Ensure both alignments (vertical & horizontal) are straight before energizing/ OK NG NA
Rectifier Input
V12 = ____________________________Vac
Rectifier Output
Command “Start” from mimic OK NG
Vdc = _____________________________V
Vbatt = _________________V
<Battery charger check>
3 Closed battery isolator/fuse. OK NG
Ibatt = __________________Amp
Idc = ___________________Amp
Inverter Output
V12 = ____________________________Vac
<Inverter check>
4 Command “Start” V23 = ____________________________Vac OK NG
V31 = ____________________________Vac
Freq = ____________________________Hz
Output (online)
L1 = ___________ KW S1 =__________KVA
L2 = ___________ KW S2 =__________KVA
L3 = ___________ KW S3 =__________KVA
Fuji CAC Joint Stock Company
Business office: 3E9 Tran Nao, Binh An ward, Thu Duc City, HCMC, Vietnam
• Tel + 84 28 37420959 (3 lines) Fax + 84 28 37420891
Bypass Input
V12 = ____________________________Vac
<Bypass circuit check>
V23 = ____________________________Vac
Switch on isolator Q4 OK NG
V31 = ____________________________Vac
Freq = ____________________________Hz
L2 = ____________KW S2=_________KVA
Carry out voltage monitoring at the output of UPS to check that there’s
no break in supply.
<Manual bypass test>
a) Command “ON MAINTENANCE BYPASS”
7 b) Switch on isolator Q6 OK NG
c) Battery isolator/fuse, Q1 and Q4 sequentially.
(Refer Risk control documet attached/ Tham khảo tài liệu kiểm soát rủi ro kèm theo)