TYPE OF DOCUMENT

CONTROL OF EQUIPMENTS
COMPACT TRACK Rev. 0.1

Pre-mobilization inspection checklist LOADER Date:

GATE LNG PROJECT

To complete by I/E to SHE Department TECHNIP G B MISCELLANIOUS G B DOCUMENTATION G B CAB

Fire extinguisher User manual Seat


Inspector name:
Spill absorbent kit Maintenance note book Seatbelt & mounting
Subcontractor:
Electronic devices
Location:
Signage / Pictograms
Plant's Make: G B ENGINE

Exhaust Handles
Plant's Model:
Engine cover / guard Pedals
Serial number:

Inspection date: / / 20 Battery & Hold downs Steel protective mesh

Hydraulic hoses Mirrors


Signature:
Engine coolant, oil and
hydraulic oil level

No hydraulic oil leakage

The mobile plant must comply with manufacturer G B CAB ACCESS

Specifications. Handholds

Step
The mobile plant operator must inspect visually his plant
before use (on daily basis) and file these inspections
reports to the Equipment manager every week.
G B MOTION MEANS G B LOADER

When required, the operator must wear necessary Overall Undercarriage Boom
G B HYDRAULIC SYSTEM
Personal Protective Equipments (Reflective vest, glasses,
ear protections, safety shoes, gloves...) G B WARNING DEVICES
Hydraulic cylinders Idlers & Rollers Bucket

Horn & Back-up alarm Hydraulic hoses Drive Sprockets Bucket teeth
An maintenance note book registering all reparation and
Flashing light Hydraulic fittings Track Assembly Safety pins
maintenance cares must be kept into the cab. It must be
available in understandable language for the operator. Lights, turn signals, stop
lamps, reversing lamps

The operator's employer must ensure that the operator


has suitable medical fitness and technical competencies
G : Good condition / Present B : Bad condition / Missing
to drive the plant.
Comments:

Received by:
Date: / / 20
Receiver Signature:

This form must be completed before to bring the mobile plant to Algiers Refinery Rehabilitation and Adaptation Project Site. This form shows each items which will be inspected by SHE personnel of SE before entrance on site. The
mobile plant will be authorized to enter onto Algiers Refinery Rehabilitation and Adaptation Project Site only if all these items are in good condition. Owner/supplier will be in requested to repair all defective or unsafe parts (SHE
department will be not be responsible of loss of time or productivity if this mobile plant is not authorized to enter on site). When all defectives parts are corrected, a permanent or temporary site
access pass will be delivered. (A sticker will be display onto the cab windscreen for permanent mobile plant and a cardboard pass will be delivered for temporary mobile plant). The operator has to
attend the SHE induction course and receive a permanent or temporary site access badge. The operator must be equipped with all required personal protective equipments. He will have to respect
all instructions coming from HSE supevisorand foremen..