Main Equipments
Main Equipments
By
Mr.Don Bunnag
(Engineer level 9)
Tel. 02-590-5586
E-mail : don.b@pea.mail.go.th
Power Systems Standard Division, Engineering Department, PEA
LV CABLE
3
22 kV and 33 kV distribution system
22 kV system
22 kV
3-wire System
33 kV
4-wire System
Installation Standard
Cable Transformer
Insulator Surge
arrester
6
Insulator Installation
1. Pin type insulator
2. Line post type insulator
3. Pin post type insulator
4. Suspension type insulator
5. Polymer type insulator
7
PEA Engineering Criteria
Insulator The use of insulators By pollution (IEC 60815)
Pollution Pollution Creepage
Level ESDD Distance
(mm/kV)P-P
1. Light 0.03 - 0.06 16 mm/kV
2. Medium 0.10 - 0.20 20 mm/kV
3. Heavy 0.30 – 0.60 25 mm/kV
4. Very Heavy > 0.80 31 mm/kV 8
Insulator Application in 33 kV
16
Suspension Insulator Application in 33 kV
18
Cable Installation
Tie
Cable wire
Rack
22
Ruling Span of Bare Conductor
✓Distribution lines in Suburban ruling span shall not exceed the
described as show in table below :
✓Ruling span of distribution lines passing villages shall be 40, 80,
100 m according to a density of population in each area
23
Spaced Aerial Cable Installation Standard
1. Installation of space aerial cable on crossarm with insulator
24
Spaced Aerial Cable Installation
Spaced Aerial Cable Installation Standard
Standard
2. Installation of space aerial cable on aerial cable corner support
bracket with insulator
25
Spaced Aerial Cable Installation Standard
3. Installation of space aerial cable on aerial cable tangent support
bracket with cable spacer
50
26
Spaced Aerial Cable Installation Standard
4. Installation of space aerial cable on crossarm with cable spacer
50
27
Cable Spacer
Porcelain Polyethylene (PE)
28
TAC Installation Standard
TAC 240 mm2
LV cable 95 mm2
29
Switch
Installation
30
PEA Engineering Criteria
Automatic Circuit Reclosers
32
PEA Engineering Criteria
Dropout fuse cutouts
1. Installed on branch lines for a distance
exceeding 1 km and on sub-branch lines for a
distance exceeding 5 km
2. In case of branch lines not exceeding
1 km and sub-branch lines not exceeding 5 km
, Dropout fuse cutouts may be installed of
necessary such as there are tree near the33 line
PEA Engineering Criteria
Automatic load break switch (SF6)
1. Installed 2.5 sets on main feeder
(0.5 set mean tie line).
NO
Load break switch Installation
36
Load break switch Installation
Installed Surge arrester (SA)
37
38
Control cabinet
installation height of 3 m.
39
Ground of Precise and Thaimaxwell
Cabinet +VT
SW+SA
❑ Ground Isolation
40
Recloser Installation
42
43
44
45
Common Grounding
46
47
Any Question ?
Any Suggestion ?
48