Project: BINO_HOTEL - Proposed Development Rubicon Innovative Engr Ltd (*189-5E9H-R3LH-NBPC)

FIRST FLOOR SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1

FIRST FLOOR SLAB ANALYSIS AND DESIGN REPORT

NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)

Material: C16/20 / Grade 380 (Type 2)

Slab Strip: X1 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 10.6Support As = 355.85/565.49 Top:Y12-200(T1)

S1 8 6.600 9225.00 0.0000 0.0000 274.2/565.49


97/150 4.000 4125.00 13.6 7.0 Bottom: Y12-200(B2)

Support Mc = 13.6Support As = 464.90/565.49 Top:Y12-200(T1)

Slab Strip: X3 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 13.6Support As = 464.90/565.49 Top:Y12-200(T1)

S3 4 6.600 9225.00 0.0000 0.0000 274.2/565.49


97/150 4.000 4125.00 10.8 7.0 Bottom: Y12-200(B2)

Support Mc = 10.8Support As = 363.48/565.49 Top:Y12-200(T1)

Slab Strip: Y3 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 11.2Support As = 328.98/565.49 Top:Y12-200(T1)

S3 4 6.600 4125.00 0.0000 0.0000 412.56/565.49


109/150 4.000 9225.00 14.6 13.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 37.84 < 44.97 *** Sufficient ***

Support Mc = 14.6Support As = 436.42/565.49 Top:Y12-200(T1)

S2 4 6.600 2217.50 0.0000 0.0000 274.2/565.49


109/150 4.000 16025.00 14.6 3.2 Bottom: Y12-200(B1)
Deflection Check: L/d = 20.34 < 52.0 *** Sufficient ***

Project: BINO_HOTEL
Project: BINO_HOTEL - Proposed Development Rubicon Innovative Engr Ltd (*189-5E9H-R3LH-NBPC)
FIRST FLOOR SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2

Support Mc = 2.4Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X5 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 9.1Support As = 301.50/565.49 Top:Y12-200(T1)

S5 4 6.600 4573.63 0.0000 0.0000 274.2/565.49


97/150 4.000 4125.00 14.7 8.1 Bottom: Y12-200(B2)

Support Mc = 14.7Support As = 508.97/565.49 Top:Y12-200(T1)

Slab Strip: Y5 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 8.6Support As = 282.74/565.49 Top:Y12-200(T1)

S5 4 6.600 4125.00 0.0000 0.0000 274.2/565.49


109/150 4.000 4573.58 12.6 8.8 Bottom: Y12-200(B1)
Deflection Check: L/d = 37.84 < 52.0 *** Sufficient ***

Support Mc = 12.6Support As = 426.35/565.49 Top:Y12-200(T1)

S4 1 6.600 4494.46 0.0000 0.0000 274.2/565.49


97/150 4.000 4468.94 12.6 8.1 Bottom: Y12-200(B2)

Support Mc = 6.9Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X8 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 14.7Support As = 508.97/565.49 Top:Y12-200(T1)

S8 4 6.600 7801.54 0.0000 0.0000 274.2/565.49


97/150 4.000 4125.00 9.6 7.2 Bottom: Y12-200(B2)

Support Mc = 9.6Support As = 318.89/565.49 Top:Y12-200(T1)

Slab Strip: Y8 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 11.6Support As = 341.41/565.49 Top:Y12-200(T1)

S8 4 6.600 4125.00 0.0000 0.0000 371.84/565.49


109/150 4.000 7801.42 13.2 12.6 Bottom: Y12-200(B1)
Deflection Check: L/d = 37.84 < 48.67 *** Sufficient ***

Project: BINO_HOTEL
Project: BINO_HOTEL - Proposed Development Rubicon Innovative Engr Ltd (*189-5E9H-R3LH-NBPC)
FIRST FLOOR SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3

Support Mc = 13.2Support As = 391.45/565.49 Top:Y12-200(T1)

S9 3 6.600 2217.50 0.0000 0.0000 274.2/565.49


109/150 4.000 4125.00 13.2 1.4 Bottom: Y12-200(B1)
Deflection Check: L/d = 20.34 < 52.0 *** Sufficient ***

Support Mc = 8.8Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X6 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 7.4Support As = 282.74/565.49 Top:Y12-200(T1)

S4 1 6.600 4572.17 0.0000 0.0000 274.2/565.49


97/150 4.000 4201.98 9.6 7.4 Bottom: Y12-200(B2)

Support Mc = 9.6Support As = 282.74/565.49 Top:Y12-200(T1)

S6 1 6.600 3677.83 0.0000 0.0000 274.2/565.49


109/150 4.000 8053.40 9.6 7.2 Bottom: Y12-200(B1)
Deflection Check: L/d = 33.74 < 52.0 *** Sufficient ***

Support Mc = 11.7Support As = 345.52/565.49 Top:Y12-200(T1)

Slab Strip: Y6 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 15.3Support As = 531.22/565.49 Top:Y12-200(T1)

S6 1 6.600 8053.40 0.0000 0.0000 274.2/565.49


97/150 4.000 3678.96 7.0 5.7 Bottom: Y12-200(B2)

Support Mc = 7.0Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X10 -- Storey: 1 (Finite Elm. Strip)


------------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 19.0Support As = 585.81/646.27 Top:Y12-175(T1)

S10 2 6.600 4125.00 0.0000 0.0000 384.68/565.49


109/150 4.000 9225.00 10.4 13.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 37.84 < 47.46 *** Sufficient ***

Support Mc = 10.4Support As = 305.05/565.49 Top:Y12-200(T1)

Slab Strip: Y10 -- Storey: 1 (Finite Elm. Strip)


------------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)

Project: BINO_HOTEL
Project: BINO_HOTEL - Proposed Development Rubicon Innovative Engr Ltd (*189-5E9H-R3LH-NBPC)
FIRST FLOOR SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-4

(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)


Support Mc = 8.8Support As = 291.64/565.49 Top:Y12-200(T1)

S10 2 6.600 9225.00 0.0000 0.0000 274.2/565.49


97/150 4.000 4125.00 10.9 6.3 Bottom: Y12-200(B2)

Support Mc = 10.9Support As = 321.27/565.49 Top:Y12-200(T1)

S11 4 6.600 3225.00 0.0000 0.0000 274.2/565.49


109/150 4.000 4125.00 10.9 5.9 Bottom: Y12-200(B1)
Deflection Check: L/d = 29.59 < 52.0 *** Sufficient ***

Support Mc = 7.1Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X7 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 2.8Support As = 282.74/565.49 Top:Y12-200(T1)

S7 4 6.600 2225.00 0.0000 0.0000 274.2/565.49


109/150 4.000 6614.10 9.6 3.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 20.41 < 52.0 *** Sufficient ***

Support Mc = 9.6Support As = 318.79/565.49 Top:Y12-200(T1)

S11 4 6.600 4125.00 0.0000 0.0000 274.2/565.49


97/150 4.000 3225.00 9.6 6.1 Bottom: Y12-200(B2)

Support Mc = 6.6Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y7 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 7.0Support As = 282.74/565.49 Top:Y12-200(T1)

S7 4 6.600 6614.10 0.0000 0.0000 274.2/565.49


97/150 4.000 2225.00 3.2 2.7 Bottom: Y12-200(B2)

Support Mc = 3.2Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: X2 -- Storey: 1 (Finite Elm. Strip)


-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 5.0Support As = 282.74/565.49 Top:Y12-200(T1)

S2 4 6.600 16025.00 0.0000 0.0000 274.2/565.49


97/150 4.000 2217.50 7.4 2.9 Bottom: Y12-200(B2)

Support Mc = 7.4Support As = 282.74/565.49 Top:Y12-200(T1)

Slab Strip: Y1 -- Storey: 1 (Finite Elm. Strip)

Project: BINO_HOTEL
Project: BINO_HOTEL - Proposed Development Rubicon Innovative Engr Ltd (*189-5E9H-R3LH-NBPC)
FIRST FLOOR SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-5

-----------------------------------------------

TYPE g L1 C-sup C-span As


Slab d/h q L2 M-sup M-span Req/Prov S T E E L B A R S
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
(mm) (kN/m2) (mm) (kN.m) (kN.m) (mm2)
Support Mc = 10.9Support As = 319.27/565.49 Top:Y12-200(T1)

S1 8 6.600 4125.00 0.0000 0.0000 398.47/565.49


109/150 4.000 9225.00 14.3 13.4 Bottom: Y12-200(B1)
Deflection Check: L/d = 37.84 < 46.21 *** Sufficient ***

Support Mc = 14.3Support As = 426.30/565.49 Top:Y12-200(T1)

S2 4 6.600 2217.50 0.0000 0.0000 274.2/565.49


109/150 4.000 16025.00 14.3 3.0 Bottom: Y12-200(B1)
Deflection Check: L/d = 20.34 < 52.0 *** Sufficient ***

Support Mc = 2.9Support As = 282.74/565.49 Top:Y12-200(T1)