Name Date CHECK INSTRUCTION N CI.42.019.C

Author: VANSTEENKISTE R. 5/26/15 Department: TEMPERED WINDOWS


Review: VANDENBERGHE L. 5/26/15 Section: SPC CONTROL AFTER TEMPERATURE
Approval: VAN EENOO E. 5/26/15 Location: Production line hall 14 - 16
N SPECIFICATION REQUIREMENT MEANS OF PERFORMER FREK REMARK
MEASUREMENT
1 Bend within regulatory Measuring frame Robot/ 100% Data is stored on
limits SPC Manually SS//Nas01/infill form

Non-conforming pieces
are blocked in the red
2 Size within regulatory Robot/ 100% rejection zone
limits Measuring frame manual
SPC