Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

1.

Recovery System
1.1 Main Parachute
1.1.1 Parachute CAD & Description (Roberto)(Deadline: 12/23/21)
1.1.2 Parachute CFD Analysis & Description of Analysis
(Roberto)(Deadline: 12/23/21)
1.2 Drogue Parachute
1.2.1 Parachute CAD & Description (Sebastian Matias)(Deadline:
12/23/21)
1.2.3 Parachute CFD Analysis & Description of Analysis (Sebastian
Matias)(Deadline: 12/23/21)
1.3 Attachment Hardware
1.3.1 Shock Cord (Jennifer)(Deadline: 12/23/21)
1.3.2 Quick Links (Jennifer)(Deadline: 12/23/21)
1.3.3 Shourd Lines(Jennifer)(Deadline: 12/23/21)
1.4 Recovery Electronics
1.4.1 Altimeters & Schematics ( Sebastian Espiña & Axel)(Deadline:
12/23/21)
1.4.2 Batteries (Axel)(Deadline: 12/23/21)
1.4.3 System Flow Chart (Dylan)(Deadline: 12/23/21)
1.4.4 Block Diagram (Daniel)(Deadline: 12/23/21)
1.4.5 Trackers (Daniel)(Deadline: 12/23/21)
1.4.6 Link Budget (Sebastian Espiña & Wilfredo Lamberty)(Deadline:
12/23/21)
1.4.7 EM Shielding (Axel)(Deadline: 12/23/21)
1.5 Avionics Bay
1.5.1 Avionics Bay CAD Design & Description (Bryan)(Deadline:
12/23/21)
1.5.2 Avionics Bay Strength (ANSYS) Analysis & Description of
Analysis (Bryan)(Deadline: 12/23/21)
1.5.3 Avionics Sled (Amanda)(Deadline: 12/23/21)
1.5.4 Pressure Ports (Lamberty) (Deadline: 12/23/21)
1.6 CO2 Ejection System
1.6.1 CO2 Calculations (Sebastian Espiña)(Deadline: 12/23/21)
1.6.2 Main & Drogue Distribution (Sebastian Espiña)(Deadline:
12/23/21)
1.7 Mission Performance Predictions
1.7.1 Kinetic Energy (Roberto) (Deadline: 12/30/21)
1.7.2 Expected Descent Time (Sebastian)(Deadline: 12/30/21)
1.8 Subscale Flight Result
1.8.1 Flight Electronic Data (Daniel & Dylan)(Deadline: 12/30/21)
1.8.2 Parachutes (Jennifer) (Deadline: 12/30/21)
1.8.3 Attachment Hardware (Jennifer)(Deadline: 12/30/21)
1.9 Flight Analysis
1.9.1 Predicted Flight Data vs. Actual Flight Data (Sebastian
Espiña)(Deadline: 12/30/21)
1.9.2 Comparison Table of Predicted Data vs. Actual Flight Data
(Axel)(Deadline: 12/30/21)
1.9.3 Error Table (Axel)(Deadline: 12/30/21)
1.10 Impact on Fullscale Design
● Explain Results and what can be improved. (Expected vs.
Reality) (Bryan & Amanda)(Deadline: 12/30/21)

You might also like