LASA to SNHPL

S.No Letter No. Dated Subject Address


Construction Survay of Existing Bridge at Km:52+910 and Change of
127 LASA/NH-87/P-2/SNHPL/2018/126 04.07.2018 Scope proposal for Minor Bridge at Km:52+910 on BHS Service road SNHPL
Condition Survey of Existing Bridge at Km.52+910 and Change of Scope
211 LASA/NH-87/P-2/SNHPL/2018/214 18.11.2018 Proposal for Minor Bridge at Km. 52+910 on BHS service Road . SNHPL
214 LASA/NH-87/P-2/SNHPL/2018/217 30.11.2018 GAD, Dimension and Reinforcement detail for MNBR at KM 52+910 SNHPL
Condition Survey of Existing Bridge at Km.52+910 and Change of Scope
225 LASA/NH-87/P-2/SNHPL/2018/228 19.12.2018 Proposal for Minor Bridge at Km. 52+910 on BHS service Road . SNHPL
Change of scope for minor bridge at Km. 52+910 and 2 Nos MNB falling
237 LASA/NH-87/P-2/SNHPL/2018/240 01.01.2019 in the Alignment of slip Road. SNHPL

Reconstruction of Existing Minor Bridge at Km. 52+910 addtiional width


of approches , additional Minor Bridge at Km. 52+910on BHS slip road
243 LASA/NH-87/P-2/SNHPL/2018/247 14.01.2019 under Change of Scope . SNHPL

SNHPL to LASA
S.No. Letter No. Dated Subject Address

189 Condition Survey of Existing Bridge at KM 52+910 and Change of Scop


SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0259 24.06.2018 Proposal for Minor Bridge at KM 52+910 on BHS Service Road. TL (LASA)
194 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0264 30.06.2018 Desgin and Drawing of minor Bridge at Km:52+910 and 57+400 TL (LASA)

Condition Survey of Existing Bridge at KM 52+910 and Change of Scop


SNHPL/R-K PKG-II/PO/FY/2018-19/NHAI/0334 03.10.2018 Proposal for Minor Bridge at KM 52+910 on BHS Service Road. TL (LASA)

Condition Survey of Existing Bridge at Km. 52+910 and Change of Scope


SNHPL/R-K PKG-II/PO/FY2018-19/LASA/390 25.11.2018 PD-NHAI
Proposal for Minor Bridge at Km. on BHS Service Road .

Reconstruction of Existing Minor Bridge at Km. 52+910, additional width


SNHPL/R-K PKG-II/PO/FY2018-19/LASA/423 02.01.2019 of approaches additional Minor Bridge at Km. 52+910 BHS Slip Road and Team Leader
additional Slip Road underChange of Scope .

SNHPL to LASA
S.No. Letter No. Dated Subject Address
Submission of Bar Bending Schedule for Vehicle Underpass(VUP) at KM:
54 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0105 24.01.2018 Team Leader
52+643.

Submission of Traffic Management Plan/Diversion for Construction of


58 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0110 30.01.2018 Team Leader
VUP(RHS) at KM: 52+643

Resubmission of Traffic Management Plan/Diversion for Construction of


63 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0116 05.02.2018 Team Leader
VUP (RHS) at KM: 52+643.

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/476 Submission of Comprehensive Traffic Diversion plan at VUP Ch. Km. Team Leader
02.02.2019 52+643
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/482 02.02.2019 Submission of Drawing regarding extension of RE Wall at Km 52+643 Team Leader

LASA to SNHPL
S.No Letter No. Dated Subject Address

24.11.2017 SNHPL

22 LASA/NH-87/P-2/SNHPL/2017/22 Construction of VUP at KM 52+643


28 LASA/NH-87/P-2/SNHPL/2017/28 12.12.2017 VUP at KM 52+643 SNHPL

16.01.2018 Traffic management Plan/Diversion for constuction of VUP (RHS) at KM SNHPL


40 LASA/NH-87/P-2/SNHPL/2018/40 52+643

02.02.2018 Submission of Traffic Management Plan/Diversion for Construction of SNHPL


57 LASA/NH-87/P-2/SNHPL/2018/57 VUP (RHS) at KM: 52+643.
148 LASA/NH-87/P-2/SNHPL/2018/148 03.08.2018 observation on the Reinforced Soil wall(VUP at-Km52+643 SNHPL
250 LASA/NH-87/P-2/SNHPL/2018/256 01.02.2019 Submission of comprehensive Traffic Diversion plant at VUP ch.km 52+643 SNHPL
SNHPL to LASA
S.No. Letter No. Dated Subject Address
112 Submission of Revised Design & Drawing of Abutment A1&A2 for Minor Team Leader
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0171 05.04.2018 Bridge at KM 54+775

132 Submission of Revised Drawing and Bar Bending Schedule for Minor
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0193 28.04.2018 Bridge at KM 54+775 RHS TL (LASA)
164 Submision of Design & Drawing of Minor Bridge Median Wall at Km:
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0230 06.06.2018 54+775 TL (LASA)
166 Submission of Bar Bending Schdule for Midian Wall minor Bridge at
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0232 07.06.2018 Km:54+775 TL (LASA)

LASA to SNHPL
S.No Letter No. Dated Subject Address
Submission of Revised Design & Drawing of Abutment A1 & A2 for Minor SNHPL
87 LASA/NH-87/P-2/SNHPL/2018/86 11.04.2018 Bridge at KM 54+775
SNHPL
102 LASA/NH-87/P-2/SNHPL/2018/101 14.05.2018 Review of Minor Bridge at KM.54+775
116 LASA/NH-87/P-2/SNHPL/2018/115 13.06.2018 Design and Drawing for Median wall at KM 54+775 SNHPL
Submission of Bar Bending Schedule (BBS) for Minor Bridge at
170 LASA/NH-87/P-2/SNHPL/2018/170 31.08.2018 Km:54+775 SNHPL

LASA to SNHPL
S.No Letter No. Dated Subject Address
22.03.2018 pouring of Concrete of inadequate Slump in Raft of Minor Bridge at KM SNHPL
69 LASA/NH-87/P-2/SNHPL/2018/69 58+440 A2 (Kathgodam site

Submission of Design and drawing of RCC T- Girder, CUM PTFE BEARING


172 LASA/NH-87/P-2/SNHPL/2018/172 31.08.2018 &ELASTOMERIC PAD and Abutment Cap of Minor Bridge at Km:58+440 SNHPL
Submission of Design and Drawing POT CUM PTFE bearing for Minor
206 LASA/NH-87/P-2/SNHPL/2018/209 10.11.2018 Bridge at Km:58+440 SNHPL
222 LASA/NH-87/P-2/SNHPL/2018/225 14.12.2018 Compliance of Design and Drawing of MNB at Km. 58+440 SNHPL

SNHPL to LASA
S.No. Letter No. Dated Subject Address
Re-submission of Design and Drawing of Abutment A1&A2 for Minor
46 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0094 12.01.2018 Team Leader
Bridge at KM: 54+793, 57+415 & 58+440.

Submisson of Bar Bending Schedule Abutment A1&A2 for Minor Bridge at


53 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0104 24.01.2018 Team Leader
KM: 58+440.

106 Submission of Design & Drawing of Median Wall for Abutment A1 & A2
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0165 02.04.2018 Minor Bridge at KM 58+440 Team Leader
115 Submission of Revised drawing of Abutment A1 & A2 for Minor Bridge at Team Leader
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0174 07.04.2018 Km 58+440

Submission of Design and Drawing of RCC T-Girder, POT CUM PTFE


212 Bearing & Elastomeric PAD and Design Of Abutment Cap of Minor Bridge
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0288 22.07.2018 at Km. 58+440 TL (LASA)
Submission of Design and Drawing of POT CUM PTEE Bearing fpr Minor
SNHPL/R-K PKG-II/PO/FY/2018-19/NHAI/0336 06.10.2018 TL (LASA)
Bridge at KM 58+440
Submission of Design and Drawing of Preeastre RCC T Girder Super
SNHPL/R-K PKG-II/PO/FY/2018-19/NHAI/0344 17.10.2018 Structure of Minor Bridge at KM 58+440 TL (LASA)

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/484 Team Leader


04.02.2019 POT PTFE Bearing testing for MNB 58+440 at Dynamic Prestressing Pune

SNHPL to LASA
S.No. Letter No. Dated Subject Address

183

SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0253 20.06.2019 Design and Drawing of Minor Bridge t KM 60+643(CA Chainage) TL (LASA)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018 56+436 RHS for Construction of Minor Bridge at km;62+446 at PD-NHAI
km;60+643 &at km;56+450

197
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0269 05.7.2018 Submission of bar bending schedule for MNB at KM. 60+635 TL (LASA)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018 56+436 RHS for Construction of Minor Bridge at km;62+446 at PD-NHAI
km;60+643 &at km;56+450

LASA to SNHPL
S.No Letter No. Dated Subject Address
138 LASA/NH-87/P-2/SNHPL/2018/137 19.07.2018 Design & Drawing for MNB at Design Chainage km. 60+635 ( CA CH.60+643 SNHPL

168 LASA/NH-87/P-2/SNHPL/2018/168 31.08.2018 Submission of Ber Bending Schedule (BBS) for MNB at KM 60+635. SNHPL

169 LASA/NH-87/P-2/SNHPL/2018/169 31.08.2018 Submission of Ber Bending Schedule (BBS) for MNB at KM 60+635. SNHPL
138 LASA/NH-87/P-2/SNHPL/2018/137 19.07.2018 Design & Drawing for MNB at Design Chainage km. 60+635 ( CA CH.60+643 SNHPL

LASA to SNHPL
S.No Letter No. Dated Subject Address
220 LASA/NH-87/P-2/SNHPL/2018/223 08.12.2018 Compliance of Design and Drawing of MNB at Km. 62+425 SNHPL

SNHPL to LASA
S.No. Letter No. Dated Subject Address
82 Submission of Design & drawing of Abutment A1 & A2 for Minor Bridge at
SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0135 22.02.2018 Team Leader
KM 62+446

188
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0258 23.06.2018 Design and Drawing of Minor Bridge at KM 62+446 & 63+446 TL (LASA)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018 56+436 RHS for Construction of Minor Bridge at km;62+446 at PD-NHAI
km;60+643 &at km;56+450

LASA to SNHPL
S.No Letter No. Dated Subject Address

29.12.2017 Dismantling of the Structure of the Uttarakhand Seeds & tarai SNHPL
32 LASA/NH-87/P-2/SNHPL/2017/32 Development Corporation Limited from KM: 56+716 to KM: 56+970
128 LASA/NH-87/P-2/SNHPL/2018/127 04.07.2018 Design and Drawing for minor Bridge at Design chainage Km:56+430 SNHPL
215 LASA/NH-87/P-2/SNHPL/2018/218 30.11.2018 Compliance of Design and Drawing of MNB at Km 56+430 SNHPL

SNHPL to LASA
S.No. Letter No. Dated Subject Address

184
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0254 21.06.2018 Design and Drawing of Minor Bridge at KM 56+450 CA Chainahe TL (LASA)
201
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0276 9.07.2018 compliance of design and drawing of MNB at KM- 56+430 TL (LASA)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018 56+436 RHS for Construction of Minor Bridge at km;62+446 at PD-NHAI
km;60+643 &at km;56+450

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/509
15.02.2019 Submission of Design of MNB at Km. 56+430 and at Km. 57+400. J.P Das

SNHPL to LASA
S.No. Letter No. Dated Subject Address
Re-submission of Design and Drawing of Abutment A1&A2 for Minor
46 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0094 12.01.2018 Team Leader
Bridge at KM: 54+793, 57+415 & 58+440.
194 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0264 30.06.2018 Desgin and Drawing of minor Bridge at Km:52+910 and 57+400 TL (LASA)

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/365 31.10.2018 Shotdown for 11KV A/LT Lines at km;57+000 LHS . Team Leader

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/509
15.02.2019 Submission of Design of MNB at Km. 56+430 and at Km. 57+400. J.P Das

LASA to SNHPL
S.No Letter No. Dated Subject Address

11.01.2018 Submission of Design and Drawing of Abutment A1 & A2 for Minor SNHPL
37 LASA/NH-87/P-2/SNHPL/2018/37 Bridge at Km 54+793 & 57+415

Submission of third Party test Results of water,River Sand andd


Aggregate for source Approval Observation on GAD,Dimension and
162 LASA/NH-87/P-2/SNHPL/2018/162 21.08.2018 reinforcement Detaid of Minor Bridge at km:57+400 SNHPL
Observation on GAD,Dimesion and reinforcement detail of Minor Bridge
163 LASA/NH-87/P-2/SNHPL/2018/163 21.08.2018 at Km:57+400 SNHPL

LASA to SNHPL
S.No Letter No. Dated Subject Address
85 LASA/NH-87/P-2/SNHPL/2018/84 10.04.2018 Submission of Plan&Profile at KM 43+446 to 63+000 SNHPL
209 LASA/NH-87/P-2/SNHPL/2018/212 16.11.2018 FWD test for Improvement of Existing Road from Km. 63+400 to Km. 66+0 SNHPL
226 LASA/NH-87/P-2/SNHPL/2018/229 28.12.2018 Review of Design and Drawing for MNB at Km. 63+434 SNHPL
Notice under Article 16.1 of the Concession Agreement for de-scoping of
239 LASA/NH-87/P-2/SNHPL/2018/242 01.01.2019 Km. 63+400 to KM. 66+000( Elephant Corridor) SNHPL

SNHPL to LASA
S.No. Letter No. Dated Subject Address
117 Team Leader
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0176 09.04.2018 Submission of Plan & Profile at KM 43+446 to 63+000

188
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0258 23.06.2018 Design and Drawing of Minor Bridge at KM 62+446 & 63+446 TL (LASA)
Positive and Negative change of Scope for the works from km. 63+400 to
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/381 16.11.2018 66+000 BHS. Team Leader
COS
Date: 27.03.2019

IE Observation / Comments
S.No. Structure Type Description Chainage Letter Ref. No Date Letter No. Subject Date Remarks

Submission of Design and Observation on Design and


Drawing of Foundation and Drawing of Foundation and
1 ROB Substructure of Piers P1 & P2 60+050 SNHPL 528 25.02.2019 LASA 0284 Substructure of Piers P1 & 18.03.2019 SNHPL
for ROB at Ch. 69+050 P2 for ROB at Ch. 69+050

Submission of Design and Review of Design and


2 MNB Drawing for MNB at KM 63+434 63+434 SNHPL 258 23.06.2018 LASA 0229 Drawing for MNB at KM 25.12.2018 SNHPL
63+434

45+765,
46+228, PUP at KM 45+765, 46+228,
3 PUP 46+575, & LASA 0278 46+575, & 47+150 08.03.2019 SNHPL
47+150

Submission of design & drawing


of VUP at Km. 45+975 (Span 45+975 SNHPL 541 03.03.2019 IE
Arrangement- 4X16)
4 VUP
Submission of design &
drawing of VUP at Km. 46+873 SNHPL 543 IE
04.03.2019
46+873 (Span Arrangement-
4X16)
LASA to SNHPL
S.No Chainage Letter No. Dated
214 52+910 LASA/NH-87/P-2/SNHPL/2018/217 30.11.2018

S.No. Letter No. Dated


194 52+910 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0264 30.06.2018

SNHPL to LASA
S.No. Letter No. Dated
54 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0105 24.01.2018

58 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0110 30.01.2018

63 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0116 05.02.2018

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/476
02.02.2019
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/482 02.02.2019

LASA to SNHPL
S.No Letter No. Dated
22 LASA/NH-87/P-2/SNHPL/2017/22 24.11.2017
28 LASA/NH-87/P-2/SNHPL/2017/28 12.12.2017

16.01.2018
40 LASA/NH-87/P-2/SNHPL/2018/40
02.02.2018
57 LASA/NH-87/P-2/SNHPL/2018/57
148 LASA/NH-87/P-2/SNHPL/2018/148 03.08.2018
250 LASA/NH-87/P-2/SNHPL/2018/256 01.02.2019

SNHPL to LASA
S.No. Letter No. Dated
112
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0171 05.04.2018
132
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0193 28.04.2018
164
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0230 06.06.2018
166
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0232 07.06.2018
LASA to SNHPL
S.No Letter No. Dated

87 LASA/NH-87/P-2/SNHPL/2018/86 11.04.2018
102 LASA/NH-87/P-2/SNHPL/2018/101 14.05.2018
116 LASA/NH-87/P-2/SNHPL/2018/115 13.06.2018

170 LASA/NH-87/P-2/SNHPL/2018/170 31.08.2018

LASA to SNHPL
S.No Letter No. Dated
22.03.2018
69 LASA/NH-87/P-2/SNHPL/2018/69

172 LASA/NH-87/P-2/SNHPL/2018/172 31.08.2018

206 LASA/NH-87/P-2/SNHPL/2018/209 10.11.2018


222 LASA/NH-87/P-2/SNHPL/2018/225 14.12.2018

SNHPL to LASA
S.No. Letter No. Dated
46 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0094 12.01.2018

53 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0104 24.01.2018

106
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0165 02.04.2018
115
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0174 07.04.2018

212
SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0288 22.07.2018
SNHPL/R-K PKG-II/PO/FY/2018-19/NHAI/0336 06.10.2018

SNHPL/R-K PKG-II/PO/FY/2018-19/NHAI/0344 17.10.2018

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/484
04.02.2019

SNHPL to LASA
S.No. Letter No. Dated
183 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0253 20.06.2019

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018

197 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0269 05.7.2018

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018

LASA to SNHPL
S.No Letter No. Dated
138 LASA/NH-87/P-2/SNHPL/2018/137 19.07.2018

168 LASA/NH-87/P-2/SNHPL/2018/168 31.08.2018

169 LASA/NH-87/P-2/SNHPL/2018/169 31.08.2018


138 LASA/NH-87/P-2/SNHPL/2018/137 19.07.2018

LASA to SNHPL
S.No Letter No. Dated
220 LASA/NH-87/P-2/SNHPL/2018/223 08.12.2018

SNHPL to LASA
S.No. Letter No. Dated
82 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0135 22.02.2018
188 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0258 23.06.2018

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018

LASA to SNHPL
S.No Letter No. Dated

29.12.2017
32 LASA/NH-87/P-2/SNHPL/2017/32
128 LASA/NH-87/P-2/SNHPL/2018/127 04.07.2018
215 LASA/NH-87/P-2/SNHPL/2018/218 30.11.2018

SNHPL to LASA
S.No. Letter No. Dated
184 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0254 21.06.2018
201 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0276 9.07.2018

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/361 27.10.2018

SNHPL/R-K PKG-II/PO/FY2018-19/LASA/509 15.02.2019

SNHPL to LASA
S.No. Letter No. Dated
46 SNHPL/R-K PKG-II/PO/FY/2017-18/LASA/0094 12.01.2018
194 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0264 30.06.2018
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/365 31.10.2018
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/509 15.02.2019

LASA to SNHPL
S.No Letter No. Dated

11.01.2018
37 LASA/NH-87/P-2/SNHPL/2018/37

162 LASA/NH-87/P-2/SNHPL/2018/162 21.08.2018

163 LASA/NH-87/P-2/SNHPL/2018/163 21.08.2018

LASA to SNHPL
S.No Letter No. Dated
85 LASA/NH-87/P-2/SNHPL/2018/84 10.04.2018
209 LASA/NH-87/P-2/SNHPL/2018/212 16.11.2018
226 LASA/NH-87/P-2/SNHPL/2018/229 28.12.2018

239 LASA/NH-87/P-2/SNHPL/2018/242 01.01.2019

SNHPL to LASA
S.No. Letter No. Dated
117 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0176 09.04.2018
188 SNHPL/R-K PKG-II/PO/FY/2018-19/LASA/0258 23.06.2018
SNHPL/R-K PKG-II/PO/FY2018-19/LASA/381 16.11.2018
to SNHPL
Subject Dated RFI No.
GAD, Dimension and Reinforcement detail for MNBR at KM 52+910 06.12.2018 STR/2362

SNHPL to LASA
Subject
Desgin and Drawing of minor Bridge at Km:52+910 and 57+400

L to LASA
Subject
Submission of Bar Bending Schedule for Vehicle Underpass(VUP) at KM:
52+643.
Submission of Traffic Management Plan/Diversion for Construction of
VUP(RHS) at KM: 52+643
Resubmission of Traffic Management Plan/Diversion for Construction of
VUP (RHS) at KM: 52+643.
Submission of Comprehensive Traffic Diversion plan at VUP Ch. Km.
52+643
Submission of Drawing regarding extension of RE Wall at Km 52+643

to SNHPL
Subject
Construction of VUP at KM 52+643
VUP at KM 52+643
Traffic management Plan/Diversion for constuction of VUP (RHS) at KM
52+643
Submission of Traffic Management Plan/Diversion for Construction of
VUP (RHS) at KM: 52+643.
observation on the Reinforced Soil wall(VUP at-Km52+643
Submission of comprehensive Traffic Diversion plant at VUP ch.km 52+643

L to LASA
Subject
Submission of Revised Design & Drawing of Abutment A1&A2 for Minor
Bridge at KM 54+775
Submission of Revised Drawing and Bar Bending Schedule for Minor
Bridge at KM 54+775 RHS
Submision of Design & Drawing of Minor Bridge Median Wall at Km:
54+775
Submission of Bar Bending Schdule for Midian Wall minor Bridge at
Km:54+775
to SNHPL
Subject
Submission of Revised Design & Drawing of Abutment A1 & A2 for Minor
Bridge at KM 54+775
Review of Minor Bridge at KM.54+775
Design and Drawing for Median wall at KM 54+775
Submission of Bar Bending Schedule (BBS) for Minor Bridge at
Km:54+775

to SNHPL
Subject
pouring of Concrete of inadequate Slump in Raft of Minor Bridge at KM
58+440 A2 (Kathgodam site

Submission of Design and drawing of RCC T- Girder, CUM PTFE BEARING


&ELASTOMERIC PAD and Abutment Cap of Minor Bridge at Km:58+440
Submission of Design and Drawing POT CUM PTFE bearing for Minor
Bridge at Km:58+440
Compliance of Design and Drawing of MNB at Km. 58+440

L to LASA
Subject
Re-submission of Design and Drawing of Abutment A1&A2 for Minor
Bridge at KM: 54+793, 57+415 & 58+440.
Submisson of Bar Bending Schedule Abutment A1&A2 for Minor Bridge at
KM: 58+440.
Submission of Design & Drawing of Median Wall for Abutment A1 & A2
Minor Bridge at KM 58+440
Submission of Revised drawing of Abutment A1 & A2 for Minor Bridge at
Km 58+440

Submission of Design and Drawing of RCC T-Girder, POT CUM PTFE


Bearing & Elastomeric PAD and Design Of Abutment Cap of Minor Bridge
at Km. 58+440
Submission of Design and Drawing of POT CUM PTEE Bearing fpr Minor
Bridge at KM 58+440
Submission of Design and Drawing of Preeastre RCC T Girder Super
Structure of Minor Bridge at KM 58+440

POT PTFE Bearing testing for MNB 58+440 at Dynamic Prestressing Pune

L to LASA
Subject
Design and Drawing of Minor Bridge t KM 60+643(CA Chainage)
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
56+436 RHS for Construction of Minor Bridge at km;62+446 at
km;60+643 &at km;56+450
Submission of bar bending schedule for MNB at KM. 60+635
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
56+436 RHS for Construction of Minor Bridge at km;62+446 at
km;60+643 &at km;56+450

to SNHPL
Subject
Design & Drawing for MNB at Design Chainage km. 60+635 ( CA CH.60+643)

Submission of Ber Bending Schedule (BBS) for MNB at KM 60+635.

Submission of Ber Bending Schedule (BBS) for MNB at KM 60+635.


Design & Drawing for MNB at Design Chainage km. 60+635 ( CA CH.60+643)

to SNHPL
Subject
Compliance of Design and Drawing of MNB at Km. 62+425

L to LASA
Subject
Submission of Design & drawing of Abutment A1 & A2 for Minor Bridge at
KM 62+446
Design and Drawing of Minor Bridge at KM 62+446 & 63+446
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
56+436 RHS for Construction of Minor Bridge at km;62+446 at
km;60+643 &at km;56+450

to SNHPL
Subject

Dismantling of the Structure of the Uttarakhand Seeds & tarai


Development Corporation Limited from KM: 56+716 to KM: 56+970
Design and Drawing for minor Bridge at Design chainage Km:56+430
Compliance of Design and Drawing of MNB at Km 56+430

L to LASA
Subject
Design and Drawing of Minor Bridge at KM 56+450 CA Chainahe
compliance of design and drawing of MNB at KM- 56+430
obstruction due to trees Standing at km; 62+446 &at km;60+635 &at km;
56+436 RHS for Construction of Minor Bridge at km;62+446 at
km;60+643 &at km;56+450
Submission of Design of MNB at Km. 56+430 and at Km. 57+400.

L to LASA
Subject
Re-submission of Design and Drawing of Abutment A1&A2 for Minor
Bridge at KM: 54+793, 57+415 & 58+440.
Desgin and Drawing of minor Bridge at Km:52+910 and 57+400
Shotdown for 11KV A/LT Lines at km;57+000 LHS .
Submission of Design of MNB at Km. 56+430 and at Km. 57+400.

to SNHPL
Subject
Submission of Design and Drawing of Abutment A1 & A2 for Minor
Bridge at Km 54+793 & 57+415

Submission of third Party test Results of water,River Sand andd


Aggregate for source Approval Observation on GAD,Dimension and
reinforcement Detaid of Minor Bridge at km:57+400
Observation on GAD,Dimesion and reinforcement detail of Minor Bridge
at Km:57+400

to SNHPL
Subject
Submission of Plan&Profile at KM 43+446 to 63+000
FWD test for Improvement of Existing Road from Km. 63+400 to Km. 66+000.
Review of Design and Drawing for MNB at Km. 63+434
Notice under Article 16.1 of the Concession Agreement for de-scoping of
Km. 63+400 to KM. 66+000( Elephant Corridor)

L to LASA
Subject
Submission of Plan & Profile at KM 43+446 to 63+000
Design and Drawing of Minor Bridge at KM 62+446 & 63+446
Positive and Negative change of Scope for the works from km. 63+400 to
66+000 BHS.