Tagihan E1 29 Sept 2022
Tagihan E1 29 Sept 2022
Tagihan E1 29 Sept 2022
IV PEKERJAAN PASANGAN
1 Pasang Bata ringan dinding dalam 7.5x20x60 m2 68.24 5.118 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
2 Pasang Bata ringan dinding samping 10x20x60 m2 100.48 8.613 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
3 Plester + aci m2 236.96 13.849 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35%
Plester halus (sisi dalam) m2 0.000
4 Facade Depan Ls 1.00 0.560 80% 50% 50% 50% 50% 80% 50% 50% 50% 50% 50% 50% 50%
Sub Total IV 28.139 125% 95% 95% 95% 95% 125% 95% 95% 95% 95% 95% 95% 95%
Type Prestasi Bobot BOBOT PERUNIT
Sat. BOBOT
No. Uraian Pekerjaan type 46 PEKERJAA
Minggu Minggu E1 NO.
N
lalu Lalu 1 2 3 5 6 7 8 9 10 11 12 15 16
V PEKERJAAN ATAP
1 Rangka Atap Baja Ringan tebal 0,65 m2 57.34 6.423 67% 67% 67% 67% 67% 67% 67% 67% 67% 67% 67% 67% 67%
2 Genteng Beton m2 57.34 4.189 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
3 Nok Beton m1 5.85 0.541 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
4 Ban-ban nok m1 22.28 0.239 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
5 talang jurai + seng + zinchromate m1 5.27 0.693 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
6 Listplank GRC 20cm m1 14.96 0.182 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 35% 35%
Sub Total V 12.267
VI Pekerjaan Plafon
1 Plafond Gibsum Ex E-board/A Plus + Rangka hollow m2 33.41 2.474 85% 45% 45% 45% 45% 45% 45% 45% 45% 45% 45% 45% 45%
2 Plafond Gypsum Ex E-board/A Plus 9 mm ( KM/WC 1) m2 1.82 0.135
3 Plafond GRC Rangka hollow : KM + Teras m2 8.98 0.665
4 List Plafond kayu m1 53.60 0.470 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 35% 35%
Sub Total VI 3.743
NO
URAIAN PEKERJAAN SAT
IX PEKERJAAN ASESORIES PINTU/JENDELA
1 Engsel Pintu ex. Siyota unit 11.00 0.589
2 Handle & kunci pintu utama ex dekson unit 1.00 0.557
3 Handle & Kunci Pintu Ex. clave/setara unit 4.00 0.604
Sub Total IX 1.750
X PEKERJAAN ELEKTRIKAL
1 Distribusi MCB + Arde ls 1.00 0.244 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
2 Instalasi Penerangan titik 9.00 0.701 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
3 Instalasi Stop Kontak titik 8.00 0.740 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
4 Fitting Lampu SNI titik 9.00 0.105
5 Saklar Tunggal SNI titik 4.00 0.070
6 Saklar Double SNI titik 2.00 0.039
7 Stop Kontak SNI titik 8.00 0.156
Sub Total X 2.055
XIII PEKERJAAN PAGAR BELAKANG T = 1 M ( dinding samping & dinding belakang sharing )
1 Galian Tanah m3 0.46 0.025 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
2 Pondasi plat P2 m3 0.04 0.183 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40%
3 Cerucuk 1 pondasi 5 titik titik 5.00 0.000
4 Sloof 15/20 m3 0.13 0.475 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35%
5 Kolom Praktis => uk. (13 x 13)cm m3 0.02 0.057 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35%
6 Kolom Pedestal uk 13 x 13 cm m3 0.01 0.026 63% 63% 63% 63% 63% 63% 63% 63% 63% 63% 63% 63% 63%
7 Ring balok uk 13 x 15 cm m3 0.09 0.271 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90%
8 Pasang bata ringan 7.5x20x60 m2 4.72 0.354 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
9 Plester Aci m2 4.72 0.299 80% 80% 80% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
10 Cat metrolite atau setara m2 4.72 0.041
Sub Total XIII 1.731 513% 513% 513% 483% 483% 483% 483% 483% 483% 483% 483% 483% 483%
Total ( I s/d XIII ) 100.000 9.230 8.880 8.880 8.580 8.580 8.880 8.630 8.580 8.580 8.580 8.580 8.580 8.580
Prestasi Bobot Bobot
Minggu Komulatif Koreksi
17 18 19 Minggu Ini Ini
14 15 16
0% 0% 0% 0% 0.000 0.000
15% 15% 15% 15% 0.037 0.037
15% 15% 15% 15% 0.022 0.022
15% 15% 15% 15% 0.032 0.032
15% 15% 15% 15% 0.018 0.018
15% 15% 15% 15% 0.041 0.041
75% 75% 75% 0.149 0.149
5% 5% 5% 5% 0.020 0.020
0% 0% 0% 0% 0.000 0.000
90% 90% 90% 90% 0.107 0.107
15% 20% 20% 86% 0.038 0.038
110% 115% 115% 0.164 0.164
5% 5% 5% 5% 0.037 0.037
5% 5% 5% 5% 0.296 0.296
0% 0% 0% 0% 0.000 0.000
17% 17% 17% 17% 0.221 0.221
18% 18% 18% 18% 0.626 0.626
10% 10% 10% 10% 0.494 0.494
20% 20% 20% 20% 0.325 0.325
20% 20% 20% 20% 0.360 0.360
0% 0.000 0.000
0% 0.000 0.000
95% 95% 95% 2.359 2.359
5% 5% 5% 5% 0.256 0.256
5% 5% 5% 5% 0.431 0.431
35% 35% 35% 35% 4.847 4.847
0% 0.000 0.000
50% 80% 80% 58% 0.322 0.322
95% 125% 125% 5.856 5.856
Prestasi Bobot Bobot
Minggu Komulatif Koreksi
17 18 19 Minggu Ini Ini
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0% 0.000 0.000
0.000 0.000
Proyek : TELAGA
Kontraktor : PT. TRIMATRA BANGUN PERSADA
Pekerjaan : Pembangunan Rumah type 46( 6x12), Cluster BATUR Blok E1 No. 1,2,3,5,6,7,8,9,10,11,12,15,16,17,18 dan 19 ( 16 Unit )
Cluster : BATUR
Spk : 063-BSA/CTR-Telaga/V/2022
PRESTASI BOBOT
No. Uraian Pekerjaan BOBOT MINGGU MINGGU PRESTASI BOBOT BOBOT KOREKSI
LALU LALU MINGGU INI MINGGU INI KOMULATIF
VIII. PEKERJAAN KUSEN, DAUN PINTU & JENDELA 11.250 0.000 0.751
Juni'22
No. Uraian Pekerjaan BOBOT 6-12 13-19 20-26 27-3
1 2 3 4
0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052 0.052
1.563 1.563 1.563 1.563 1.563 1.563 1.563 1.563 1.563 1.563 1.563
0.932 0.932
3.454 5.018 5.018 4.602 4.602 4.602 7.412 7.968 6.436 6.436 4.045 4.045
4.336 9.353 14.371 18.973 23.575 28.177 35.589 43.557 49.993 56.429 60.474 64.519
ari & PT. Cahaya Subur Lestari
ALAN
Inspektor
er'22 Oktober'22 Nopember'22
26-2 3-9 10-16 17-23 24-30 31-6 7-13 14-20
17 18 19 20 21 22 23 24
0.749
4.1666667
0.932 0.932 0.932
Loman Hadi
Site Manager