IV PEKERJAAN PASANGAN
1 Pasang Bata ringan dinding dalam 7.5x20x60 m2 68.24 5.118 80% 4.094478 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
2 Pasang Bata ringan dinding samping 10x20x60 m2 100.48 8.613 80% 6.890189 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
3 Plester + aci m2 236.96 13.849 60% 8.309146 30% 20% 20% 20% 20% 20% 30% 20% 20% 20% 20% 20% 20%
Plester halus (sisi dalam) m2 0.000 0% 0
4 Facade Depan Ls 1.00 0.560 58% 0.322044 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
Sub Total IV 28.139 19.61586 90% 80% 80% 80% 80% 80% 90% 80% 80% 80% 80% 80% 80%
Type Prestasi Bobot BOBOT PERUNIT
Sat. BOBOT
No. Uraian Pekerjaan type 46 PEKERJAA
Minggu Minggu E1 NO.
N
lalu Lalu 1 2 3 5 6 7 8 9 10 11 12 15 16
V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan tebal 0,65 m2 57.34 6.423 90% 5.780552 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
2 Genteng Beton m2 57.34 4.189 85% 3.560485 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
3 Nok Beton m1 5.85 0.541 85% 0.460127 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
4 Ban-ban nok m1 22.28 0.239 85% 0.202911 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
5 talang jurai + seng + zinchromate m1 5.27 0.693 90% 0.623804 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
6 Listplank GRC 20cm m1 14.96 0.182 73% 0.132599 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
Sub Total V 12.267 10.76048
VI Pekerjaan Plafon
1 Plafond Gibsum Ex E-board/A Plus + Rangka hollow m2 33.41 2.474 53% 1.298629 0% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40%
2 Plafond Gypsum Ex E-board/A Plus 9 mm ( KM/WC 1) m2 1.82 0.135 0% 0 90% 85% 85% 85% 85% 85% 90% 85% 85% 85% 85% 85% 85%
3 Plafond GRC Rangka hollow : KM + Teras m2 8.98 0.665 0% 0 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
4 List Plafond kayu m1 53.60 0.470 73% 0.342131 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
Sub Total VI 3.743 1.64076
NO
URAIAN PEKERJAAN SAT
IX PEKERJAAN ASESORIES PINTU/JENDELA
1 Engsel Pintu ex. Siyota unit 11.00 0.589 0% 0 90% 90%
2 Handle & kunci pintu utama ex dekson unit 1.00 0.557 0% 0 90% 90%
3 Handle & Kunci Pintu Ex. clave/setara unit 4.00 0.604 0% 0 90% 90%
Sub Total IX 1.750 0% 0
X PEKERJAAN ELEKTRIKAL
1 Distribusi MCB + Arde ls 1.00 0.244 75% 0.182633 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%
2 Instalasi Penerangan titik 9.00 0.701 65% 0.455853 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
3 Instalasi Stop Kontak titik 8.00 0.740 65% 0.481178 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
4 Fitting Lampu SNI titik 9.00 0.105 0% 0 90% 90%
5 Saklar Tunggal SNI titik 4.00 0.070 0% 0 90% 90%
6 Saklar Double SNI titik 2.00 0.039 0% 0 90% 90%
7 Stop Kontak SNI titik 8.00 0.156 0% 0 90% 90%
Sub Total X 2.055 0% 1.119664
XIII PEKERJAAN PAGAR BELAKANG T = 1 M ( dinding samping & dinding belakang sharing )
1 Galian Tanah m3 0.46 0.025 90% 0.022083 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
2 Pondasi plat P2 m3 0.04 0.183 90% 0.164615 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
3 Cerucuk 1 pondasi 5 titik titik 5.00 0.000 0% 0
4 Sloof 15/20 m3 0.13 0.475 90% 0.427165 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
5 Kolom Praktis => uk. (13 x 13)cm m3 0.02 0.057 85% 0.048693 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
6 Kolom Pedestal uk 13 x 13 cm m3 0.01 0.026 90% 0.02363 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
7 Ring balok uk 13 x 15 cm m3 0.09 0.271 90% 0.24366 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
8 Pasang bata ringan 7.5x20x60 m2 4.72 0.354 80% 0.283445 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15% 15%
9 Plester Aci m2 4.72 0.299 56% 0.166369 0% 0% 0% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40%
10 Cat metrolite atau setara m2 4.72 0.041 0% 0 80% 35% 35% 35% 35% 35% 80% 35% 35% 35% 35% 35% 35%
Sub Total XIII 1.731 1.3796607 160% 115% 115% 155% 155% 155% 200% 155% 155% 155% 155% 155% 155%
Total ( I s/d XIII ) 100.000 7.250 6.400 6.400 6.800 6.800 7.000 7.650 7.000 6.800 6.800 6.800 6.800 6.800
Prestasi Bobot Bobot
Minggu Komulatif Koreksi
17 18 19 Minggu Ini Ini
14 15 16
0% 0% 0% 0% 0.000 0.257
15% 15% 15% 15% 0.037 0.207
15% 15% 15% 15% 0.022 0.124
15% 15% 15% 15% 0.032 0.182
15% 15% 15% 15% 0.018 0.099
15% 15% 15% 15% 0.041 0.232
75% 75% 75% 0.149 1.102
5% 5% 5% 5% 0.037 0.744
5% 5% 5% 5% 0.296 5.920
0% 0% 0% 0% 0.000 0.574
17% 17% 17% 17% 0.221 1.391
18% 18% 18% 18% 0.626 3.756
10% 10% 10% 10% 0.494 4.937
20% 20% 20% 20% 0.325 1.787
20% 20% 20% 20% 0.360 1.980
90% 90% 90% 84% 0.507 0.507
90% 90% 90% 84% 0.700 0.700
275% 275% 275% 3.566 22.296
5% 5% 5% 5% 0.321 6.102
10% 10% 10% 10% 0.419 3.979
10% 10% 10% 10% 0.054 0.514
10% 10% 10% 10% 0.024 0.227
5% 5% 5% 5% 0.035 0.658
10% 10% 10% 10% 0.018 0.151
0.871 11.631 0
Proyek : TELAGA
Kontraktor : PT. TRIMATRA BANGUN PERSADA
Pekerjaan : Pembangunan Rumah type 46( 6x12), Cluster BATUR Blok E1 No. 1,2,3,5,6,7,8,9,10,11,12,15,16,17,18 dan 19 ( 16 Unit )
Cluster : BATUR
Spk : 063-BSA/CTR-Telaga/V/2022
PRESTASI BOBOT
No. Uraian Pekerjaan BOBOT MINGGU MINGGU PRESTASI BOBOT BOBOT KOREKSI
LALU LALU MINGGU INI MINGGU INI KOMULATIF
VIII. PEKERJAAN KUSEN, DAUN PINTU & JENDELA 11.250 0.000 0.751
Juni'22
No. Uraian Pekerjaan BOBOT 6-12 13-19 20-26 27-3
1 2 3 4
0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052
1.563 1.563 1.563 1.563 1.563 1.563 1.563 1.563 1.563 1.563 1.563
0.932 0.932
3.454 5.018 5.018 4.602 4.602 4.602 7.412 7.968 6.436 6.436 4.045 4.045
4.336 9.353 14.371 18.973 23.575 28.177 35.589 43.557 49.993 56.429 60.474 64.519
ari & PT. Cahaya Subur Lestari
ALAN
Inspektor
er'22 Oktober'22 Nopember'22
26-2 3-9 10-16 17-23 24-30 31-6 7-13 14-20
17 18 19 20 21 22 23 24
0.749
4.1666667
0.932 0.932 0.932
Loman Hadi
Site Manager