PROJECT: PROPOSED FAÇADE OF SANTO.

NIÑO DE TAGUIG PARISH CHURCH


LOCATION: SAMPALOC ST., SIGNAL VILLAGE, TAGUIG CITY
OWNER: ROMAN CATHOLIC BISHOP OF PASIG
SUBJECT: BAR CHART SCHEDULE

BAR CHART
2020
CONTRACT % TO MONTH JULY
ITEM DESCRIPTION COST CONTRACT WEEK 1
I. DEMOLITION AND EXCAVATION

1. Demolition of Concrete Pavement

2. Excavation of Footings (Belfry-FS1)

3. Excavation of Footings (FS2)

4. Excavation of Footings (FS3)

5. Disposal of Debris

II CIVIL/STRUCTURAL WORKS
1. Concrete, Rebar and Structural Erection
Works

2. Formworks and Scaffolding

3. Precast Works

4. Masonry Works

5. Truss Installation

III. ARCHITECTURAL WORKS


1. Doors and Windows

2. Textured Wall Works

4. Roofing Works

5. Ceiling Works
6. Finishes & Mouldings
a. Floor Finishes

b. Moldings

c. Finishing Hardwares

IV. ELECTRICAL WORKS

V. PLUMBING WORKS

VI. WATERPROOFING WORKS

VII. PAINTING WORKS


BAR CHART
AUGUST SEPTEMBER OCTOBER NOVEMBER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
NOVEMBER DECEMBER
18 19 20 21 22 23 24
PROJECT: PROPOSED FAÇADE OF SANTO. NIÑO DE TAGUIG PARISH CHURCH
LOCATION: SAMPALOC ST., SIGNAL VILLAGE, TAGUIG CITY
OWNER: ROMAN CATHOLIC BISHOP OF PASIG
SUBJECT: BAR CHART SCHEDULE

BAR CHAR
2020 1
CONTRACT % TO MONTH JULY
ITEM DESCRIPTION COST CONTRACT WEEK 1
I. DEMOLITION AND EXCAVATION

1. Demolition of Concrete Pavement

2. Excavation of Footings (Belfry-FS1)

3. Excavation and Backfilling of Footings (FS2)

4. Excavation and Backfilling of Footings (FS3)

5. Disposal of Debris

II CIVIL/STRUCTURAL WORKS
1. Concrete, Rebar and Structural Erection
works

2. Formworks and Scaffolding

3. Precast Works

4. Masonry Works
5. Truss Installation

III. ARCHITECTURAL WORKS


1. Doors and Windows

2. Textured Wall Works

4. Roofing Works

5. Ceiling Works

6. Finishes & Mouldings


a. Floor Finishes

b. Moldings

c. Finishing Hardwares

IV. ELECTRICAL WORKS

V. PLUMBING WORKS

VI. WATERPROOFING WORKS

VII. PAINTING WORKS


BAR CHART
6 13 20 27 3 10 17 24 1 7 14 21 28 5 12 19
AUGUST SEPTEMBER OCTOBER
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
26 2 9 16 23 1 7
NOVEMBER DECEMBER MIDDLE
18 19 20 21 22 23 24 25 26 LEFT
RIGHT
TOWER