Professional Documents
Culture Documents
No.19 - TBN Control Mechanism 2of2
No.19 - TBN Control Mechanism 2of2
ZONE REVISIONS
11 DATE REVD. CHKD. RE MTR. RE
DWG MF
A1 3-B REVISED ACCORDING TO SML'S COMMENTS 83.07.29
2 - B,C
A2 5-F ADDED DRAWING NO. 83.07.29
A A5
A6
B1
9-C ADDED COLOR OF LIGHT
ADDED DWG, ZONE OF BOARD ARROW
83.11.04
A
TURBINE
EMERGENCY
TRIP VALVE
TRIP/RESET
SH-T-002
EMERGENCY TRIP SIGNAL LIGHT (GREEN)
B B
SWITCH
LOCKOUT VALVE SIGNAL LIGHT (AMBER)
MASTER A5
LOCKOUT RESET OIL TRIP
TRIP
C A5
( 110.5 ~ 111.5 %)
FROM MAIN CIL TANK
(MOP DISCHARG OIL) C
RESET
EMERGENCY TRIP VALVE A2 SOLENOID
TURBINE 110V D.C.
(IN FRONT STANDARD)
EMERGENCY 006Q-P02-159 B~D-4
ZY
TRIP VALVE FROM 2412
TRIP/RESET INSTRUMENT
AIR LINE
SH-T-002
TURBINE
SOLENOID TRIP SOLENOID
ZY 110 V D.C. (IN FRONT STANDARD)
A2 2410 MASTER TRIP/RESET A5
RESET SOLENOID
006Q-P02-159 SH-T-001
D FROM
INSTRUMENT
AIR LINE
D
NOTES
(1) THIS DIAGRAM IS PREPARED ACCORDING TO "PREPARATION PROCEDURES FOR
FLOW DIAGRAMS " REF. NO. 001W - XLG.
(2) FOR EXPLANATION OF SYSBOLS , REFER TO " PIPING AND INSTRUMENT
SYMBOLS " REF. NO. 001W - XLG - 001 .
(3) WITH REGARD TO THE INTERLOCK REFFER TO " AUXIRIARY
INTERLOCK BLOCK DIAGRAM ( TURBINE AND GENERATOR ) " REF. NO.
006S - P06 - 684 . THE SHEET NO.'S OF THE INTERLOCK DIAGRAMS
ARE SHOWN IN THIS DRAWING.
TEST INTERLOCK LIGHT (AMBER) (1) 10P107 - 255 DIAGRAM OF TURBINE CONTROL MECHANISM ( 12)
(2) 10Q175 - 198 SUPERVISORY INSTRUMENTS OF TURBINE AND GENERATOR
TEST SIGNAL LIGHT (WHITE) (3) 10P107 - 257 DIAGRAM OF TURBINE OIL PIPING ( 12)
(4) 10P107 - 258 DIAGRAM OF TURBINE OIL PIPING ( 2 2)
(5) 10P098 - 455 DIAGRAM OF GLAND STEAM PIPING A3
(6) 006Q - P02 - 159 P&ID OF UNIT INSTRUMENT AIR SYSTEM A3
E E
TURNING GEAR
MOTOR
TURNING GEAR
SOLENOID
SH-T-011
TEST HANDLES
F TURNING GEAR
ZCO
2419
ZCC
2419 THURUST BEARING WEAR F
TURNING GEAR
TRANSFER SWITCH SIGNAL SWITCH DETECTOR TEST PANEL
( IN MIDDLE STANDARD)
THIS DRAWING IS THE PROPERTY OF HITACHI LTD. DELIVERY HEREOF IS MADE UPON THE
UNDERSTANGDING THAT IT WILL NOT BE COPIED IN WHOLE OR IN PART. THAT IT WILL BE
E RETURNED UPON REQUEST AND THAT THE INFROMATION AND DATA THEREIN CONT
AINED WILL BE KEPT CONFIDENTIAL AND NOT DISCLOSED TO ANY OUTSIDERS.
FROM
INSTRUMENT
TO MAIN OIL TANK B1 AIR LINE
( DRAIN OIL) B~D-4 006Q-P02-159 FOR SIMULATOR
9 - A 10P107-257
TURNING GEAR
A2 MOTOR
TURNING GEAR FINAL DRAWING
ENGAGE
10P107-257 9 - A SOLENOID
UNIT PROJ.
NO. 1~6 DWG.NO. HTC 010 MEC DW 78034 O
TURNING GEAR DEVICE MARUBENI CONSORTIUM
NATIONAL ELECTRIC POWER AUTHORITY
NIGERIA
H LAGOS THERMAL STATION - EGBIN
CONSULTING ENGINEERS - SHAWMONT LTD.
H
DWN. 82.12.27 THIRD TITLE
82.12.28 ANG. PROJ.
CHKD. DIAGRAM OF TURBINE
82.12.28 SCALE
CONTROL MECHANISM (2 2)
APPD 82.12.28