Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

Check list for Industrial Projects

For submission of application for Terms of Reference

[TOR cases]

Provide authenticated (with stamp & Signature) hard copy of this check-list during

submission of hard copy of ToR application.

Sr. Information/Details Tick Page no. of


no. whichever is Application
applicable
1 All columns of Form 1 (As prescribed Yes (√) Page No. 1 to 11.
in EIA Notification 2006) properly
filled by Project proponent (PP). [All
pages signed by PP]

2 Documents related to Land Yes (√) Details are given in


ownership 5(f) formate
Included in Form-1

3 For 5 (f) category Yes (√) ---


• Project site is located
within GIDC
• If No, Compliance of
following conditions
 Water consumption < 25 --- ---
KLD
 Fuel Consumption <25 --- ---
MTPD
 Non-MAHUnit --- ---
3 Contact details provided Yes (√) Page No:-01 in Form-
I.
Mobile no. and e-Mail ID
included in Form-1
4 Format prescribed by SEAC [Salient Separately attached
features of the project] included with Yes (√) as 5(f) Format
application.

5 General Condition applicability. Project


site is not located within the 5 Km or 10 No (√) ---
km of the following as the case may be:
(1) Protected areas notified under the
Wildlife (Protection) Act,1972;
(2) CEPIareas
(3) Eco-sensitive areasand
(4) Inter-state boundaries and
international boundaries; are not
located within 5 km or 10 km(as
the case may be) area from the
boundary of the proposed site.

6 In case of Expansion, Compliance Yes (√) --


status of existing
unit is included in Format (as per Format)

7 Violation of EIA Notification 2006

Has any construction activity or project No (√) --


activity started?
If yes, details submitted in this --- ---
regard
8 Product profile with CAS no. / CI no. Yes (√) Attached as
Annexure-IV, Page
No. 15 to 25.
9 Raw Material details and Raw Material detail
manufacturing process of all products Yes (√) given in Annexure-
with CAS no. / CI no. V Page No. 26 to 50.
Manufacturing
Process is given in
Annexure-VI Page
No 51 to 219.
Spent Acids ( HCl etc.)generation. Detail attached as
10 Yes (√) Annexure – IX,
Page No. 231 to 233
If Yes, it is considered as Haz. Waste& --- ---
Submitted its management.
11 Details regarding Source of water, Water Yes (√) Source:-GIDC
balance included in Form-1 Water Balance:-
• Permission to obtain fresh water Annexure-VII Page
• Waste water management, No.220 to 229
• Applied for
• Membership certificate of Permission.
common facility,
• Permission letter for discharge of • Unit will obtain
waste water etc. membership of
CETP – Dahej.

12 Flue gas emission details Yes (√) Flue gas emission


Included in Form-1 details are given in
Annexure-X Page
No. 234
Process gas emission? Yes (√) Process gas
emission details are
If yes, Management details Yes (√) given in Annexure-
X Page No. 234.

13 Hazardous waste generation & its Yes (√) Details are given in
management Annexure-IX Page
No 231.

Spent solvent generation? Yes (√) Details are given in


14 Annexure-IX Page
No. 231.

If, yes Management of spent


solvent included in application? Yes (√)
15 Fugitive emissions? Separately attached
Yes (√) as 5(f) Format
If yes, details of its management
submitted. ---
16 VOC details included in Separately attached
Application? Yes (√) as 5(f) Format
If yes, details of its management Yes (√)
submitted.
Above details are true to the best of my knowledge and I am abided to respect the decision of the
SEIAA/SEAC if above information stands wrong in the future and also agree to initiated the legal
proceedings against my project.

Name & designation


of the Applicant: Mr Ravindra Yadav, ( Directors)

Stamp &Signature of Applicant:

Date:24/10/2019
FORM - 1
OF

M/s. NIGAM FINECHEM PVT. LTD.


FOR
MANUFACTURING OF
SYNTHETIC ORGANIC CHEMICALS
(API Intermediate)
NEW PROJECT

Plot No. D-2/CH/97-98, GIDC Industrial Estate, Dahej-II-


392220, Tal & Dist.: Bharuch Gujarat.
PREPARED BY

M/s. JYOTI OM CHEMICAL RESEARCH


CENTRE PRIVATE LIMITED
Shed No. K-1, 7705/2,3,4 GIDC ESTATE,
Ankleshwar-393002
Phone: +91 9824450384
Website:www.jyotiom.com
Email:info@jyotiom.com
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

BASIC INFORMATION

Sr. No. Item Details


1. Name of the Project M/s. Nigam Finechem Pvt. Ltd.
2. Sr. No. in the Schedule 5 (f)
3. Proposed capacity/ area/ length/ Total Production Capacity:- 98.75
tonnage to be handled/ command area/ MT/Month
lease area/ numbers of wells to be List of products is attached as
drilled ANNXURE 2
Plot Area:- 10000 Square Meter
4. New/ Expansion/ Modernization New Project
5. Existing Capacity/ Area etc. New
6. Category of the Project i.e. ‘A’ or ‘B’ Category B
7. Does it attract general conditions? If No
yes, please specify
8. Does it attract the specific condition? If No
yes, please specify
9. ♦ Location GIDC, Dahej-II
♦ Plot/ Survey/ Khasra No. Village Plot No.D-2/CH/97-98,
♦ Tehsil GIDC Industrial Estate,
♦ District Dahej-II-392220,
♦ Site Tal & Dist. Bharuch - Gujarat.
10. Nearest Railway Station/ Airport along Bharuch Railway Station– Approx-40 Km
with distance in Kms. Surat Airport- 123 kms
11. Nearest Town, City, District Bharuch – Approx. 40 Kms.
Headquarters along with distance in
Kms.
12. Village Panchayat, Zilla Parishad, Post Office: Dahej
Municipal Corporation, Local Body Tehsil: Vagra
(complete postal addresses with Dist.: Bharuch
telephone numbers to be given)
13. Name of the Applicant Mr. Ravindra Yadav
14. Registered Address Plot No.D-2/CH/97-98,
GIDC Industrial Estate,
Dahej-II-392220,
Tal & Dist. Bharuch - Gujarat.
15. Address for Correspondence: Name : Mr. Ravindra Yadav
Name: Proprietor
Designation (Owner/Partner/CEO): Add : E-52, Garden City, Ankleshwar –
Address: 393 002.
Pin Code: Email Add. ravi.nigamind@yahoo.com
E- mail: Contact No. 9227711771
Telephone No.:

1
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

16. Details of alternative sites examined, if No alternate site is examined.


any. Location of these sites should be
known on the Topo Sheet.
17. Interlinked Projects No
18. Whether second application of the Not Applicable
interlinked project has been submitted?
19. If yes, Date of submission Not Applicable
20. If no, Reason Not Applicable
21. Whether the proposal involves No
approval/clearance under: if yes, details
of the same and their status to be given.
♦ The Forest (Conservation) Act, 1980?
♦ The Wildlife (Protection) Act, 1972?
♦ Act, The C.R.Z Notification, 1991?
22. Whether there is any Government No, it is in GIDC Industrial Estate.
Order/ Policy relevant/ relating to the
site?
23. Forest Land involved (Hectares) No
24. Whether there is any litigation pending No
against the project and/ or land in
which the project is proposed to be set
up?
♦ Name of the Court
♦ Case No.
♦ Orders/ Directions of the Court, if any
and its relevance to the proposed
project

FORM – 1
(I) BASIC INFORMATION
1. Name of the project/s: M/s. Nigam Finechem Pvt. Ltd.
2. Location / site alternative under Plot No.D-2/CH/97-98,
consideration GIDC Industrial Estate,
Dahej-II-392220,
Tal & Dist. Bharuch - Gujarat.
3. Size of the project* List of Products is attached as ANNEXURE-
2
4. Expected Cost of the project 1220 Lacks
5. Contact Information List of Director is attached as ANNEXURE -3
6. E-mail ravi.nigamind@yahoo.com
Telephone No. 9227711771
7. Screening Category 5(f)- B (Due to Industry plot is in Industrial
Estate Dahej-II GIDC- Bharuch, Gujarat.

2
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

*Capacity corresponding to sectoral activity (such as production capacity for


manufacturing, mining lease area and production capacity for mineral production, area
for mineral exploration, length for linear transport infrastructure, generation capacity
for power generation etc.,)

(II) ACTIVITY
1. Construction, operation or decommissioning of the Project involving actions, which
will cause physical changes in the locality (topography, land use, changes in water
bodies, etc.)
Sr. Information / checklist Yes / Details there of (with approximate
No. conformation. No. quantities/ rates, wherever possible)
with source of information data.
1.1 Permanent or temporary change in land No New project: Project activity will be
use, land cover or topography carried out in the unit premises.
including increase in intensity of land
use (with respect to local land use
plan.)
1.2 Clearance of existing land, vegetation No Plots are already marked by GIDC
and buildings? Estate.
1.3 Creation of new land uses. No The project activity will be carried out
in industrial plot so there will be no
need to utilize of any new land.
1.4 Pre-construction investigations e.g. No Investigation is already done by GIDC.
bore house, soil testing?
1.5 Construction works? Yes There will be construction work related
to proposed plant as per plant design.
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction No Not Required
works or housing of construction
workers?
1.8 Above ground buildings, structures or Yes Plant Layout is attached as
earthworks including linear structures, ANNEXURE 3.
cut and fill or excavations.
1.9 Underground works including mining No No such underground activity will be
or tunneling? carried out.
1.10 Reclamation works? No Not required.
1.11 Dredging? No Not required.
1.12 Offshore structures? No Not required.
1.13 Production and manufacturing Yes product list & its capacity is attached as
processes? ANNEXURE-4. Raw Material list with
product is attached as ANNEXURE-5.
Manufacturing Process is attached as

3
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

ANNEXURE -6.
1.14 Facilities for storage of goods or Yes Proper facility for storage of raw
materials? material and finished goods will be
provided in the unit.
1.15 Facilities for treatment or disposal of Yes Unit will send treated effluent to CETP
solid waste or liquid effluents? Dahej. Details of treatment facility is
attached as ANNEXURE-7.
1.16 Facilities for long term housing of No Not required. Local people will be
operational workers? recruited during operation.
1.17 New road, rail or sea traffic during No The site is well connected to roadway.
construction or operation? No new road, rail or sea traffic
required. Movement of construction
material only by existing road of
industrial estate.
1.18 New road, rail, air waterborne or other No Not Applicable.
transport infrastructure including new
or altered routes and stations, ports,
airports etc?
1.19 Closure or diversion of existing No Proposed project is located in Notified
transport routes or infrastructure industrial area and there will be no
leading to changes in traffic closure or diversion of existing
movements? transport routes or infrastructure.
1.20 New or diverted transmission lines or No There will be no such change caused
pipelines? due to the project.
1.21 Impoundment, damming, culverting, No Not Applicable
realignment or other changes to the
hydrology of watercourses or aquifers?
1.22 Stream crossing? No No such activity is involved in the
project.
1.23 Abstraction or transfers of water form No No such activity will be involved. The
ground or surface waters? unit will use water from GIDC during
construction and operational phase.
1.24 Changes in water bodies or the land No There is no change in water bodies or
surface affecting drainage or run-off? the land surface affecting drainage or
run- off as project is in notified
industrial estate.
1.25 Transport of personnel or materials for Yes Existing infrastructure facilities will be
construction, operation or utilized for the transport of personnel/
decommissioning? materials for project.
1.26 Long-term dismantling or No No such activity is involved in the
decommissioning or restoration works? project.
1.27 Ongoing activity during No There will be no decommissioning
decommissioning which could have an activity for the project.
impact on the environment?
1.28 Influx of people to an area in either No Local man power will be employed.

4
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

Temporarily or permanently?
1.29 Introduction of alien species? No ------
1.30 Loss of native species or genetic No ------
diversity?
1.31 Any other actions? No ------
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in
short supply):
Sr. Information / Checklist Yes / Details thereof (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
2.1 Land especially undeveloped or No Project is located in Notified Industrial
agricultural land (ha) Area, GIDC Estate.
2.2 Water (expected source & competing Yes Details of Water Consumption and
users) unit: KL/Day Waste Water Generation are attached as
ANNEXURE-7.
2.3 Minerals (MT) Yes For construction: Minor minerals like
manufactured sand, Grit and pebbles
will be used.
2.4 Construction material – stone, Yes Unit will required Aggregates,
aggregates, sand / soil (expected source Cements, sand and Steel During
– MT) construction phase.
2.5 Forests and timber (source - MT) No No forest and timber products will be
used.
2.6 Energy including electricity and fuels Yes Detail of Energy and Fuel consumption
(source, competing users) Unit: fuel is attached as ANNEXURE – 8.
(MT),energy (MW)
2.7 Any other natural resources (use No Not applicable.
appropriate standard units)
3. Use, storage, transport, handling or production of substances or materials, which
could be harmful to human health or the environment or raise concerns about actual
or perceived risks to human health.
Sr. Information / Checklist Yes / Details there of (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
3.1 Use of substances or materials, which Yes The entire operation will be carried out
are hazardous (as per MSIHC rules) to in a closed system. Adequate
human health or the environment precautions shall be in place to prevent
(flora, fauna, and water supplies) and control any environmental impact
arising from any accidental spillage of
materials.
3.2 Changes in occurrence of disease or No Not Applicable
affect disease vectors (e.g. insect or
water borne diseases)
3.3 Affect the welfare of people e.g. by Yes The project will benefit the people

5
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

changing living conditions? living in the neighboring areas by


providing them with direct and indirect
employment opportunities associated
with the construction and operation of
the Project.
3.4 Vulnerable groups of people who could No Not Applicable
be affected by the project e.g. hospital
patients, children, the elderly etc.
3.5 Any other causes. No No other cause.
4. Production of solid wastes during construction or operation or decommissioning
(MT/month).
Sr. Information / Checklist Yes / Details thereof (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
4.1 Spoil, overburden or mine waste. No No mine waste / mine activity. No Over
burden soil. The excavated material,
during the foundation will be used for
filling.
4.2 Municipal waste (domestic and or Yes Office and Canteen waste will be
commercial wastes) collected and disposed as per MSW
rules.
4.3 Hazardous wastes (as per Hazardous Yes List of Hazardous Waste is enclosed as
Waste Management Rules) ANNEXURE- 9.
4.4 Other industrial process wastes Yes A detail of Industrial process waste is
attached as ANNEXURE-9.
4.5 Surplus product No No surplus product will be produced.
4.6 Sewage sludge or other sludge from Yes Sewage sludge will not be generated
effluent treatment. and sludge generated through ETP will
be sent to TSDF site for disposal.
4.7 Construction or demolition wastes Yes The construction debris from the
project site during construction phase
will be used for land filling materials.
4.8 Redundant machinery or equipment. No Not Applicable
4.9 Contaminated soils or other materials. No Not Applicable
4.10 Agricultural waste. No No agriculture waste will be generated.
4.11 Other solid wastes. No No other solid waste will be generated
from the project.
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
Sr. Information / Checklist Yes / Details thereof (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
5.1 Emissions from combustion of fossil Yes There may be an emission due to
fuels from stationary or mobile transportation. But it will be managed
sources. by following steps.

6
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

1) Proper maintenance of vehicles and


machines.
2) PUC certified vehicles will be
allowed for transportation.
Details of Flue Gas Emission are
attached as ANNEXURE-10.
5.2 Emissions from production processes. Yes Details of Process Emission are
attached as ANNEXURE-10.
5.3 Emissions from materials handling No Adequate measures will be taken to
including storage or transport. control emissions from material
handling including storage or transport.
5.4 Emissions from construction activities Yes Temporary in nature, which may
including plant and equipment. originate during construction of
building or roads, this will be taken
care by proper dust suppression by
sprinkling of water and providing PPE
to all workers.
5.5 Dust or odours from handling of Yes The project may cause rise in dust
materials including construction levels during construction phase.
materials, sewage and waste. Precautions would be taken to reduce
dust generation during construction
phase. Maximum use of RMC will
minimize the handling of cement, sand
and concrete thus dust emission will be
minimized. Water sprinkling will be
done at regular intervals to reduce the
air borne dust.
5.6 Emissions from incineration of waste. No Not Applicable
5.7 Emissions from burning of waste in No No burning activity will be carried out
open air (e.g. slash materials, in the unit.
construction debris)
5.8 Emission from any other sources. No
No other emissions from any other
source.
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Sr. Information / Checklist Yes / Details thereof (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
6.1 From operation of equipment e.g. Yes Maximum noise levels expected will be
engines, Ventilation plant, crushers. less than 75 dbA in day time at plant
boundary. The DG sets will be of
CPCB specifications.
6.2 From industrial or similar processes. No Adequate measures will be taken by the
unit.
6.3 From construction or demolition. No Adequate measures will be taken by the
unit.

7
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

6.4 From blasting or piling. NoNo blasting or piling operation


required.
6.5 From construction or operational Yes There will be temporary increase in
traffic. traffic during construction stage. As the
material is available locally and not
requires any stagnation of material or
vehicle stagnation.
6.6 From lighting or cooling systems. No Not Applicable.
6.7 From any other sources. No No emission from any other sources.
7. Risks of contamination of land or water from releases of pollutants into the ground
or into sewers, surface waters, groundwater, coastal waters or the sea:
Sr. Information / Checklist Yes / Details thereof (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
7.1 From handling, storage, use or spillage No All necessary safety measures will be
of hazardous materials. provided for handling, spillage and
storage of hazardous chemicals.
7.2 From discharge of sewage or other No No treated effluent or sewage will be
effluents to water or the land (expected disposed on land.
mode and place of discharge)
7.3 By deposition of pollutants emitted to No Not Applicable
air into the land or into water.
7.4 From any other sources. No Nil
7.5 Is there a risk of long term build up of No No pollutants will be built up in the
pollutants in the environment from Environment. Therefore no risk from
these sources? any sources.
8. Risk of accidents during construction or operation of the Project, which could affect
human health or the environment.
Sr. Information / Checklist Yes / Details thereof (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
8.1 From explosions, spillages, fires etc. Yes There will be chances of risk of
from storage, handling, use or accident from the proposed activity.
production of hazardous substances. Adequate control measures will be
provided. Proper on site and off site
emergency plans will be prepared.
Unit will be carried out each and every
activity in a safety manner.
8.2 From any other causes No No risk of accident from any other
causes. Adequate precautionary
measure will be taken by the unit.
8.3 Could the project be affected by natural Yes However, the unit will be designed and
disasters causing environmental constructed considering the impact of
damage (e.g. floods, earthquakes, floods, earthquakes etc.
landslides, cloudburst etc) ?

8
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

9. Factors which should be considered (such as consequential development) which


could lead to environmental effects or the potential for cumulative impacts with
other existing or planned activities in the locality.
Sr. Information / Checklist Yes / Details thereof (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
9.1 Lead to development of supporting
localities, ancillary development or
development stimulated by the project
which could have impact on the
environment e.g.:
• Supporting infrastructure (roads, Yes Will lead to development of nearby
power supply, waste or waste water areas by generating employment and
treatment, etc.) providing infrastructure.
• housing development
• extractive industries
• supply industries
• other
9.2 Lead to after – use of the site, which No There will be no significant impact on
could have an impact on the environment.
environment.
9.3 Set a precedent for later developments. No The Notified area is already well
developed.
9.4 Have a cumulative effect due to No There will be no cumulative effect from
proximity to other existing or planned the proposed project.
projects with similar effects.
(III) ENVIRONMENTAL SENSITIVITY.
Sr. Area. Name / Aerial distance (within 15 km.)
No. Identity Proposed project location
boundary.
1. Areas protected under international No It is fully developed GIDC estate
conventions, national or local Dahej.
legislation for their ecological,
landscape, cultural or other related
value.
2. Areas which are important or No The Narmada estuarine zone is
sensitive for ecological reasons - approximately 12 km away from
Wetlands, watercourses or other project site.
water bodies, coastal zone,
biospheres, mountains, forests.
3. Areas used by protected, important or No It is fully developed GIDC estate
sensitive species of flora or fauna for Dahej.
breeding, nesting, foraging, resting,
over wintering, migration.
4. Inland, coastal, marine or No It is fully developed GIDC estate

9
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

underground waters Dahej


5. State, National boundaries. No It is fully developed GIDC estate
Dahej.
6. Routes or facilities used by the public No It is fully developed GIDC estate
for access to recreation or other Dahej.
tourist, pilgrim areas.
7. Defense installations. No It is fully developed GIDC estate,
Dahej.
8. Densely populated or built – up area. No Bharuch City is Approx. 40 Km. away.
9. Areas occupied by sensitive man- Yes Academic institutes and hospital are
made land uses (hospitals, schools, approximate 7 km away from project
places of worship, community site.
facilities)
10. Areas containing important, high No It is fully developed GIDC estate,
quality or scare resources (ground Dahej.
water, surface resources, forestry,
agriculture, fisheries, tourism,
minerals)
11. Areas already subjected to pollution No Environment standards of GIDC
or Environmental damage. (those estate, Dahej are within the limits.
where existing legal environmental
standards are exceeded)
12. Areas susceptible to natural hazard No It is fully developed GIDC estate
which could cause the project to ,Dahej.
present environmental problems
(earthquakes, subsidence, landslides,
erosion, flooding or extreme or
adverse climatic conditions)

“I hereby given undertaking that the data and information given in the application
and enclosures are true to my best knowledge and belief and I am aware that if any
part of the data and information submitted is found to false or misleading at any
stage, the project will be rejected and clearance give, if any to the project will be
revoked at our risk and cost”.

Date: 24/10/2019 Mr. Ravindra P Yadav


Place: Dahej, Bharuch Signature of the applicant
With full Name and Full address

10
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ

(Project Proponent/ Authorized Signatory)


NOTE:
1. The projects involving clearance under Coastal Regulation Zone Notification, 1991
shall submit with the application a C.R.Z map duly demarcated by one of the
authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR)
and the recommendations of the State Coastal Zone Management Authority (at the
stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance
under the provisions of the C.R.Z Notification, 1991 for the activities to be located in
the CRZ.

2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere


Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit
the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis
the project location and there commendations or comments of the Chief Wildlife
Warden thereon (at the stage of EC).

3. All correspondence with the Ministry of Environment & Forest including submission
of application for TOR/Environmental Clearance, subsequent clarifications, as may be
required from time to time, participation in the EAC Meeting on behalf of the project
proponent shall be made by the authorized signatory for the specific project.

11
M/s. Jyoti Om Chemical Research Centre Pvt Ltd

You might also like