Download as pdf or txt
Download as pdf or txt
You are on page 1of 38

OVERVIEW OF POLE SETTING

BY
CHANAPAT SAWANGSRI
ENGINEER OF H.V. DISTRIBUTION SYSTEM
CONSTRUCTION STANDARD SECTION
POWER SYSTEM STANDARD DIVISION 1
PRESENTATION OUTLINES
• POLE STANDARD

• POLE SETTING SUGGESTION

• POLE BURYING DEPTH

POWER SYSTEM STANDARD DIVISION 2


 POLE STANDARD

POWER SYSTEM STANDARD DIVISION 3


L.V. DISTRIBUTION SYSTEM

W.M.: 760 kg-m W.M.: 1,070 kg-m

1 Phase 3 Phase
POWER SYSTEM STANDARD DIVISION 4
L.V. DISTRIBUTION SYSTEM
✓8 m. concrete pole
For 1 phase 2 conductor or 3 conductor
with street light 1 circuit
✓9 m. concrete pole
For 3 phase 4 conductor
with street light 1 circuit
✓Normal Span 40 m.
POWER SYSTEM STANDARD DIVISION 5
M.V. DISTRIBUTION SYSTEM

✓ 12.00 m 1 Circuit : W.M. 2,550 kg-m , A= 2 m

✓ 12.20 m 1 or 2 Circuit : W.M. 5,900 kg-m , A= 2.2 m

H ✓ 14.00 m 2 Circuit : W.M. 3,590 kg-m , A= 2 m

✓ 14.30 m 2 or 3 Circuit : W.M. 9,000 kg-m , A= 2.3 m

A
POWER SYSTEM STANDARD DIVISION 6
CONCRETE POLE

POWER SYSTEM STANDARD DIVISION 7


 POLE SETTING SUGGESTION

POWER SYSTEM STANDARD DIVISION 8


✓AREA OF POLE SETTING
✓POLE FOUNDATION
✓SPAN OF POLE
✓POSITION OF POLE SETTING
✓ETC.

POWER SYSTEM STANDARD DIVISION 9


AREA OF POLE SETTING
TYPE OF SOIL

SOFT SOIL

HARD SOIL
NORMAL SOIL

POWER SYSTEM STANDARD DIVISION 10


AREA OF POLE SETTING

SHOULD MAKE FOUNDATION

POWER SYSTEM STANDARD DIVISION 11


POLE FOUNDATION

IN CASE SOFT SOIL


GENERAL

1:3:5

Concrete plate

POWER SYSTEM STANDARD DIVISION 12


SPAN OF POLE
✓Distribution lines in Suburb ruling span shall not exceed the
described as show in table below :
✓Ruling span of distribution lines passing villages shall be 40,
80, 100 m according to a density of population in each area

POWER SYSTEM STANDARD DIVISION 13


SPAN OF POLE

POWER SYSTEM STANDARD DIVISION 14


POSITION OF POLE SETTING

POWER SYSTEM STANDARD DIVISION 15


PROCEDURE OF POLE SETTING

cases 1
Narrow area or difficult area, cases 2
the machine can’t be operated. Easy access area, the machine
can be operated.

POWER SYSTEM STANDARD DIVISION 16


PROCEDURE OF POLE SETTING

POWER SYSTEM STANDARD DIVISION 17


PROCEDURE OF POLE SETTING
FOR DIFFICULT AREA

POWER SYSTEM STANDARD DIVISION 18


PROCEDURE OF POLE SETTING
FOR DIFFICULT AREA

POWER SYSTEM STANDARD DIVISION 19


PROCEDURE OF POLE SETTING
FOR DIFFICULT AREA

POWER SYSTEM STANDARD DIVISION 20


PROCEDURE OF POLE SETTING
FOR DIFFICULT AREA
ROPE

WOOD-RAKER TIMBER OR CONCRETE CLOCK


POWER SYSTEM STANDARD DIVISION 21
PROCEDURE OF POLE SETTING
FOR ACCESS AREA
STEP DRILL DIAMETER POLE SIZE
(cm.) (m.)
25 8.00 and 9.00
30 12.00 and 14.00
45 Stub, 12.20 and 14.30

POWER SYSTEM STANDARD DIVISION 22


PROCEDURE OF POLE SETTING
FOR DIFFICULT AREA

WIRE ROPE

POWER SYSTEM STANDARD DIVISION 23


PROCEDURE OF POLE SETTING
FOR ACCESS AREA

Tip

POWER SYSTEM STANDARD DIVISION 24


 POLE BURYING DEPTH

POWER SYSTEM STANDARD DIVISION 25


Classified soil conditions

Conditions Soil type Soil pressure


Soft soil conditions clay 1,700 kg/m2
Normal soil sandy 3,400 kg/m2
conditions
Hard soil conditions subsoil, laterite soil 6,800 kg/m2
and rock

POWER SYSTEM STANDARD DIVISION 26


POLE BURYING DEPTH
Normal soil conditions

Size of pole (meter) Burying depth (meter)


8 1.5
9 1.5
12 2
12.2 2.2
14 2
14.3 2.3
Bury depth
POWER SYSTEM STANDARD DIVISION 27
POLE BURYING DEPTH
Special conditions
Size of Minimum burying depth (meter)
pole Soft soil Normal soil Hard soil Very hard soil
(meter) (covered with
concrete)
8 1.5 1.3 1.1 1
9 1.5 1.3 1.1 1
12 2 1.8 1.6 1.2
14 2.3 2 1.7 1.2

POWER SYSTEM STANDARD DIVISION 28


POLE FOUNDATION FOR L.V.
8 m. and 9 m. POLE

POWER SYSTEM STANDARD DIVISION 29


POLE FOUNDATION FOR H.V.
12 m. POLE

POWER SYSTEM STANDARD DIVISION 30


Prestressed concrete stub
 Clay and  Raise the level
Swamp area

POWER SYSTEM STANDARD DIVISION 31


Prestressed concrete stub
IN CASE SOFT SOIL 1
SWAMP
can't separate between water and soils
2 3

POWER SYSTEM STANDARD DIVISION 32


Prestressed concrete stub
IN CASE SOFT SOIL
SWAMP
can separate between water and soils

POWER SYSTEM STANDARD DIVISION 33


CASE STUDY FOR
PRESTRESSED CONCRETE STUB
Stub Bolt 1

Stub Bolt 2

Stub Bolt 3

POWER SYSTEM STANDARD DIVISION 34


CASE STUDY FOR
PRESTRESSED CONCRETE STUB

Stub Bolt 1

Stub Bolt 2

Stub Bolt 3

POWER SYSTEM STANDARD DIVISION 35


Solve :
enclose the concrete
stub with concrete

POWER SYSTEM STANDARD DIVISION 36


Use the metal plates

POWER SYSTEM STANDARD DIVISION 37


POWER SYSTEM STANDARD DIVISION 38