24 Oct 2019 170644960SN69SDOBChecklist&Form-1
24 Oct 2019 170644960SN69SDOBChecklist&Form-1
[TOR cases]
Provide authenticated (with stamp & Signature) hard copy of this check-list during
13 Hazardous waste generation & its Yes (√) Details are given in
management Annexure-IX Page
No 231.
Date:24/10/2019
FORM - 1
OF
BASIC INFORMATION
1
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
FORM – 1
(I) BASIC INFORMATION
1. Name of the project/s: M/s. Nigam Finechem Pvt. Ltd.
2. Location / site alternative under Plot No.D-2/CH/97-98,
consideration GIDC Industrial Estate,
Dahej-II-392220,
Tal & Dist. Bharuch - Gujarat.
3. Size of the project* List of Products is attached as ANNEXURE-
2
4. Expected Cost of the project 1220 Lacks
5. Contact Information List of Director is attached as ANNEXURE -3
6. E-mail ravi.nigamind@yahoo.com
Telephone No. 9227711771
7. Screening Category 5(f)- B (Due to Industry plot is in Industrial
Estate Dahej-II GIDC- Bharuch, Gujarat.
2
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
(II) ACTIVITY
1. Construction, operation or decommissioning of the Project involving actions, which
will cause physical changes in the locality (topography, land use, changes in water
bodies, etc.)
Sr. Information / checklist Yes / Details there of (with approximate
No. conformation. No. quantities/ rates, wherever possible)
with source of information data.
1.1 Permanent or temporary change in land No New project: Project activity will be
use, land cover or topography carried out in the unit premises.
including increase in intensity of land
use (with respect to local land use
plan.)
1.2 Clearance of existing land, vegetation No Plots are already marked by GIDC
and buildings? Estate.
1.3 Creation of new land uses. No The project activity will be carried out
in industrial plot so there will be no
need to utilize of any new land.
1.4 Pre-construction investigations e.g. No Investigation is already done by GIDC.
bore house, soil testing?
1.5 Construction works? Yes There will be construction work related
to proposed plant as per plant design.
1.6 Demolition works? No Not Applicable
1.7 Temporary sites used for construction No Not Required
works or housing of construction
workers?
1.8 Above ground buildings, structures or Yes Plant Layout is attached as
earthworks including linear structures, ANNEXURE 3.
cut and fill or excavations.
1.9 Underground works including mining No No such underground activity will be
or tunneling? carried out.
1.10 Reclamation works? No Not required.
1.11 Dredging? No Not required.
1.12 Offshore structures? No Not required.
1.13 Production and manufacturing Yes product list & its capacity is attached as
processes? ANNEXURE-4. Raw Material list with
product is attached as ANNEXURE-5.
Manufacturing Process is attached as
3
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
ANNEXURE -6.
1.14 Facilities for storage of goods or Yes Proper facility for storage of raw
materials? material and finished goods will be
provided in the unit.
1.15 Facilities for treatment or disposal of Yes Unit will send treated effluent to CETP
solid waste or liquid effluents? Dahej. Details of treatment facility is
attached as ANNEXURE-7.
1.16 Facilities for long term housing of No Not required. Local people will be
operational workers? recruited during operation.
1.17 New road, rail or sea traffic during No The site is well connected to roadway.
construction or operation? No new road, rail or sea traffic
required. Movement of construction
material only by existing road of
industrial estate.
1.18 New road, rail, air waterborne or other No Not Applicable.
transport infrastructure including new
or altered routes and stations, ports,
airports etc?
1.19 Closure or diversion of existing No Proposed project is located in Notified
transport routes or infrastructure industrial area and there will be no
leading to changes in traffic closure or diversion of existing
movements? transport routes or infrastructure.
1.20 New or diverted transmission lines or No There will be no such change caused
pipelines? due to the project.
1.21 Impoundment, damming, culverting, No Not Applicable
realignment or other changes to the
hydrology of watercourses or aquifers?
1.22 Stream crossing? No No such activity is involved in the
project.
1.23 Abstraction or transfers of water form No No such activity will be involved. The
ground or surface waters? unit will use water from GIDC during
construction and operational phase.
1.24 Changes in water bodies or the land No There is no change in water bodies or
surface affecting drainage or run-off? the land surface affecting drainage or
run- off as project is in notified
industrial estate.
1.25 Transport of personnel or materials for Yes Existing infrastructure facilities will be
construction, operation or utilized for the transport of personnel/
decommissioning? materials for project.
1.26 Long-term dismantling or No No such activity is involved in the
decommissioning or restoration works? project.
1.27 Ongoing activity during No There will be no decommissioning
decommissioning which could have an activity for the project.
impact on the environment?
1.28 Influx of people to an area in either No Local man power will be employed.
4
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
Temporarily or permanently?
1.29 Introduction of alien species? No ------
1.30 Loss of native species or genetic No ------
diversity?
1.31 Any other actions? No ------
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in
short supply):
Sr. Information / Checklist Yes / Details thereof (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
2.1 Land especially undeveloped or No Project is located in Notified Industrial
agricultural land (ha) Area, GIDC Estate.
2.2 Water (expected source & competing Yes Details of Water Consumption and
users) unit: KL/Day Waste Water Generation are attached as
ANNEXURE-7.
2.3 Minerals (MT) Yes For construction: Minor minerals like
manufactured sand, Grit and pebbles
will be used.
2.4 Construction material – stone, Yes Unit will required Aggregates,
aggregates, sand / soil (expected source Cements, sand and Steel During
– MT) construction phase.
2.5 Forests and timber (source - MT) No No forest and timber products will be
used.
2.6 Energy including electricity and fuels Yes Detail of Energy and Fuel consumption
(source, competing users) Unit: fuel is attached as ANNEXURE – 8.
(MT),energy (MW)
2.7 Any other natural resources (use No Not applicable.
appropriate standard units)
3. Use, storage, transport, handling or production of substances or materials, which
could be harmful to human health or the environment or raise concerns about actual
or perceived risks to human health.
Sr. Information / Checklist Yes / Details there of (with approximate
No. conformation. No. quantities / rates, wherever possible)
with source of information data.
3.1 Use of substances or materials, which Yes The entire operation will be carried out
are hazardous (as per MSIHC rules) to in a closed system. Adequate
human health or the environment precautions shall be in place to prevent
(flora, fauna, and water supplies) and control any environmental impact
arising from any accidental spillage of
materials.
3.2 Changes in occurrence of disease or No Not Applicable
affect disease vectors (e.g. insect or
water borne diseases)
3.3 Affect the welfare of people e.g. by Yes The project will benefit the people
5
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
6
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
7
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
8
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
9
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
“I hereby given undertaking that the data and information given in the application
and enclosures are true to my best knowledge and belief and I am aware that if any
part of the data and information submitted is found to false or misleading at any
stage, the project will be rejected and clearance give, if any to the project will be
revoked at our risk and cost”.
10
M/s. Jyoti Om Chemical Research Centre Pvt Ltd
M/s. NIGAM FINECHEM, GIDC ESTATE, DAHEJ
3. All correspondence with the Ministry of Environment & Forest including submission
of application for TOR/Environmental Clearance, subsequent clarifications, as may be
required from time to time, participation in the EAC Meeting on behalf of the project
proponent shall be made by the authorized signatory for the specific project.
11
M/s. Jyoti Om Chemical Research Centre Pvt Ltd