Bright Future Ethiopia Development and Charity Association
MINI WASH (Wate Point 2) Construction Project
Daily Laborers Attendance And Payment Sheet For The Month Of September Previous Payemnt Date:__________________________ Current Payemnt Date:30/09/2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 S.N Name Type of Work Daily Wage 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Total 31 worked days Gross Pay Income Tax Net Pay Signature Water point 1 Daniel Lykun Construction 650 x x x x x x x 7 4,550.00 607.50 3,942.50 Water Point 2 Adugna Diriba Construction 450 x x x x x x x 7 3,150.00 330.00 2,820.00 Water Point 3 Shiferaw Taye Construction 450 x x x x x x x 7 3,150.00 330.00 2,820.00 Water Point 4 Minisha Mulu Construction 450 x x x x x x x 7 3,150.00 330.00 2,820.00 Water Point 5 Robi Negashu Construction 413 x x x x x x x 7 2,891.00 291.15 2,599.85 Total 16,891.00 1,888.65 15,002.35 Project/phase work summary(summary of change in the work) Previous work stage ___________________________ Previous work Status(figures) 0% Current work stage Excuted as per spe. &design Current work stage(figures) 100% Change in status(figures) 100% The Enginner/suppervisor comment on project/phase progress: Completed. Constructed as per the drawings and Specification. ______________________________________________________________________________________________________________________________________________________________________
Prepared by :Nantukina Teshome Checked by:Muluken Tsegaye Approved by:Selamu Nigussu
Construction works Engineer Accountant Projects Manager Signature:________________________ Signature:________________________ Signature:________________________ Date 30/09/2022 Date: 30/09/2022 Date:30/09/2022
Syed Hussein Alatas The Myth of The Lazy Native - A Study of The Image of The Malays, Filipinos and Javanese From The 16th To The 20th Century and Its Function in The Ideo