PRECAST CONCRETE

z PRECAST
SLAB
PEMBAGIAN TIPE UKURAN HALF SLAB
Keterangan :
Elemen Beton Pracetak
PEKERJAAN PEMBESIAN HALF SLAB

SEAL CONNECTOR OVER LAP


PEKERJAAN PENGECORAN HALF SLAB

HALF SLAB

HALF SLAB

HALF SLAB
PEKERJAAN PENGANGKATAN HALF SLAB

HALF SLAB

HALF SLAB
HALF SLAB
HALF SLAB
HALF SLAB

HALF SLAB
PEKERJAAN PEMASANGAN HALF SLAB

Mobilisasi Elemen Penumpukan Pengangkatan Ereksi / perakitan

Penyambungan antar elemen Penulangan beton In-situ (Topping) Pengecoran In-Situ (Topping) Finishing
PEKERJAAN PENULANGAN HALF SLAB
PEKERJAAN PENULANGAN HALF SLAB
DESIGN OF PRECAST COMPONENT

FRAMING DIMENSION / SPAN TO DEPTH RATIO

LOAD COMBINATION

PRECAST COMPONENT ANALYSIS

CONNECTION CONCEPTS

DRAWING PRECAST COMPONENT

MECHANISM TO ACCOMODATE
PRELIMINARY DESIGN / SPAN TO DEPTH RATIO

• PCI Design Handbook • SNI 7833-2012

IPITS 2015 10
PRELIMINARY DESIGN

IPITS 2015 10
LOAD COMBINATION (FOR GENERAL BUILDING)

IPITS 2015 10
PRECAST COMPONENT ANALYSIS (FLEXTURE)

IPITS 2015 10
PRECAST COMPONENT ANALYSIS (FLEXTURE)

IPITS 2015 10
PRECAST COMPONENT ANALYSIS (FLEXTURE)

Possible failure modes depend from short to long


spans respectively :

Bearing Shear Flextural Deflection Handling


Capacity Capacity Capacity Limits Restriction

IPITS 2015 10
PRECAST SLAB COMPONENT REINFORCEMENT

IPITS 2015 10
PRECAST SLAB COMPONENT

IPITS 2015 10
PRECAST SOLID SLAB COMPONENT

Precast Solid Slab Thickness of precast


Total depth of the
used as permanent solid slab usually
complete floor
formwork for an in between 65mm to
usually is between
situ concrete 100mm, depending
150mm to 250mm
topping on the span

IPITS 2015 10
DEFLECTION CONTROL

IPITS 2015 10
PENULANGAN PELAT PRACETAK

Kondisi Sebelum Kondisi Setelah


Kondisi Saat Komposit Komposit
Pengangkatan ( Instalasi + Pengecoran) (Beban Operasional Bekerja)

PCI Design
Handbook 7th
Edition Ch. 8

IPITS 2015 10
URUTAN KONTROL PELAT PRECAST

Casting Pelat • Penulangan Pelat


Precast Precast

Pengangkatan • Beban : Berat Sendiri


Pelat Precast • Tumpuan : Titik angkat

Penumpukan • Beban : Berat Sendiri + Pekerja


Pelat Precast • Tumpuan : Penyangga pelat

Instalasi Pelat • Beban : Berat Sendiri + Pekerja


Precast • Tumpuan : Dua tumpuan

• Beban : Berat Sediri + Berat cor insitu +


Pengecoran Pekerja
Pelat Insitu
• Tumpuan : dua tumpuan kanan kiri

IPITS 2015 10