PLANT NORTH

GEOGRAPHIC
N
NORTH 0°

PREVALING
22.377°

F/W DETAIL OF PFJ001 R/F DETAIL OF RFJ001 FOUNDATION CONCRETE QUANTITY


SUMMER WIND
S/W (SCALE: 1 : 25) (SCALE: 1 : 25) MATERIAL TOTAL QUANTITY [Cu. M]
270° 90° FOUNDATION CONCRETE 0.10

PREVALING
WINTER WIND
S/E
180° 1710-SS002I
PAVING CONCRETE QUANTITY
1 MATERIAL TOTAL QUANTITY [Cu. M]
PAVING CONCRETE 2.16

OF FDN. & PED.


300 800 300 GROUTING QUANTITY
= =
MATERIAL TOTAL QUANTITY [Cu. M]
450 GROUT 0.01
MK6-1Ø16
==
MK5-1Ø16 NOTES

300
FOUNDATIONS F/W-R/F TYPES 1) ALL DIMENSIONS ARE IN MILLIMETERS, ELEVATIONS & CO-ORDINATES ARE IN METERS.

OF PED.
F/W TYPE R/F TYPE QUANTITY 2) EL.100.000 = +23.00m ABOVE AVERAGE BALTIC SEA LEVEL IS REFERRED TO THE H.P.P (High Point Paving)
1710-SS002I

250
1 1 MK4-1Ø16 MK3-1Ø16 PFJ001 RFJ001 1
3) FOR GENERAL NOTES FOR CONCRETE WORKS REFER DWG. NO. 4124-AA-DX-200000001
450
==
B

- - MK3-1Ø16 MK4-1Ø16
4) BAR BENDING SCHEDULE IS INDICATIVE .CIVIL SUB-CONTRACTOR IS RESPONSIBLE FOR CHECKING
REBAR QUANTITIES & DIMENSION ACCORDING TO DRAWINGS.
FP-002A MK2-5Ø16@200
FPJ001
MK1-13Ø16@200
FOUNDATIONS TYPE SCHEDULE
RFJ001
ABJ001 ITEM TAG F/W TYPE R/F TYPE
3 3 3 3 1710-SS002I-PF001A PFJ001 RFJ001

E = 363.955
2300

1800

- FP-001A - - -
FPJ001
RFJ001
ABJ001
PEDESTAL F/W-R/F TYPES
F/W TYPE R/F TYPE QUANTITY

OF PED.
FPJ001 RFJ001 2
1710-SS002I

1 N = 315.375 1
= =
450
A

- -
250

PF-001A PEDESTAL TYPE SCHEDULE


300

PFJ001
ITEM TAG LxW [mm] F/W TYPE R/F TYPE
RFJ001
MK6-1Ø16 1710-SS002I-FP001A 450x450 FPJ001 RFJ001
450
MK5-1Ø16 1710-SS002I-FP002A 450x450 FPJ001 RFJ001
= =

ANCHOR BOLTS LAYOUT SCHEDULE


ANCHOR BOLTS LAYOUT TYPE QUANTITY NO. OF BOLTS
ABJ001 2 8

SECTION 1 SECTION 3
(SCALE: 1 : 25) - (SCALE: 1 : 25) - ANCHOR BOLTS QUANTITY
DIA. OF ANCHOR BOLTS NO. OF ANCHOR BOLTS BOLT LENGTH [mm]
M16 8 440

125
ANCHOR BOLTS TO BE INSTALLED
BEFORE CASTING OF FOUNDATION MK9-2Ø10@200
MK8-2Ø10@200
75(TYP.)
PRICE CODE
100.250 TOC 4 FOR PAVING R/F DETAIL 4 LIMITED SECTION EXCAVATION ABA02AC01/02/03
MK7
- 50(TYP.)
-
REF.RELEVANT PAVING DWG. (TYP.)
250

BACKFILLING FROM EXCAVATED MATERIAL & BORROW PIT ACA05AM01


100.000 HPP
VAPOUR BARRIER HEAVY DUTY POLYETHYLENE SHEET ADA16AB11
MK3 MK3 LEAN CONCRETE ADA08AA01
500

1 MK4 MK4 WATER PROOFING BY BITUMEN PAINT ADA16AA01


MK8-3Ø10 MK1 FORMWORK FOR FOUNDATION ADA09AA01
PROVIDE BASE SIMILAR TO BASE OF PAVING 1
(REFER 4124-AP-DC-200000000S01) 300 800 300 MK2 FOUNDATION CONCRETE ADA08AB03
= = PAVING CONCRETE AEA08AG01
SUPPLY AND INSTALLATION OF STEEL REBARS ADA10AA02
NON-SHRINK GROUT ADA12AB01
SUPPLY AND INSTALLATION OF ANCHOR BOLTS ADA11AA01/ADA11EA01

REFERENCE DRAWINGS
EQUIPMENT LAYOUT AMMONIA PROCESS AND UTILITIES PLANT, NITROGEN PLANT,
4124-XX-DE-217100001-IS03 DEMI WATER STORAGE & POLISHER, CENTRAL HEATING AND WINTERIZATION UNIT,
PLAN AT EL. 100.000 AND ABOVE
DETAIL OF ABJ001
(SCALE: 1 : 25) SECTION 4 4124-AA-DA-210000001S00 KEY PLAN PILES AND FOUNDATION LAYOUT PLANT 1 AMMONIA
(SCALE: 1 : 25) - 4124-AA-DX-200000001 CONCRETE WORKS GENERAL NOTES FOR CONCRETE WORKS

4124-AA-DX-200000002 CONCRETE WORKS STANDARD DETAIL OF ANCHOR BOLTS


OF PED. 4124-AI-DU-21710I002S01 SECONDARY STRUCTURE 1710-SS002I - PLAN , ELEVATION & SECTIONS
350
= = 4124-AP-DC-200000000S01 TYPICAL CONSTRUCTION DRAWING PAVING FOR EXTERNAL AREAS F/W & R/F DETAILS
100
MK8
= = R/F SHOULD BE
OF PED.

SYMMETRICAL
MK7-3Ø16

2 2
= =

= =
250

100

- -
UPDATE
MK9
AB-G 09Г2С-6-2a-M16-120-320

KEYPLAN

SECTION 2
(SCALE: 1 : 25) - BAR BENDING SCHEDULE - REINFORCEMENT TYPE RFJ001
BAR MARK QUANTITY BAR DIAMETER [mm] BAR LENGTH [mm] TOTAL BAR LENGTH [mm] a b c d e g SHAPE TOTAL WEIGHT [Kg]

MK1 13 16 2275 29575 0 300 475 760 475 0 46.73


P= 120

UP

UP
19350
UP

50 THK. CEMENT BASED


NON-SHRINK GROUT MK2 5 16 3845 19225 0 300 495 2290 495 0 30.38 UP

UP
SECONDARY STRUCTURE
100.250 TOC 1710-SS002I
UP

UP

MK3 2 16 2700 5400 0 2700 0 0 0 0 8.53

CABLETRAY

L
MK4 2 16 2435 4870 0 2435 0 0 0 0 7.69 DS DS
UP

DN
DS DS DS

LUBEOI L
L

MK5 2 16 1200 2400 0 1200 0 0 0 0 3.79 DS DS DS DS DS

UP

UP

MK6 2 16 935 1870 0 935 0 0 0 0 2.95 11-10


8-J
AI R P R EH E A T E R

MK7 6 16 1915 11490 240 620 330 620 240 0 18.15

MK8 7 10 1515 10605 90 350 350 350 350 90 6.58

MK9 4 10 510 2040 90 350 0 0 0 90 1.26

43 87475 126.07

REINFORCEMENT QUANTITY
BAR DIAMETER [mm] UNIT WEIGHT [Kg/m] TOTAL BAR LENGTH [mm] TOTAL WEIGHT [Kg]
10 0.62 17190 10.66 Isometric View 01 ISSUED FOR CONSTRUCTION 21-Oct-2021 S.Parulekar
P.Nair/
D.Pushkar
G.Girardi
16 1.58 74830 118.23 REV DATA PREPARED CHECKED APPROVED
DESCRIPTION -ОПИСАНИЕ
РЕД. ДАТА ПОДГОТОВИЛ ПРОВЕРИЛ УТВЕРДИЛ
92020 128.89

Tecnimont
This copy of this document is LLC Eurochem Northwest-2's property and its copyright is vested in Tecnimont Spa. This document contains confidential information and cannot be copied to or used
by any party for any purpose without Tecnimont’s Spa and LLC Eurochem Northwest-2’s prior written consent. Additional restrictions are as stated in the above confidentiality and export label, if any.

Настоящая копия документа является собственностью OOО "ЕвроХим-Северо-Запад-2”, и авторские права на него закреплены за АО «Текнимонт». Данный документ содержит
конфиденциальную информацию и не может копироваться или использоваться никакой другой стороной ни для каких целей без предварительного письменного согласия АО
«Текнимонт» и OOО "ЕвроХим-Северо-Запад-2”. Возможные дополнительные ограничения указаны выше в метке конфиденциальности.

TCM DOCUMENT No.: DOCUMENT No:


Текнимонт номер документа 4124-AA-DC-21710I002S01 ДОКУМЕНТ №:

- - - - - - OWNER:
ВЛАДЕЛЕЦ: LLC EUROCHEM NORTHWEST - 2

MODEL NAME: 4124-AA3D-1710-SS002I


- - - - - -
- - - - - - PROJECT:
ПРОЕКТ:
- - - - - - Ammonia and Urea Production, Kingisepp.
Изм.N Кол.уч. N Докум Лист Подпись Дата
REV. Num. count Doc. No Sheet Sign Date
Разработал ORIG. - - - - PLANT: Стадия Phase Лист Sheet Листов of
УСТАНОВКА: 3000 MTPD Ammonia
Проверил CHKD. - - - - LOCATION:
РАСПОЛОЖЕНИЕ:
Kingisepp - Russian Federation P 01 01
Утвердил APPR. - - - -
TITLE: SCALE:
НАИМЕНОВАНИЕ:
CONCRETE DRAWING МАСШТАБ:

A0 SHEET
F/W & R/F DETAIL OF FOUNDATION
FOR SECONDARY STRUCTURE 1130-SS002I 1:100