SNHPL to LASA
S.No. Letter No. Dated Subject Address
SNHPL to LASA
S.No. Letter No. Dated Subject Address
Submission of Bar Bending Schedule for Vehicle Underpass(VUP) at KM:
54 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0105 24.01.2018 Team Leader
52+643.
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/476 Submission of Comprehensive Traffic Diversion plan at VUP Ch. Km. Team Leader
02.02.2019 52+643
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/482 02.02.2019 Submission of Drawing regarding extension of RE Wall at Km 52+643 Team Leader
LASA to SNHPL
S.No Letter No. Dated Subject Address
24.11.2017 SNHPL
132 Submission of Revised Drawing and Bar Bending Schedule for Minor
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0193 28.04.2018 Bridge at KM 54+775 RHS TL (LASA)
164 Submision of Design & Drawing of Minor Bridge Median Wall at Km:
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0230 06.06.2018 54+775 TL (LASA)
166 Submission of Bar Bending Schdule for Midian Wall minor Bridge at
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0232 07.06.2018 Km:54+775 TL (LASA)
LASA to SNHPL
S.No Letter No. Dated Subject Address
Submission of Revised Design & Drawing of Abutment A1 & A2 for Minor SNHPL
87 LASA/NH-87/P-2/SNHPL/2018/86 11.04.2018 Bridge at KM 54+775
SNHPL
102 LASA/NH-87/P-2/SNHPL/2018/101 14.05.2018 Review of Minor Bridge at KM.54+775
116 LASA/NH-87/P-2/SNHPL/2018/115 13.06.2018 Design and Drawing for Median wall at KM 54+775 SNHPL
Submission of Bar Bending Schedule (BBS) for Minor Bridge at
170 LASA/NH-87/P-2/SNHPL/2018/170 31.08.2018 Km:54+775 SNHPL
LASA to SNHPL
S.No Letter No. Dated Subject Address
22.03.2018 pouring of Concrete of inadequate Slump in Raft of Minor Bridge at KM SNHPL
69 LASA/NH-87/P-2/SNHPL/2018/69 58+440 A2 (Kathgodam site
SNHPL to LASA
S.No. Letter No. Dated Subject Address
Re-submission of Design and Drawing of Abutment A1&A2 for Minor
46 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0094 12.01.2018 Team Leader
Bridge at KM: 54+793, 57+415 & 58+440.
106 Submission of Design & Drawing of Median Wall for Abutment A1 & A2
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0165 02.04.2018 Minor Bridge at KM 58+440 Team Leader
115 Submission of Revised drawing of Abutment A1 & A2 for Minor Bridge at Team Leader
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0174 07.04.2018 Km 58+440
SNHPL to LASA
S.No. Letter No. Dated Subject Address
183
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0253 20.06.2019 Design and Drawing of Minor Bridge t KM 60+643(CA Chainage) TL (LASA)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018 56+436 RHS for Construction of Minor Bridge at km;62+446 at PD-NHAI
km;60+643 &at km;56+450
197
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0269 05.7.2018 Submission of bar bending schedule for MNB at KM. 60+635 TL (LASA)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018 56+436 RHS for Construction of Minor Bridge at km;62+446 at PD-NHAI
km;60+643 &at km;56+450
LASA to SNHPL
S.No Letter No. Dated Subject Address
138 LASA/NH-87/P-2/SNHPL/2018/137 19.07.2018 Design & Drawing for MNB at Design Chainage km. 60+635 ( CA CH.60+643 SNHPL
168 LASA/NH-87/P-2/SNHPL/2018/168 31.08.2018 Submission of Ber Bending Schedule (BBS) for MNB at KM 60+635. SNHPL
169 LASA/NH-87/P-2/SNHPL/2018/169 31.08.2018 Submission of Ber Bending Schedule (BBS) for MNB at KM 60+635. SNHPL
138 LASA/NH-87/P-2/SNHPL/2018/137 19.07.2018 Design & Drawing for MNB at Design Chainage km. 60+635 ( CA CH.60+643 SNHPL
LASA to SNHPL
S.No Letter No. Dated Subject Address
220 LASA/NH-87/P-2/SNHPL/2018/223 08.12.2018 Compliance of Design and Drawing of MNB at Km. 62+425 SNHPL
SNHPL to LASA
S.No. Letter No. Dated Subject Address
82 Submission of Design & drawing of Abutment A1 & A2 for Minor Bridge at
SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0135 22.02.2018 Team Leader
KM 62+446
188
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0258 23.06.2018 Design and Drawing of Minor Bridge at KM 62+446 & 63+446 TL (LASA)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018 56+436 RHS for Construction of Minor Bridge at km;62+446 at PD-NHAI
km;60+643 &at km;56+450
LASA to SNHPL
S.No Letter No. Dated Subject Address
29.12.2017 Dismantling of the Structure of the Uttarakhand Seeds & tarai SNHPL
32 LASA/NH-87/P-2/SNHPL/2017/32 Development Corporation Limited from KM: 56+716 to KM: 56+970
128 LASA/NH-87/P-2/SNHPL/2018/127 04.07.2018 Design and Drawing for minor Bridge at Design chainage Km:56+430 SNHPL
215 LASA/NH-87/P-2/SNHPL/2018/218 30.11.2018 Compliance of Design and Drawing of MNB at Km 56+430 SNHPL
SNHPL to LASA
S.No. Letter No. Dated Subject Address
184
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0254 21.06.2018 Design and Drawing of Minor Bridge at KM 56+450 CA Chainahe TL (LASA)
201
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0276 9.07.2018 compliance of design and drawing of MNB at KM- 56+430 TL (LASA)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018 56+436 RHS for Construction of Minor Bridge at km;62+446 at PD-NHAI
km;60+643 &at km;56+450
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/509
15.02.2019 Submission of Design of MNB at Km. 56+430 and at Km. 57+400. J.P Das
SNHPL to LASA
S.No. Letter No. Dated Subject Address
Re-submission of Design and Drawing of Abutment A1&A2 for Minor
46 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0094 12.01.2018 Team Leader
Bridge at KM: 54+793, 57+415 & 58+440.
194 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0264 30.06.2018 Desgin and Drawing of minor Bridge at Km:52+910 and 57+400 TL (LASA)
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/365 31.10.2018 Shotdown for 11KV A/LT Lines at km;57+000 LHS . Team Leader
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/509
15.02.2019 Submission of Design of MNB at Km. 56+430 and at Km. 57+400. J.P Das
LASA to SNHPL
S.No Letter No. Dated Subject Address
11.01.2018 Submission of Design and Drawing of Abutment A1 & A2 for Minor SNHPL
37 LASA/NH-87/P-2/SNHPL/2018/37 Bridge at Km 54+793 & 57+415
LASA to SNHPL
S.No Letter No. Dated Subject Address
85 LASA/NH-87/P-2/SNHPL/2018/84 10.04.2018 Submission of Plan&Profile at KM 43+446 to 63+000 SNHPL
209 LASA/NH-87/P-2/SNHPL/2018/212 16.11.2018 FWD test for Improvement of Existing Road from Km. 63+400 to Km. 66+0 SNHPL
226 LASA/NH-87/P-2/SNHPL/2018/229 28.12.2018 Review of Design and Drawing for MNB at Km. 63+434 SNHPL
Notice under Article 16.1 of the Concession Agreement for de-scoping of
239 LASA/NH-87/P-2/SNHPL/2018/242 01.01.2019 Km. 63+400 to KM. 66+000( Elephant Corridor) SNHPL
SNHPL to LASA
S.No. Letter No. Dated Subject Address
117 Team Leader
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0176 09.04.2018 Submission of Plan & Profile at KM 43+446 to 63+000
188
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0258 23.06.2018 Design and Drawing of Minor Bridge at KM 62+446 & 63+446 TL (LASA)
Positive and Negative change of Scope for the works from km. 63+400 to
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/381 16.11.2018 66+000 BHS. Team Leader
COS
Date: 27.03.2019
IE Observation / Comments
S.No. Structure Type Description Chainage Letter Ref. No Date Letter No. Subject Date Remarks
45+765,
46+228, PUP at KM 45+765, 46+228,
3 PUP 46+575, & LASA 0278 46+575, & 47+150 08.03.2019 SNHPL
47+150
SNHPL to LASA
S.No. Letter No. Dated
54 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0105 24.01.2018
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/476
02.02.2019
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/482 02.02.2019
LASA to SNHPL
S.No Letter No. Dated
22 LASA/NH-87/P-2/SNHPL/2017/22 24.11.2017
28 LASA/NH-87/P-2/SNHPL/2017/28 12.12.2017
16.01.2018
40 LASA/NH-87/P-2/SNHPL/2018/40
02.02.2018
57 LASA/NH-87/P-2/SNHPL/2018/57
148 LASA/NH-87/P-2/SNHPL/2018/148 03.08.2018
250 LASA/NH-87/P-2/SNHPL/2018/256 01.02.2019
SNHPL to LASA
S.No. Letter No. Dated
112
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0171 05.04.2018
132
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0193 28.04.2018
164
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0230 06.06.2018
166
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0232 07.06.2018
LASA to SNHPL
S.No Letter No. Dated
87 LASA/NH-87/P-2/SNHPL/2018/86 11.04.2018
102 LASA/NH-87/P-2/SNHPL/2018/101 14.05.2018
116 LASA/NH-87/P-2/SNHPL/2018/115 13.06.2018
LASA to SNHPL
S.No Letter No. Dated
22.03.2018
69 LASA/NH-87/P-2/SNHPL/2018/69
SNHPL to LASA
S.No. Letter No. Dated
46 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0094 12.01.2018
106
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0165 02.04.2018
115
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0174 07.04.2018
212
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0288 22.07.2018
SNHPL/R-K PKG-II/PO/FY/2018-19/NHAI/0336 06.10.2018
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/484
04.02.2019
SNHPL to LASA
S.No. Letter No. Dated
183 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0253 20.06.2019
LASA to SNHPL
S.No Letter No. Dated
138 LASA/NH-87/P-2/SNHPL/2018/137 19.07.2018
LASA to SNHPL
S.No Letter No. Dated
220 LASA/NH-87/P-2/SNHPL/2018/223 08.12.2018
SNHPL to LASA
S.No. Letter No. Dated
82 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0135 22.02.2018
188 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0258 23.06.2018
LASA to SNHPL
S.No Letter No. Dated
29.12.2017
32 LASA/NH-87/P-2/SNHPL/2017/32
128 LASA/NH-87/P-2/SNHPL/2018/127 04.07.2018
215 LASA/NH-87/P-2/SNHPL/2018/218 30.11.2018
SNHPL to LASA
S.No. Letter No. Dated
184 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0254 21.06.2018
201 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0276 9.07.2018
SNHPL to LASA
S.No. Letter No. Dated
46 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0094 12.01.2018
194 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0264 30.06.2018
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/365 31.10.2018
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/509 15.02.2019
LASA to SNHPL
S.No Letter No. Dated
11.01.2018
37 LASA/NH-87/P-2/SNHPL/2018/37
LASA to SNHPL
S.No Letter No. Dated
85 LASA/NH-87/P-2/SNHPL/2018/84 10.04.2018
209 LASA/NH-87/P-2/SNHPL/2018/212 16.11.2018
226 LASA/NH-87/P-2/SNHPL/2018/229 28.12.2018
SNHPL to LASA
S.No. Letter No. Dated
117 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0176 09.04.2018
188 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0258 23.06.2018
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/381 16.11.2018
to SNHPL
Subject Dated RFI No.
GAD, Dimension and Reinforcement detail for MNBR at KM 52+910 06.12.2018 STR/2362
SNHPL to LASA
Subject
Desgin and Drawing of minor Bridge at Km:52+910 and 57+400
L to LASA
Subject
Submission of Bar Bending Schedule for Vehicle Underpass(VUP) at KM:
52+643.
Submission of Traffic Management Plan/Diversion for Construction of
VUP(RHS) at KM: 52+643
Resubmission of Traffic Management Plan/Diversion for Construction of
VUP (RHS) at KM: 52+643.
Submission of Comprehensive Traffic Diversion plan at VUP Ch. Km.
52+643
Submission of Drawing regarding extension of RE Wall at Km 52+643
to SNHPL
Subject
Construction of VUP at KM 52+643
VUP at KM 52+643
Traffic management Plan/Diversion for constuction of VUP (RHS) at KM
52+643
Submission of Traffic Management Plan/Diversion for Construction of
VUP (RHS) at KM: 52+643.
observation on the Reinforced Soil wall(VUP at-Km52+643
Submission of comprehensive Traffic Diversion plant at VUP ch.km 52+643
L to LASA
Subject
Submission of Revised Design & Drawing of Abutment A1&A2 for Minor
Bridge at KM 54+775
Submission of Revised Drawing and Bar Bending Schedule for Minor
Bridge at KM 54+775 RHS
Submision of Design & Drawing of Minor Bridge Median Wall at Km:
54+775
Submission of Bar Bending Schdule for Midian Wall minor Bridge at
Km:54+775
to SNHPL
Subject
Submission of Revised Design & Drawing of Abutment A1 & A2 for Minor
Bridge at KM 54+775
Review of Minor Bridge at KM.54+775
Design and Drawing for Median wall at KM 54+775
Submission of Bar Bending Schedule (BBS) for Minor Bridge at
Km:54+775
to SNHPL
Subject
pouring of Concrete of inadequate Slump in Raft of Minor Bridge at KM
58+440 A2 (Kathgodam site
L to LASA
Subject
Re-submission of Design and Drawing of Abutment A1&A2 for Minor
Bridge at KM: 54+793, 57+415 & 58+440.
Submisson of Bar Bending Schedule Abutment A1&A2 for Minor Bridge at
KM: 58+440.
Submission of Design & Drawing of Median Wall for Abutment A1 & A2
Minor Bridge at KM 58+440
Submission of Revised drawing of Abutment A1 & A2 for Minor Bridge at
Km 58+440
POT PTFE Bearing testing for MNB 58+440 at Dynamic Prestressing Pune
L to LASA
Subject
Design and Drawing of Minor Bridge t KM 60+643(CA Chainage)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
56+436 RHS for Construction of Minor Bridge at km;62+446 at
km;60+643 &at km;56+450
Submission of bar bending schedule for MNB at KM. 60+635
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
56+436 RHS for Construction of Minor Bridge at km;62+446 at
km;60+643 &at km;56+450
to SNHPL
Subject
Design & Drawing for MNB at Design Chainage km. 60+635 ( CA CH.60+643)
to SNHPL
Subject
Compliance of Design and Drawing of MNB at Km. 62+425
L to LASA
Subject
Submission of Design & drawing of Abutment A1 & A2 for Minor Bridge at
KM 62+446
Design and Drawing of Minor Bridge at KM 62+446 & 63+446
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
56+436 RHS for Construction of Minor Bridge at km;62+446 at
km;60+643 &at km;56+450
to SNHPL
Subject
L to LASA
Subject
Design and Drawing of Minor Bridge at KM 56+450 CA Chainahe
compliance of design and drawing of MNB at KM- 56+430
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
56+436 RHS for Construction of Minor Bridge at km;62+446 at
km;60+643 &at km;56+450
Submission of Design of MNB at Km. 56+430 and at Km. 57+400.
L to LASA
Subject
Re-submission of Design and Drawing of Abutment A1&A2 for Minor
Bridge at KM: 54+793, 57+415 & 58+440.
Desgin and Drawing of minor Bridge at Km:52+910 and 57+400
Shotdown for 11KV A/LT Lines at km;57+000 LHS .
Submission of Design of MNB at Km. 56+430 and at Km. 57+400.
to SNHPL
Subject
Submission of Design and Drawing of Abutment A1 & A2 for Minor
Bridge at Km 54+793 & 57+415
to SNHPL
Subject
Submission of Plan&Profile at KM 43+446 to 63+000
FWD test for Improvement of Existing Road from Km. 63+400 to Km. 66+000.
Review of Design and Drawing for MNB at Km. 63+434
Notice under Article 16.1 of the Concession Agreement for de-scoping of
Km. 63+400 to KM. 66+000( Elephant Corridor)
L to LASA
Subject
Submission of Plan & Profile at KM 43+446 to 63+000
Design and Drawing of Minor Bridge at KM 62+446 & 63+446
Positive and Negative change of Scope for the works from km. 63+400 to
66+000 BHS.