1 Transformer
1. Bushing remove
(1) Loose and remove the nuts of remaining bolts of the HV adapter.
(2) Remove the bushing by a crane.
(3) Insert the removed bushing in the special stand. At this time, keep the bushing suspended by a crane
so that it does not fall over.
(4) Remove the gasket and save it.
1
2 1/8
Working process
Curing the hole of adapter
(Preparation of temporary cover)
Picture :
Cover of right face
Point
Cover the outside of the corner piece
写真
of the common base to close the hole
and prevent dust from entering inside
to the transformer
Working process
Curing the hole of adapter
(Preparation of temporary cover)
Picture :
Cover of back face
Point
写真 Cover the outside of the corner piece
of the common base to close the hole
and prevent dust from entering inside
to the transformer
Working process
Curing the hole of adapter
Picture :
Covering the hole of the adapter
Point
Cover the outside of the corner piece
写真
of the common base.
Cover
corner piece of
common base
2
3 2/8
Broken stud Working process
Grind the broken stud.
Picture :
Broken stud
Point
Scrape the surface flat with a grinder. A
写真
dent in the center of the stud is
permitted.
Picture :
Punch, jig
Point
Align the jig and the corner piece of the
写真
common base.
corner piece
of common
Punch
Working process
Punch
Punching with jig.
Picture :
Punch, jig, hammer
Point
Place the punch vertically in the hole of
写真
the jig, check that it is not tilted, and
then hit the punch with a hammer.
Jig
3
4 3/8
Working process
Punching with jig.
Punch Picture :
hole Jig
Point
Confirm that the punch is centered in
写真
the jig hole.
Working process
New stud bolt chamfering
Picture :
M20 stud bolt
Point
Chamfer the bottom corner of the stud
写真
bolt and prepare the edge before
welding.
Chamfering
Working process
Prepare cleaning clothes soaked in
water.
Picture :
Bucket, cleaning cloth, water
Point
Prepare before welding.
写真
4
5 4/8
Working process
Adjust the welding current using the
test sample.
Picture :
Test sample, welding rod and machine
Point
Visual check of welding bead condition.
写真
Test sample
Working process
Temporarily weld the punch center and
stud center together.
Picture :
Stud bolt, welding rod
Point
写真
Working process
After the temporary weld, check the
squareness of the stud bolt.
Picture :
Stud bolt, square
Point
After the temporary weld, place a
写真
square on the other side to check the
squareness.
5
6 5/8
Working process
Temporarily weld the stud bolt.
Picture :
Stud bolt, welding rod
Point
Temporarily weld the stud bolt on the
写真
other side.
Working process
After the temporary weld, check the
squareness of the stud bolt.
Picture :
Stud bolt, square
Point
Place a square to check the
写真
squareness again.
Working process
Temporarily weld the stud bolt.
Picture :
Stud bolt
Point
Temporary welding shall be performed
写真
in a cross shape.
6
7 6/8
Working process
Weld the stud bolt
Picture :
Stud bolt
Point
Weld the parts that have not been
写真
temporarily welded in four steps.
* After welding, apply a wet cleaning
cloth to the stud to cool it.
Working process
Weld the stud bolt while cooling with a
wet cleaning cloth.
Picture :
Stud bolt, wet cleaning cloth
Point
Squeeze the wet cleaning cloth lightly
写真
and apply it to the stud bolt.
* Cool the stud bolt to the point where
it does not feel hot to the touch.
Working process
Remove spatter and slag after welding.
Picture :
Stud bolt, chisel, hammer
Point
Remove spatter and slag cleanly.
写真
Chisel
7
8 7/8
Working process
After the welding, check the squareness
of the stud bolt.
Picture :
Stud bolt, square
Point
Place a square to check the
写真
squareness again.
Working process
Use a jig to check the welding condition
of the stud bolt.
Picture :
Stud bolt, jig
Point
Confirm all studs slide smoothly into
写真
the holes in the jig.
Working process
Repair if the stud bolt is tilted and does
not enter the jig smoothly
Picture :
Stud bolt, M20 nut, hammer
Point
写真 Hand-tighten the M20 nut onto the
stud bolt and straighten the stud bolt
by hitting the flat surface of the nut
with a hammer.
8
9 8/8
Working process
Torque inspection
Picture :
Square washer, M20 nut, M24 nut
Point
Insert the square washer and M24 nut
写真
into the stud bolt and tighten the M20
nut by hand.
Working process
Torque inspection
Picture :
Torque wrench with M20 socket
Point
Tighten the M20 nut with a torque
写真
wrench with the M20 socket and check
the torque value.
Torque value: 185N・m
After checking, loosen the nut and