RISK ASSESSMENT & METHOD STATEMENT (RAMS)

TEMPLATE
1. METHOD STATEMENT

Company Name ABRAS STEEL NIG ENT LTD

Address Suite 4, LSDPC HOUSE, Ile Logo Street Surulere, Lagos.

Work Location Snack, Agbara plant.

Start Date 20/07/2022 Completion Date 30/07/2022

TITLE OF WORK/PROJECT

Roof Maintenance, Agbara.

STATE THE WORKS, TASK OR PROCESS INVINVOLVINV.


1 Arrangement of material
2 Removing
3 Erection
4 Installation
5 Clearing

DESCRIPTION OF WORK ACTIVITIES (STEP-BY-STEP SEQUENCE) AS INDICATED ABOVE


1. Arrangement of materials and tools to the job location
2. Removing damaged roofing part
3. Erection of scaffold
4. Installation of new part and sealing of edges using silicon
5. Clearing and carting away offcuts and damaged roofing part (housing keeping)

EQUIPMENT AND PROCEDURES (indicate N/A where not applicable)

Plant & Tools Drilling, cutting, and fastening using screws


(List them)

PPE required
(List them) Hard hat, gloves, polarized google, boots, Harness belt, and reflective jacket etc.
Materials &
substances
(List them) Aluminum sheet
Flash band
Silicon

Trades/Craft Men
(List them) Roofer
Helper

Specific Training Trade test


needed (List them)

Permits to Work General work permit


(List them) Hot work
Work at height

Machinery Shutdown Nill


and Lock-Off
Procedures

Is Electricity needed Yes

Mobile Phone use – 08026868280


any Restricted Areas

Means of protection Yes, all PPE


to others (List them)
Work Site Access and Yes
Egress

Access to Works Yes


Area/Location

Means of Access to Yes


Height (List them)

Fall Prevention Yes


Measures (Work at
height)

COSHH Assessment

Welfare Yes
Arrangements

Traffic Management Nill


in Place

First Aid & Medical Yes, FMN


Facilities

Emergency Response Yes, FMN


Plan

Site Contact Details 07064448538


(Supervisors & Safety 08082469386
Officer) 09087205736
ISSUED TO: Please supply names of key personnel in the table

S/N Names Signature Date

1. Abdulahi Rasaq Abiodun 20/07/22

2. Adeoye ojo 20/07/22

3. Moshud Adisa 20/07/22

4. Moshood Sabur 20/07/22

5. Onafowokan Fuad 20/07/22

6. Adam Sunday 20/07/22

2. Risk Assessment Form

Location Activity
Snacks, Agbara plant. Roof maintenance.

Issue
Leaking Roof

Activity Hazard Risks Risk Control Measures Revised


State the step Something with Effects and Harms Rating Provide details of control risk rating
of the activity the potential to H, M, L measures already in place.
as contained harm: hazards If measures are detailed in H, M, L
Indicate
in the listed should be the rating other documents, state Indicate
method all those present prior to where.     the rating
statement before controls controls if controls
are in place.   being in are
place implemen
ted
RR
RRR
Arrangement 1. Unkempt 1. Injury to the body 1. All materials or roll should
of materials materials, uneven because of slips trips be kept properly and free
and tools to ground and falls. from walkways at the job
the job 2. Forklift location
2. Being struck by
location. movement and 2. Employees to always use Low
trucks/forklifts,
falling objects the designated walkway
resulting to injury to Medium
3. Poor Manual 3. Ensure proper manual
feet or Fatality
handling handling techniques using
3.Muscular skeletal trolley and the use of
disorder (MSDs), appropriate PPE's

Removing 1. Falling roof or 1. Employee may 1. Trained employee should


damaged object from height have head injury be use on the job
roofing part from falling object 2. Secure the ladder by tying
2. Loosing
the top of the ladder to the
awareness of the 2. Falling from height
roof if practical.
edge on misalign resulting to death
3. Follow all necessary safety
purlin on the roof 3. Laceration or cut High precautions by evacuating all
3. Sharp edge from on the hand potential equipment that can Low
metal plate 4. Falls from ladders damage or effect worker
4. Ladder not can result in serious 4. Ensure the weather is
properly position to injuries, favourable before working on
reach height hospitalisations and a roof
death.

Erection of 1. Struck by falling 1. Object falling from 1. Mind Load Limits


scaffold object or material height may result to 2. Inspect Scaffolding
head injury or even Materials and install handrail
2. Scaffold collapse death on scaffold
2. Collapsing of 3. Inspect the site and use
3. Weak Planking
scaffold and weak proper safety PPE
planking may
High 4. Keep Vehicles, forklift and Low
resulting to
Heavy Equipment Clear
dislocation or fatality

Installation of 1. Falling of heavy 1. Heavy 1. Ensure correct lifting


new part and equipment or object load/equipment equipment to be use
sealing of edges falling from height 2. The use of appropriate PPE
2. Inhalation of
using silicon may result to neck such as face nose mask be
chemical during
injury or even death worn
sealing
3. Ensure all trip hazard are
2. Employee may High Low
eliminated during lifting or
have lungs or skin
installation of machine part
problem resulting
4. Competent employee must
from the silicon used
be engaged
Clearing and 1. Sharp edge from Worker may have 1. Ensue worker use PPE such
carting away offcut roofing sheet dislocation, ankle as hand gloves for removing
offcuts and of offcut material
2. Metal roll and tools problem when they
damaged step on roll or tools 2. Trolley should be used to
on left on the floor
roofing part and laceration on the High transport equipment back to Low
(housing hand during sorting/ store
keeping) removing of offcut on 3. Area should be barricade to
job site stop other fellow from coming
into the site
4. Remove items on walkways
for easily flow of movement

Declaration
Supervisor and safety personnel should monitor and review the application of the specified controls.

Prepared by Date
Abdulahi Rasaq Abiodun 20/07/2022

Approved by Date

I certify that all controls are in place which reduces risk to as low as is reasonably practicable, all workers have
been informed and safe systems of work have been applied.

Risk Rating Guidance

Risk rating Action Required

High Immediate action required


For example,
 Fatality possible to one or more individuals however infrequent
 Major injury to few individuals occurring frequently
 Likelihood of long term muscular-skeletal problems affecting
significant numbers of workers
Medium Requires attention as soon as
For example, possible
 Major injury to one/few individuals occurring infrequently
Likelihood of long term muscular-skeletal problems affecting some
workers
Low Not a priority, but may need
For example, minor injury occurring infrequently to few staff. attention to prevent future
and long-term consequence