Professional Documents
Culture Documents
RA of Tarpaulin Installation
RA of Tarpaulin Installation
Residual
Task / Activity
Risk Rating
(0,1,2,3,4,5)
(0,1,2,3,4,5)
Risk
Probability
Final
Severity
S/No.
Rating
Task Steps Potential Hazards Effect Control Measures Proposed (After Assessment
Controls
in place)
1 Planning of activity Incompetent Personal injury Each worker must have a:
workforce Occupational Site induction
Fatigue illness TBT / Task briefing to be conducted before
Inadequate Property damage starting activity covering the task and hazard Acceptable
4 3 H Low
supervision prevention controls measures, in the language of
the work force, acknowledged and documented
Provision of rest breaks
Adequate supervision will be provided
2 Preparation of Unauthorized Personal injury PTW will be obtained before starting the job.
activity area activity Property damage Inspect site and clear area of any obstructing
(Without PTW) material or debris.
Slips, trips, falls Area to be cordon of below the appropriate
Other workers in the safety signage
vicinity Identify all electrical lines in work area.
Movement of 5 3 H All equipment’s and cords testing and tagged Low Acceptable
machinery / before usage at site.
Equipment Ensure all vehicles are inspected before activity
Routine of vehicles at construction site area to be
closely monitored .
Reverse alarm must be in working condition or
flag man system be adopted.
3 Material Improper Accident Provision of flagman to control the traffic Low Acceptable
Shifting/Storage loading/off loading Personal injury Proper signage and barricade should be
(equipment, Improper storage. Back pain, provided
tools) Slip, trip, fall sprain / injury Use proper loading / off loading techniques
Traffic movement Damage to TBT should be conducted before starting the
Falling objects due equipment or 5 4 H activity
to mishandling property loss Ensure appropriate communication is
Improper manual maintained between workers and supervisor
handling techniques Ensure adequate PPE
Provision of MSDS
Use proper manual handling techniques .
Page 1 of 4
Task Risk Assessment for tarpaulin installation.
4 Lifting of workers Scessor lift or basket Personal injury The operator must have a current license / Low Acceptable
at height by crane overloading / Property certificate
basket uncontrolled loads damage Check the ground for stability
crane/Secssior lift Wear and attach a safety harness.
for tarpal Not operate the crane outside its load charts
installation. Know the weight of each lift
4 4 H
Strictly no lifting should be done if the visibility
is poor and the lifting activity shall be stopped
in case of heavy wind speed.
Only deploy suitable and physically fit
personnel that have experience to work at
height as before.
5 Work at height. Falling of personnel Personal Injury Tool Box talk /Task Briefing to be conducted Low Acceptable
and materials. Property before starting activity.
Collapse. Damage Workers wear full body harnesses and lifeline
as required.
Only deploy suitable and medically fit
5 5 H
personnel who have worked at heights before.
Access and egress shall not be obstructed.
Area to be cordoned off below with
appropriate safety signs.
6 Night Shift working Poor visibility at night Property damage Obtain PTW for the shift
Slip, trip, fall Personal injury Ensure TBT to be conducted
Ensure close supervision
Ensure proper lighting arrangement for late night
working hours Low Acceptable
5 4 H
Place reflection tapes at hard barriers structure
Work will not be allowed in poor lighting
conditions
Ensure proper housekeeping to avoid tripping
Ensure proper stacking of materials
Page 2 of 4
Task Risk Assessment for tarpaulin installation.
GENERAL COMMENTS:
2. Stand by vehicle/ambulance with driver must be present at the site in case of emergency.
Authorizing
Page 3 of 4
Task Risk Assessment for tarpaulin installation.
KEY
5 Almost Certain
1 Rare
0 1 3 4
2 5
Negligible Slight Moderate High Page 4 of 4
Very High