2'-4" 7'-2" 2'-4"

CONSULTANTS INC.

2'-4"

2'-4"
7'-2"

6'-6"

Roof
24' - 3"

7'-2"

7'-2"
6'-0"
6'-9"

2'-4"

2'-4"
Level 2
12' - 0"
2'-2"

2'-4" 7'-2" 2'-4"


9'-4"

GROUND FLOOR
LEVEL
0' - 0"
2'-4" 2'-4"

203 x 203 x46Kg/m STEEL H COLUMN


TO RECEIVE I-SECTION BEAMS

PROPOSED CORE FILL HCB WALL

12" x 12"x 5/8" Base plate welded to


Universal Column with 6mm fillet weld
11'-10" X 11'-10" X 1'-8" and fixed to R.C. column with 4# Grade
FOUNDATION 8.8 Anchor bolts
RAFT
203 X 102 X 23Kg/m H-SECTION
FOUNDATION
-5' - 0" 203 x 102 x 23Kg/m BEAM
R12 BARS @ 7" CTRS.
BOTH DIRECTION
25mm 25mm
25mm M 12 GRADE 8.8 BOLTS

2" THK. CEMENT/SAND 3"x 5"x 6mm STEEL PLATE TO


BLINDING 60mm FIX BEAM TO COLUMN
4" THK. COMPACTED 50mm
SANDFILL

3"x5" STEEL PLATE WELDED TO


ENDS OF C-SECTION TO FASTEN TO
COLUMN
203 x 203 x46Kg/m STEEL H COLUMN
TO RECEIVE I-SECTION BEAMS