Professional Documents
Culture Documents
AcceleratingElectrification BatterySharinginIndia
AcceleratingElectrification BatterySharinginIndia
AcceleratingElectrification BatterySharinginIndia
Background
The Indian automobile industry has seen a paradigm shift in fuel technology in the last 2 decades – from
ICE (Internal Combustion Engines) run on petroleum-based fuels to electric motors-based EV technology
Industry players have also warmed up to the promise of EVs in India. The 2-W and 3-W space in particular
is witnessing a sudden rise in electrification in shared mobility and commercial applications
3 Commercial Launch
With industry & functional expertise in CASE*, NRI India has undertaken ~16 xEV
projects, incl. GTM strategy for global OEM for battery sharing service launch
NRI India provided End-to-End Solution
Strategy Planning & Implementation
1 2 3
Concept Validation through
Business Feasibility Study Commercial Launch
Pilot Execution
Managed Planning & Implementation
Market study & Feasibility assessment Managed Planning & Implementation
to test technical and business
for 3W Battery swapping business: from for Commercial launch of battery
feasibility of pilot before the
as-is situation to deployment swapping solution
commercial launch
A Market Potential A Pilot Preparation A Market Assessment
3W Market study, User survey, battery OEM-Partner role finalization & Launch plan finalization basis market study
demand analysis and estimation negotiations, compliance check and and competitive analysis, demand/traffic
regulations study surveys
NRI India offers end-to-end solution in the form of GTM strategy, spanned
planning and subsequent implementation over a span of 3 years
Execution Timeline for E-3W Battery Swapping Solution Development
Year 1 Year 2 Year 3
3. Commercial Launch
Business Planning Infra
Market Assessment
Setup
Partnerships Development: 3W Service
OEM, Land Location, Electricity, O&M Launch
Activities undertaken by NRI India Copyright(C) Nomura Research Institute, Ltd. All rights reserved. 3
1 Business Feasibility Study
In the initial phase, NRI India assesses the battery sharing potential, undertaking
regulatory & compliance checks & network planning, to arrive at a deployment plan
Market Potential
1 Overall market study, city-wise demand estimation
Network Planning
4 Location assessment and planning for swapping infrastructure
Plan
1. Define Scope & 2. Research – Regulatory 3. Execution Readiness
Objectives & Competetion & Tools Preparation
Do
Act
Based on key learnings from PoC, NRI India has developed an end-to-end
strategic plan for implementation of battery swapping business set-up
NRI India’s new mobility team consists of a blend of Consulting & Industry
veterans with expertise across 16 xEV-themed engagements over the past 3 years
xEV Automotive Consultants and Key Leaders
• Brand Management (Connected Services/
• Business Strategy (Go-to Digitization)
Market Strategy/Customer • Analytics & Consumer
Themes Engagement) Insights
• Product Launches • Policy Analysis
• Product Marketing • Sales Strategy
20 Consultants
• Technology Strategy
OUR TEAM
• Automotive • Consumer products
• Electric & Shared Mobility • Luxury Consumer goods
Industry • Manufacturing • Technology
Expertise
• Energy & Infrastructure • Supply Chain & Fulfilment
• Retail
* CASE = Connected, Autonomous, Shared, Electric Copyright(C) Nomura Research Institute, Ltd. All rights reserved. 7