Professional Documents
Culture Documents
FLM Approval 3810133
FLM Approval 3810133
Number: METRO/R817/2022/3810133
Basic Details
Created By: 28459/ AVI
Created On : 25/07/2022 Time :11:22:42
GUPTA
Due Date: 29/07/2022 Prority: Very High
Subject: Administrative approval for movement of material lying at Last Changed By: 28459/ AVI
Najafgarh metro depot, GUPTA
Status: Closed
File Description
BEML/RS06&13/2507 Date: 25.07.2022
DMRC vide letter under ref (1) has raised a serious concern over the material lying in
their premises (NJFX Depot) and asked` BEML to vacate the area at the earliest.
Material which is lying in the premises is removed from the train due to various reasons
such as Modifications/ HECPs or component failure. Removed material is of no use at
depot so it is proposed to send back these items to BEML Bangalore Factory.
Approxi- Reason of
Sl. Material
Qty Project mate removal from
No Description Dimension (cm)
Weight the Train
Traction motor
Traction 01 burnt due to
1 RS 13 650 Kgs 105 x 97 x 85
Motor No wrong wiring
connection.
2 VCB 08 RS13 1 ton 120 x 104 x 103 02 Nos received
Nos vide DA
4909643165
dated
23.02.2018 in
damaged
condition from
Bangalore
Complex.
01 No removed
from Unit# 03 of
RS15 RS15 project
which damaged
during transit
01 Nos removed
from Unit# 04 of
RS13 RS13 project
which damaged
during transit
04 VCB in
RS6 Damaged
Condition
Replaced with
Rane Brake Block
710 as per DMRC
Rane Brake 80 recommendation.
3 RS13 1 ton
Block 710c Box Which is now not
238 x 145 x 107 suitable for
DMRC existing
project.
Diffuser Dummy Cover
120
4 Dummy RS13 200 Kgs removed from
Nos
Cover Unit 1 & 2.
RS-06 DLP
Material which is
Battery Cell 04
5 RS 6 50 Kgs 74 x 60 x 31 now not suitable
(SAFT) Nos.
to use in DMRC
existing projects
Extra Material
Door Cover 01 Received can be
6 RS 6 250 Kgs 115 x 80 x 64
Bracket Box reused in future
projects.
Damaged panel
16
7 FRP Panel 385 x 178 x 70 removed from
Nos
RS-06 units.
RS6 1.5 ton Extra Quantity
30 received can be
8 FRP Panel 405 x 205 x 105
Nos reused in future
projects.
Replaced as the
Battery Cell 01
9 RS6 200 Kgs 58 x 54 x 30 material is not
Wood Strip Box
fire retardant
01
10 ACL Cover 50Kgs 104 x 97 x 59 Material is
No
Received from
04
11 AC Reactor RS13 215 Kgs 104 x 85 x 77 BEML factory for
Nos
EMC/EMI testing
ACC 01
12 100 Kgs 104 x 98 x 97 of RS13 Cars.
Junction Box No.
2) Upon Management approval RMH is requested to positioning suitable vehicle through our approved
transporter.
DMRC_Letter_For_Vacating_space
File Notings
DMRC_Letter_For_Vacating_space
*************************************************************************************
The above listed items were either removed from train due to modification or faulty nature, or received in
damaged condition. These items were stored at NJFD till now. Now DMRC is pressing hard to vacate the area
occupied by BEML.
*************************************************************************************
Effort may be made to explore the possibility to dispose-off the faulty/damaged items (which can't be used
anymore in Trains) at Delhi itself to avoid the transportation charges from Delhi to Bangalore.
*************************************************************************************
Depot Team may please check the practices at Regional Office / Service Centre for such items.
*************************************************************************************
It is a rare practice to scrap items and in recent past no such activity has been carried out. Further, at present in
NJFD depot , considerable area is being occupied for storing these items in workshop shed.
Moreover, there is a huge pressure from DMRC to remove these items without delay from Depot at the earliest
possible.
Therefore, in view of exigency and under present condition, RMH is kindly requested to direct the concerned
logistic agency to take immediate action for arrangement of logistics for shipment of items from Najafgarh
depot.
*************************************************************************************
PDOs to be made for each defective / rejected items & based on that disposal action can be initiated by a team
headed by RT.
*************************************************************************************
RT
Sir,
Further to noting @ 006, Parts will be dispatched to Bangalore complex through approved transporter
and upon joint inspection with T&C, Quality and Production teams regrading usability / non usability of these
parts including actions required for repair (if any), PDOs will be initiated by the designated team at BCX.
*************************************************************************************
DGM T&C May please coordinate and complete all the activities.
Approved
*************************************************************************************
*************************************************************************************