Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

LIST OF CIP'S

Date of
Sr. No. SHOP OPERATION NECESSITY IMPROVEMENT DESCRIPTION Start date
Completion

NEW SOFTWARE AND FIXTURE


1 2.2LTR WEIGHT GRADING MANUAL TO AUTO AUTO WEIGHT GRADING IMPLEMENTED DEVELEOPED FOR AUTO WEIGHT 10.07.2020 12.08.2020
GRADING

BOLT HOLE FACE OUT AIR JETS ARE PROVIDED FOR RESTING
2 2.2LTR BOLT HOLE DRILLING
COMPLAINT
RESTING CONFIRMATION PROVIDED
CONFIRMATION
12.09.2020 26.09.2021

PNEUMATIC CYLINDER IS PROVIDED FOR


3 2.2LTR OIL HOLE DRILLING MANUAL TO ATO CLAMPING FIXTURE MODIFIED
AUTO CLAMPING
16.09.2020 17.10.2020

METAL TO METAL CONTACT TROLLEYS ARE REPLACED WITH


4 ISUZU/2.2LTR MANUAFACTURING LINE
CAUSES DAMAGE
CONVEYOR PROVIDED
CONVEYOR
18.10.2020 22.11.2020

GRINDING DUST CAUSING DUST COLLECTOR IS PROVIDED TO


5 ISUZU/2.2LTR ROUGH GRINDING
HAZARD TO OPERATOR
DUST COLLECTOR PROVIDED
ELIMINATE HAZARD
11.11.2020 12.12.2020

WASHING REPLACED
6 ISUZU/2.2LTR WITH ULTRASONIC CONVENTIONAL TO ULTRASONIC ULTRASONIC WASHING PROVIDED ULTRASONIC WASHING IMPLEMENTED 10.12.2020 15.01.2021
WASHING

COMPONENT RESJECTED DUE TO AIR JET IS PROVIDED FOR RESTING


7 ISUZU/2.2LTR SE BORING
IMPROPER RESTING
RESTING CONFIRMATION PROVIDED
CONFIRMATION
10.01.2021 16.02.2021

SMALL END BORE OVERSIZE JOB SMALL END BORE OVERSIZE DETECTION AIR JETS ARE PROVIDED FOR SMALL
8 ISUZU/2.2LTR BOLT HOLE DRILLING
GET MACHINED PROVIDED END OVERSIZE DETETCTION
14.02.2021 15.03.2021

WITHOUT OIL HOLE JOBS GETS AIR JETS ARE PROVIDED FOR OIL HOLE
9 ISUZU/2.2LTR NUMBERING
MACHINE
OIL HOLE DETECTION PROVIDED
DETECTION
14.03.2021 16.04.2021

REJECTION DUE TO IMPROPER AIR JETS ARE PROVIDED FOR RESTING


10 2.2LTR BE FINISH BORING
RESTING
RESTING CONFIRMATION PROVIDED
CONFIRMATION
14.04.2021 12.05.2021

REJECTION DUE TO WRONG SIDE PINS ARE PROVIDED FOR WRONG


11 2.2LTR NOTCH MILLING
LOADING
WRONG SIDE LOADING DETECTION PROVIDED
LOADING PREVENTION
26.05.2021 14.06.2021

NUMBER MARKING NOT DONE


AIR JET IS PROVIDED TO CLEAN
12 ISUZU NUMBERING PROPERLY DUE TO DUST/DIRT ON SETUP MODIFIED
NUMBER MARKING AREA
15.07.2021 30.07.2021
MARKING AREA

HYDRAULIC CYLINDERS ARE TO ELIMINATE RISK DUE TO WORK


13 ISUZU ROD BACK SIDE MILLING REPLACED WITH MECHANICAL SETUP MODIFIED SUPPORT FAILURE MECHANICAL 25.07.2021 09.08.2021
ARRANGEMENT ARRANGEMENT IS DONE

QD/QA/CIP/LIST : 01;10.2.4/10/9/2017
STATUS

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

IMPROVEMENT

You might also like