ACB-06 Logic Diagram

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

1 2 3 4 5 6 7 8

A PHLPTOC1 A
BLOCK OPERATE PHLPTOC1_OPERATE PHPTUV1
ENA_MULT START PHLPTOC1_START
BLOCK OPERATE PHPTUV1_OPERATE
START PHPTUV1_START

PHHPTOC1
BLOCK OPERATE PHHPTOC1_OPERATE PHPTUV2
ENA_MULT START PHHPTOC1_START
BLOCK OPERATE PHPTUV2_OPERATE
START PHPTUV2_START

PHHPTOC2
BLOCK OPERATE PHHPTOC2_OPERATE
ENA_MULT START PHHPTOC2_START PHPTUV3
B B
BLOCK OPERATE PHPTUV3_OPERATE
START PHPTUV3_START

PHIPTOC1
BLOCK OPERATE PHIPTOC1_OPERATE
ENA_MULT START PHIPTOC1_START

TCSSCBR1
BLOCK ALARM TCSSCBR1_ALARM

EFLPTOC1
C BLOCK OPERATE EFLPTOC1_OPERATE C
ENA_MULT START EFLPTOC1_START

NOT
EFLPTOC2 IN OUT

BLOCK OPERATE X110 (BIO).X110-SO4


ENA_MULT START

EFHPTOC1
BLOCK OPERATE EFHPTOC1_OPERATE
ENA_MULT START

D D

E E

Main Application: PROTECTION, Page: 1

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
1 / 16
1 2 3 4 5 6 7 8

A INCA_CLOSE BT_CLOSE EDG_CLOSE INCB_OPEN UNDERVOLTAGE_BYPASS A


X120 (AIM).X120-Input 1 X130 (AIM).X130-Input 4 X110 (BIO).X110-Input 6 X110 (BIO).X110-Input 5 X110 (BIO).X110-Input 2

INCA_OPEN ATS_MANUAL DGCP_OPEN


BT_CLOSE_PERMISSIVE
X120 (AIM).X120-Input 2 X110 (BIO).X110-Input 7 X110 (BIO).X110-Input 3
X110 (BIO).X110-Input 1
INCA_SERVICE DGCP_CLOSE
X120 (AIM).X120-Input 3 X110 (BIO).X110-Input 8 X110 (BIO).X110-Input 4

INCA_TEST
X120 (AIM).X120-Input 4

INCA_OPEN_PB
X130 (AIM).X130-Input 1

INCA_CLOSE_PB
B X130 (AIM).X130-Input 2 B

TRIP_INCA
X130 (AIM).X130-Input 3

INCA_OPEN
X110 (BIO).X110-SO1

OR
TRPPTRC1_TRIP B1 O
TRPPTRC2_TRIP B2
LEDS.Programmable LED 1
C C
TCSSCBR1_ALARM
LEDS.Programmable LED 7

PHIPTOC1_OPERATE
LEDS.Programmable LED 2 LEDS.Programmable LED 8

PHLPTOC1_OPERATE LEDS.Programmable LED 9

LEDS.Programmable LED 3

OR
EFLPTOC1_OPERATE B1 O
EFHPTOC1_OPERATE B2
LEDS.Programmable LED 4

D D

OR6
PHPTUV1_OPERATE B1 O
PHPTUV2_OPERATE B2
PHPTUV3_OPERATE B3 LEDS.Programmable LED 5

UNDERVOLTAGE_BYPASS
LEDS.Programmable LED 6

E E

Main Application: SIGNAL, Page: 1

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
2 / 16
1 2 3 4 5 6 7 8

A CBXCBR1 A
INCA_OPEN POSOPEN SELECTED
INCA_CLOSE POSCLOSE EXE_OP CBXCBR_EXE_OP
ENA_OPEN EXE_CL CBXCBR_EXE_CL
ENA_CLOSE OPENPOS
BLK_OPEN CLOSEPOS
BLK_CLOSE OKPOS
AU_OPEN OPEN_ENAD
AU_CLOSE CLOSE_ENAD
ITL_BYPASS

DCSXSWI1
B INCA_TEST POSOPEN OPENPOS B
INCA_SERVICE POSCLOSE CLOSEPOS
OKPOS

C C

OR6 AND
CBXCBR_EXE_OP B1 O B1 O
INCA_OPEN_PB B2 INCA_CLOSE B2
DGCP_OPEN B3 X100 (PSM).X100-PO3
TRIP_INCA B4

D D

E E

Main Application: CONTROL, Page: 1

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
3 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 2

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
4 / 16
1 2 3 4 5 6 7 8

A A

TRPPTRC1
OR6 OR6
BLOCK TRIP TRPPTRC1_TRIP
PHLPTOC1_OPERATE B1 O B1 O OPERATE CL_LKOUT
PHHPTOC1_OPERATE B2 B2 RST_LKOUT
PHHPTOC2_OPERATE B3 B3
PHIPTOC1_OPERATE B4 B4
EFLPTOC1_OPERATE B5 B5
EFHPTOC1_OPERATE B6 B6

PROTECTION TRIP X100 (PSM).X100-PO2

B B

OR NOT
INCA_TEST B1 O IN OUT
B2
UNDERVOLTAGE_BYPASS

TRPPTRC2
AND
OR6 BLOCK TRIP TRPPTRC2_TRIP
B1 O OPERATE CL_LKOUT
PHPTUV1_OPERATE B1 O B2 RST_LKOUT
PHPTUV2_OPERATE B2
C PHPTUV3_OPERATE B3 C

UNDERVOLTAGE TRIP X100 (PSM).X100-PO4

X100 (PSM).X100-SO2

D D

E E

Main Application: CONTROL, Page: 3

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
5 / 16
1 2 3 4 5 6 7 8

A A

AND6
INCA_SERVICE B1 O
NOT INCA_OPEN B2
UNDERVOLTAGE TRIP B3 X110 (BIO).X110-SO2
PROTECTION TRIP IN OUT B4

NOT
UNDERVOLTAGE TRIP IN OUT
AND
B INCA_SERVICE B1 O B
INCA_OPEN B2

AND6
AND6
B1 O
BT_CLOSE_PERMISSIVE B1 O B2
INCA_CLOSE_PB B2 B3
B4

B6

AND
BT_CLOSE B1 O
EDG_CLOSE B2 NOT
IN OUT

NOT
C C
PROTECTION TRIP IN OUT

OR6
AND6 B1 O
AND6 B2
B1 O B3 X100 (PSM).X100-PO1
B1 O BT_CLOSE_PERMISSIVE B2 B4
INCA_SERVICE B2 UNDERVOLTAGE_BYPASS B3
INCA_OPEN B3 INCA_CLOSE_PB B4
EDG_CLOSE B5
BT_CLOSE B6

D D

AND6 AND6
DGCP_CLOSE B1 O B1 O
NOT EDG_CLOSE B2 B2
BT_CLOSE B3 INCA_OPEN B3
UNDERVOLTAGE TRIP IN OUT INCB_OPEN B4 ATS_MANUAL B4
B5
INCA_SERVICE B6

NOT
E E
PROTECTION TRIP IN OUT

Main Application: CONTROL, Page: 4

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
6 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 5

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
7 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 6

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
8 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 7

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
9 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 8

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
10 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 9

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
11 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 10

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
12 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 11

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
13 / 16
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

Main Application: CONTROL, Page: 12

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
14 / 16
1 2 3 4 5 6 7 8

A A

AND6
B B
INCA_TEST B1 O
INCA_OPEN B2
INCA_CLOSE_PB B3 X100 (PSM).X100-SO1

C C

D D

E E

Main Application: CONTROL, Page: 13

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
15 / 16
1 2 3 4 5 6 7 8

A A
CMMXU1 RDRE
BLOCK HIGH_ALARM OR PHLPTOC1_OPERATE C1 TRIGGERED LED7_DR_TRIGGERED
HIGH_WARN PHIPTOC1_OPERATE C2
LOW_WARN EFLPTOC1_OPERATE B1 O C3
LOW_ALARM EFHPTOC1_OPERATE B2 C4
TCSSCBR1_ALARM C5
C6
C7
C8
OR6 C9
C10
VMMXU1 PHPTUV1_OPERATE B1 O C11
PHPTUV2_OPERATE B2 C12
BLOCK HIGH_ALARM PHPTUV3_OPERATE B3 C13
HIGH_WARN C14
LOW_WARN C15
LOW_ALARM C16
C17
B C18 B
C19
C20
PEMMXU1 C21
C22
RSTACM C23
C24
C25
C26
C27
C28
C29
FMMXU1 C30
C31
C32
C33
C34
C35
FLTMSTA C36
C37
BLOCK C38
C C39 C
C40
C41
C42
C43
C44
C45
C46
C47
C48
C49
C50
C51
C52
C53
C54
C55
C56
C57
C58
C59
D C60 D
C61
C62
C63
C64

E E

Main Application: MEASUREMENT, Page: 1

1 2 3 4 5 6 7 8
Project Responsible department Technical reference Document kind Doc. designation
Backup 2022 ABB Ltd. Graphical Application Configuration ACB06
Replacing Created by Title Document id.

Backup 2022.Power Station.MCC SWGR 236 - ES- 01 / 0.4 Kv. REF615


Approved by Rev. Rel. date Lang.
Rev. Modification Rel. date Created by Based on ACB_06 REF615 0 10/2/2021 en
16 / 16

You might also like