ARTICULATED Rev.
CONTROL OF EQUIPMENTS
Pre-mobilization inspection checklist CRANE Date:
To complete by I/E to SHE Department TECHNIP G B LIFTING SYSTEM G B MISCELLANIOUS G B DOCUMENTATION G B CAB
Mirrors
Signature:
Load moment indicator
Load charts
The mobile plant must comply with manufacturer
Specifications.
The mobile plant operator must inspect visually his plant G B SIGNAGE G B ENGINE
before use (on daily basis) and file these inspections Safe Working Load (SWL) Exhaust
reports to the Equipment manager every week.
Boom angle indicator STABILITY DEVICE Engine cover / guard
G B MOTION MEANS G B G B CAB ACCESS
When required, the operator must wear necessary Tires Outriggers Handholds Battery & Hold downs
Personal Protective Equipments (Reflective vest, glasses,
ear protections, safety shoes, gloves...) G B WARNING DEVICES
Rims Outrigger pads Step Hydraulic hoses
Received by:
Date: / / 20
Receiver Signature:
This form must be completed before to bring the mobile plant to Algiers Refinery Rehabilitation and Adaptation Project Site. This form shows each items which will be inspected by SHE personnel of SE before entrance on site. The
mobile plant will be authorized to enter onto Algiers Refinery Rehabilitation and Adaptation Project Site only if all these items are in good condition. Owner/supplier will be in requested to repair all defective or unsafe parts (SHE
department will be not be responsible of loss of time or productivity if this mobile plant is not authorized to enter on site ). When all defectives parts are corrected, a permanent or temporary site
access pass will be delivered. (A sticker will be display onto the cab windscreen for permanent mobile plant and a cardboard pass will be delivered for temporary mobile plant). The operator has to
attend the SHE induction course and receive a permanent or temporary site access badge. The operator must be equipped with all required personal protective equipments. He will have to respect
all instructions coming from HSE supervisorand foremen.