the without CBM, but CBM can’t be done ing will allow Transocean to optimize
challenges of implementation in without adaptive diagnostics (AD), says operations by proactively planning and
Prasantha Jayakody, senior product minimizing between-well maintenance,
the oil and gas industry.
manager for Bsquare Corp., an Internet GE said at the time.
R
of Things solution provider. CBM builds
educing non-productive time on AD, which gathers existing struc- OE: How did the offshore oil and gas
related to equipment mainte- tured and unstructured data to create industry view CBM prior to the 2014
nance and breakdowns is neces- a comprehensive view of maintenance oil price downturn? How has the view
sary during the downturn as companies activities and recommend the best fi x. changed post-downturn?
seek cost reductions. To achieve these CBM uses analytical software to deter- Prior to the 2014 oil price downturn,
goals, the industry is looking to shift mine equipment condition in real-time, CBM was commonly viewed as a
from reactive or even preventative main- based on equipment operating use and ‘nice-to-have’ and while most fi rms
tenance to data-enabled maintenance, sensor data combined with the equip- recognized the benefits of data-driven
which is automated and gathers informa- ment’s AD history. maintenance, few fi rms pursued it.
tion in real-time. Data-enabled mainte- CBM is one of the tools oil and gas With oil prices north of US$100/bbl,
nance includes predictive maintenance, companies could use as they seek to companies could afford to run to failure
predictive diagnostics, and condition- digitalize their businesses. Currently, or practice interval based preventative
based maintenance (CBM). the industry is hoping to leverage digital maintenance without serious repercus-
sions to the bottom line. In the years
Condition-based maintenance (CBM) following the price downturn, operating
budgets were slashed while companies
focused on projects with reduced scope
and the highest return on capital. With
operating budgets greatly reduced,
redundant roles were eliminated across
maintenance and reliability teams and
basic equipment maintenance became
the status quo.
OE: What other challenges face the oil and gas industry in
adopting CBM?
Scalability is a challenge for CBM for several different
reasons. In modern rigs, data collection is natively built into
most of the equipment, but it becomes more difficult in older
installations. Granted, equipment doesn’t have to be replaced
outright as data collection technology can be retrofitted to
older equipment, but this retrofit still requires planning
and capital. Secondly, the ideal scenario for CBM is when
you can compare performance characteristics and operating
parameters across several identical pieces of equipment. It’s
not realistic to have a single make and model of a given type
of equipment across all sites but some level of uniformity is
required.
oedigital.com
REGIONAL OVERVIEW
Brazil
Turn the
page
After years of turbulence
fueled by scandal and debt
woes, Brazil and its oil
company Petrobras detailed “We do want more investors. We do want more people
how they intend to get back coming to Brazil,” Coelho Filho said. “Bid rounds, like the
one that we are trying to host in the second semester, [will]
on the right track. be responsible for the Brazilian recovery, and the economy
recovery that we need to put Brazil back on track.”
Melissa Sustaita reports. He told the audience that there are many other issues that
need improvement, and that the Brazilian government is
“
W
working on solutions.
e are trying to put the country back on track,” “We are far, far away from doing everything we want, but
said Fernando Coelho Filho, Brazil’s Minister we already [made] our fi rst step. We now have a very clear cal-
of Mines and Energy, at his first-ever visit to the endar of the dates when the auctions will take place,” Coelho
Offshore Technology Conference (OTC) in Houston earlier this Filho said.
year. Brazil’s upcoming auctions for pre-salt areas are in place
Coelho Filho said that the Brazilian government is work- for 2017 until 2019. A total of four bid rounds will be held this
ing to improve the country’s business environment to allow year: the 14th bidding round, second production sharing bid-
investors and more companies to be able to operate. ding round, third production sharing bidding round, and the
The country recently eased criteria for oil and gas com- fourth marginal fields bidding round.
panies to participate in pre-salt auctions, which are also on The 14th bid round of concession auctions will focus on the
track until 2019, allowing companies other than Brazilian East Margin, which is set for 27 September, while the second
national company Petrobras to operate blocks. and third bidding rounds for pre-salt blocks under production
sharing contracts are scheduled for 27
October.
The offshore areas include
Sergipe-Alagoas, Espirito Santo,
Campos, Santos, and Pelotas.
Brazil will offer 287 blocks at a
total area of 122,622sq km. The
acreage also includes onshore
basins.
Sergipe-Alagoas will offer 11
blocks at a total area of about
7700sq km in ultra-deepwater,
with an estimated 15 billion bbl
in place.
The Espirito Santo basin
includes seven ultra-deepwater
blocks at a total area of about
5000sq km.
The ultra-deepwater Campos
Fernando Coelho Filho, Minister of Mines and Energy, speaks at OTC 2017 in Houston. basin has 10 blocks on offer, at
Photo by OTC/Scott Morgan. a total area of some 5500sq km,
with an estimated 13 billion bbl in place. Petrobras experienced an increase in gross debt, reaching
The Santos basin has 76 blocks, both in shallow and deep- more than six times the level of 2009, and much above the
water, at a total area of about 20,000sq km. industry level. Parente said that due to the debt interest rates,
The Pelotas basin will offer six blocks at a total area of Petrobras is not able to invest as it would like to.
about 15,000sq km in deepwater. Under the company’s new strategic plan for 2017-2021,
In 2018, Brazil’s 15th bid round will focus on the Equatorial Petrobras is working on a new pricing policy, increased capex
Margin and will offer the offshore areas of Foz do Amazonas, productivity, increased opex efficiency, and is seeking part-
Ceara, Potiguar, Campos, and Santos. The year will also in- nerships and divestments.
clude the fourth production sharing bidding round with areas “We are intensifying our partnerships with operators, with
available in Saturno, Tres Marias, Uraipuru, and Campos; in service companies, and with research institutions,” he said.
addition to the fifth marginal fields bidding round covering “We really feel good about partnerships in the E&P area. We
marginal oil and gas accumulations in mature basins. have more than 130 partnerships.”
The 16th bidding round in 2019 will include the offshore Parente said that partnerships will boost the company’s
areas of Jacuipe, Camamu-Almada, Campos, and Santos. activity in upstream, including: taking advantage of techno-
The 2019 bidding rounds, which will also focus on the East logical knowledge, help with lowering research costs, faster
Margin, will include the fifth production sharing bid round production growth, lower capex, lower lifting costs, and
covering the areas of Aram, Southeast of Lula, south and reduce the breakeven of production in Brazil.
southwest of Jupiter, and Bumerangue; and the sixth mar- He gave an example in which it took 300 days for Petrobras
ginal bid round will cover marginal oil and gas accumulations to develop its fi rst pre-salt well. Now, Petrobras can now de-
in mature basins. velop a pre-salt well in less than 90 days.
Coelho Filho said that the auctions are expected to raise In its divestment process, the Brazilian giant has changed
about US$2.6 billion (BRL $8.5 billion) in signing bonuses. its target to reach $21 billion in 2017-18 across its business, a
The auctions for 2017-2018 may bring in about $61 billion 54% increase from its 2015-2016 target of $13.6 billion.
(BRL $200 billion) over the next 10 years. For 2019, Brazil is Petrobras also intends to reach a total production of 2.8
expecting to see approximately $21 billion (BRL $70 billion) of MMboe by 2021 in Brazil, and 3.4 MMboe internationally.
investments until 2027. “In reality, Petrobras was a victim of this huge scandal that
Petrobras CEO Pedro Parente’s message was in sync with we’ve seen in Brazil,” he said. “We’re working very hard to
Coelho Filho, as Parente told the OTC audience that the com- leave this in the past.”
pany is also on a mission to get back on track.
Parente said that Petrobras is adopting a new strategy, creat- FURTHER READING
ing opportunities for both industry operators and suppliers,
Brazil reveals 14th Round terms Brazil’s National
as well as expanding partnerships with universities and
Petroleum Agency has published the final bidding
research institutions that will include cutting-edge techno-
terms for the 14th Round for oil and gas blocks set
logical development with lower costs and greater production
for 27 September. http://bit.ly/2uN9eaE
growth.
Brazil
Pioneering
under pressure
Petrobras’ insatiable deepwater production plays a significant role when
it comes to driving global subsea systems demand. Elaine Maslin speaks
with the firm’s subsea systems executive manager Cristina Pinho.
Brazil
Pre-salt
prevails New Petrobras FPSOs in Brazil
of interest from potential
5 bidders with tender docu-
ments for the 100,000b/d
4 4 4 Marlim 1 FPSO expected
to be released in late 2017.
2 Statoil
Peregrino A platform. Photo from Statoil/ Øyvind Hagen. In May, Heerema
Fabrication Group (HFG)
Brazil is slowly emerging from 2017 2018 2019 2020 2021 was awarded a contract
by Norway’s Statoil to
one of its worst economic crises provide a 9300-tonne jacket for the WHP-C platform, which
with the country’s oil and gas sector will be installed as part of the second development phase of
the Peregrino heavy oil field. Kiewit will supply the platform’s
no exception, says the EIC’s deck (with Wood Group providing engineering and procure-
Pietro Ferreira. ment services) while Cameron Sense will provide the unit’s
B
drilling package.
razil’s most important oil and gas player, Petrobras,
plans to invest US$74.1 billion by 2021 under its Karoon
revised investment plan. It is progressing with several Australian oil company Karoon is looking to install a 40,000
of its pre-salt projects. b/d production unit at the Echidna oil field, in the shallow
The much-delayed bidding process for the charter of a waters of the Santos Basin. A tender for a six-year charter
180,000 b/d floating production, storage and offloading (FPSO) contract is expected to be launched in the coming months and
vessel for the Libra pre-salt field (pilot project) seems to be near- it is understood that Karoon will welcome bids offering an
ing its conclusion. BW Offshore, MODEC and SBM Offshore FPSO or a semisubmersible unit connected to an FSO.
submitted bids to Petrobras in May and, at the time of writing,
a technical evaluation was underway. Commercial propos- Market perspectives
als were due to be revealed in July, with an award expected The local oil and gas market is eagerly anticipating three
in September or October. A tender process for the Libra 2 bidding rounds for exploration and production blocks taking
FPSO, the second permanent unit at the field, is planned to be place in September and October. The first, scheduled for 27
launched this year, with a contract award in 2018. September, will offer 287 exploration blocks in 11 basins across
Another major pre-salt project involving an FPSO is Sépia, the country. The second and third bidding rounds, both sched-
where a 180,000b/d unit will be deployed. MODEC was revealed uled for 27 October, will offer eight pre-salt blocks. Petrobras
as the lowest bidder in May, having offered a day-rate of approxi- has already signaled its intention to bid for three such blocks
mately $720,000. An award is expected to be announced soon. and the local industry expects other IOCs to follow suit.
Meanwhile, a tender process for an FPSO for the Búzios
pre-salt field started during Q2 2017. Petrobras is understood Pietro Ferreira works as a regional
to have invited major floater specialists to bid for the field’s analyst at the Energy Industries
fifth FPSO, which will have oil and gas processing capaci- Council (EIC) regional office in Rio de
ties of 150,000 b/d and 6 MMcm/d, respectively. The bidding Janeiro, Brazil. He is a graduate in
deadline is 15 September. International Relations. His activities
Petrobras is also looking for two smaller production units to involve researching and analyzing project
replace existing semisubmersibles and FPSOs at the Marlim information on the South American
field in the Campos Basin. The company is seeking expressions energy market.
The drive toward digitalization isn’t just for the automotive industry. This year’s forum
discusses the use of smart tools, software, and automation technology to lower costs
and improve efficiency on FPSO projects from start to finish.
limen
Exhib tary
Hosted by: Sponsored by: Organized by: Produced By: it Hall
Acces
s To
Opera
shore Engineer tors
Solutions the environment, the material takes
PRODUCTS
NOV adds
new Lift Frame
National Oilwell Varco (NOV) has introduced a new
compensated coiled tubing lift frame (CCTLF) to
the Devin product line of intervention and stimula-
tion equipment.
The new CCTLF has been engineered to support
today’s ultra-deepwater string weight and enhance
operational performance. The lift frame provides a
designated work window between the topdrive and Inmarsat launches
landing string for subsea completion and interven- fourth satellite
tion activities. Weight is distributed evenly across Inmarsat has launched its fourth
the top section, down two legs, and back to center high-speed broadband communica-
at the bottom section, allowing for well center tions satellite, the Inmarsat-5 F4, in
rig-up of coiled tubing, wireline, and slickline. The its Global Xpress constellation. The
system can be rigged up both as a backup or pri- fourth satellite adds further capacity
mary compensator. to the GX network, as well as in-orbit
The new frame introduces a fully automated redundancy that further upgrades the
motion-compensation operating mode, which reliability and resilience of Inmarsat’s
includes auto-tide adjust with manual override service offerings. The other three satel-
capabilities, that eliminates the need for system lites in the constellation have been
adjustments once rigged up. Remotely operated delivering global coverage to users
hydraulic control systems yield increased safety on land, at sea and in the air since
and flexibility, while real-time system monitoring December 2015. Boeing has served as
via hand-held units provides system displays on the company’s satellite manufacturing
the rig floor and in the drill shack. Having access partner for the Global Xpress project;
to this data and understanding critical parameters SpaceX has been Inmarsat’s launch
enables rapid responses to potential problems. partner.
www.nov.com/CCTLF www.inmarsat.com
PRODUCTS
The circulating air is up to 60°F
cooler than ambient, keeping workers
cool even in oppressive environments,
the fi rm says. Durable, plasticized vests
are available in three sizes and pro-
vide continuous cooled or warmed air
through its perforated lining. They do
not restrict movement, do not absorb Delmar updates RAR Plus, MOORMax
sweat or other contaminants, and can Delmar Systems unveiled the new RAR Plus, a next generation rig anchor release
be worn under other protective cloth- (RAR), which adds key features such as a manual backup release method and in-
ing. Dual action PACs can easily switch creases the ultimate and release load ratings. The RAR Plus transmits both direct
from cold to hot, to provide comfort in and indirect line tension measurements from internal sensors for real-time display
all seasons, and amortize the invest- onboard the rig in a user-friendly graphical user interface.
ment in this PPE. The RAR Plus is a key component in the new Delmar MOOR-Max Releasable
www.vortec.com Mooring System, which Delmar says provides a revolutionary mooring system
for MODUs to avoid storms or improve rig move efficiency. The company said the
mooring system combines proven acoustic mooring release technology with ef-
ficient proprietary methods that come from over 40 years of rig move experience.
www.delmarus.com
GustoMSC offers
new jackup for wind installations
GustoMSC has debuted the NG-20000X, a self-propelled jackup design char-
acterized by a high variable load and large water-depth capability, offering a
new approach for wind turbines with capacities beyond 10MW. The NG-20000X
features a telescopic leg crane, which offers a hook height when extended of
1250-tonne at 160m, and offers an increased hoisting capacity when retracted
of 2500-tonne at 120m. The design addresses the spiraling trend of growing
Ampelmann designs
new gangway crane weights due to the increasing requirements related to the heavy founda-
Ampelmann released its latest gang- tions and high installation heights, while staying close to the proven design
way for personnel transfer: the A-type technology at the same time, said Jan-Mark Meeuwisse, commercial director,
Enhanced Performance (AEP). Now GustoMSC.
providing clients with 10% greater Based on GustoMSC’s leg encircling crane designs, the NG-20000X design
workability in sea states up to 4m offers a proven variable speed drive jacking system and a large unobstructed
significant wave height; the AEP also
deck area. Its variable load capacity of 16,500-ton allows the contractor to make
has the ability to use smaller vessels to
a roundtrip carrying six complete sets of wind turbine components with a tur-
obtain similar performance (compared
to current A-type). bine weight of 1000-ton, or carrying seven pieces of 900-ton jacket foundations,
The AEP features an advanced mo- optimizing the cost per installed turbine or foundation. www.gustomsc.com
tion compensation control system with
precision controls to enable fast landing
and comfortable people transfers. The
system significantly improves opera-
tional up-time on projects year-round
and provides benefits to operators in
rougher waters, including the North Sea
and the coasts of South America and the
Middle East.
The AEP can also be used to ensure
comparable workability on a relatively
small vessel, where bigger vessels
were needed before, saving cost for
Ampelmann’s client by allowing flex-
ibility in positioning on the vessel.
www.ampelmann.nl
Centrica, Bayerngas Norge GE, Baker Hughes Both companies have a long history
to form JV complete merger of collaboration, with TFKable be-
Centrica and Stadtwerke München GE Oil & Gas and Baker Hughes also ing JDR’s business partner providing
have agreed to combine Centrica’s completed their planned merger, which water blocked power cores for its cable
European oil and gas exploration and will create an entity that offers GE’s dig- and umbilical systems. JDR’s subsea
production business with Bayerngas ital solutions and Baker Hughes domain systems, used in the global offshore oil,
Norge. expertise as oilfield services provider. gas and renewable industries, allow its
The new joint venture company will The new company will trade under the customers to power and control their
be owned 69% by Centrica and 31% by stock symbol BHGE. offshore operations, and will enhance
Bayerngas Norge’s existing shareholders, “Disruptive change is the world’s the range of cable solutions TFKable
led by SWM and Bayerngas, and could new normal,” said Lorenzo Simonelli, can provide to its customers, the com-
ultimately be listed on the stock market. president and CEO of Baker Hughes, a pany said.
The JV will comprise Centrica’s assets GE company. “We created BHGE because The transaction, which is subject to
in the UK, Netherlands and Norway oil and gas customers need to withstand receipt of required regulatory approval
and Bayerngas Norge’s assets in the UK, volatility, work smarter, and bring and consents and other customary clos-
Norway and Denmark. energy to more people—and our offering ing conditions, is expected to close in
Once combined, the JV would have to them is now different than any other Q3 2017.
2016 year-end 2P reserves of 409 in the industry. Ours is a new company Meanwhile, JDR has officially opened
MMboe, 2016 year-end 2C resources that brings together over a century of a 4000sq m European service center in
of 216 MMboe (66% gas reserves) and experience and is built on invention, Newcastle upon Tyne, UK.
expected combined 2017 production execution and the quality of our people The new center aims to deliver greater
in the range 50-55 MMboe from 27 and culture.” service value for clients and facilitate
producing fields. The company’s assets continued growth.
will include a UK onshore terminal at TFKable to acquire JDR The multipurpose center includes a
Barrow-in-Furness. Global producer of wires and cables workshop, warehouse, visitor center
The deal, which is expected to realize Tele-fonika Kable (TFKable) will acquire and state-of-the-art offices. The facil-
cost savings of £100-150 million, is due subsea umbilicals and power cables sup- ity – which will house up to 50 staff
to close in Q4. plier JDR Cable Systems. – will also serve as the central base
® SUBSEA
COLLAPSIBLE FLUID
CONTAINMENT BLADDERS
IN SUPPORT OF: EXPLORATION • PIPELINES • DRILL RIGS
• BOP SKIDS • ACCUMULATORS • SUBMERSIBLES
GCE Subsea www.gcesubsea.no ........................... 46 Panoro Energy www.panoroenergy.com ............. 10 Yantai Raffles www.cimc-raffles.com .................. 14
Offshore Engineer
• Actionable Intelligence, on and
for the global offshore industry
SUBSCRIBE FAX or
visit us at
this form to
FOR FREE! +1 763.746.2785 www.oedigital.com
1. What is your main JOB FUNCTION (check one box only)
❑
❑
❑
50
51
52
Engineering
Exploration, Geology, Geophysics
Drilling, Production, Operations
❑
❑
❑
54
55
56
Field Operations
Consulting
HR, Staff Recruitment
YES! I would like a FREE subscription to OE
❑
How would you prefer to receive OE?
No thanks
S75OTC
What’s next
Coming up in OE September
• Feature – Subsea Processing
• EPIC – Asset Integrity
• Subsea – All-Electric Subsea &
Inspection, Repair, Maintenance
• Production – Heavy Oil
• Drilling & Completions –
Riserless Drilling
• Regional Overview – NW Europe Review
Bonus Distribution
SPE Offshore Europe
Aberdeen, UK
5-8 September 2017
Offshore Energy
Amsterdam, The Netherlands
9-11 October 2017
Ad Index
API API.org/Standards ........................................................................................................................ 4
Advertising sales
NORTH AMERICA
ATL Subsea atlinc.com ...................................................................................................................... 63 Audrey Leon
Phone: +1-713-874-2205
Balmoral balmoraloffshore.com ....................................................................................................... 27 aleon@atcomedia.com
March
Petroleum Exhibition & Conference of Mexico
An Event 13-15
Promoting new businesses,
operations and technologies
within Mexico's energy
2018
Parque Dora Mar
María,
Marí
and petroleum sectors.
Villahermosa, Tabasco,
T basc Mexico
Ta
PRESENTED BY ORGANIZED BY
Offshore Engineer Now more than ever PECOM, due to our long-standing relationship
with Tabasco’s government and business leaders, is your gateway
to Mexico’s energy industry. With Mexico’s state-owned oil
company Pemex announcing new partnership opportunities –
both onshore and offshore Tabasco – the time is right to share your
expertise and technology with PECOM’s attendees.
pecomexpo.com
We’re proud to have delivered a custom solution to BW Offshore that will help to
unlock the full value of this challenging development in the coming years.