KONSINYERING PENYUSUNAN BAHAN DAN

KERTAS POSISI DELRI


DIREKTORAT LALU LINTAS DAN ANGKUTAN LAUT

Bogor, 12 Juli 2022


1. TTEG
Tanggal 18 s.d. 22 Juli 2022 di Intercontinental Kuala Lumpur
Hotel, Kuala Lumpur, Malaysia

• 13th Cooperation Forum under the Cooperative


Mechanism in the Straits of Malacca and Singapore
• 45th Tripartite Technical Expert Group (TTEG) between
the littoral States on Safety of Navigation and
Environment Protection in the Straits of Malacca and
Singapore
• 13th Projection Coordination Committee Meeting under
the Cooperative Mechanism in the Straits of Malacca
and Singapore
13th Cooperation Forum under the Cooperative Mechanism in the Straits
of Malacca and Singapore

Akan diselenggarakan pada tanggal 18 s.d 19 Juli 2022 dan


direncanakan Delri akan dipimpin oleh Dirjen Hubla. Agenda yang akan
dibahas ada 3 yaitu:
• Enhancing Safety of Navigation in the Straits of Malacca and
Singapore; Direktorat Jenderal Perhubungan Laut Mengajukan :
“Information Paper Amendments to the existing mandatory ship
reporting system in the Straits of Malacca and Singapore
(STRAITREP)” : Oleh Direktorat Kenavigasian
• Enhancing Marine Environmental Protection in the Straits of Malacca
and Singapore;
• Big Data and Artificial Intelligence application in the Straits of
Malacca and Singapore. Direktorat Jenderal Perhubungan Laut
Mengajukan : “Implementation of an integrated port service
system and data exchange in Indonesia” Oleh Direktorat Lalu
Lintas dan Angkutan Laut

INFO DARI SUBDIT 5


45th Tripartite Technical Expert Group (TTEG) FR
between the littoral States on Safety of Navigation and
Environment Protection in the Straits of Malacca and Singapore
Akan diselenggarakan tanggal 20 s.d 21 Juli 2022. Indonesia akan meyampaikan
beberapa presentasi :

Agenda 5: Status report yaitu:


• Aids to Navigation in the Straits of Malacca and Singapore (SOMS) oleh Direktorat
Kenavigasian
• Marine Casualties Affecting Traffic Movement oleh Direktorat KPLP
• Contravention of Rule 10 of the International Regulations for Preventing oleh Direktorat
Kenavigasian
• Voluntary Pilotage Services in the SOMS oleh Direktorat Kepelabuhanan

Agenda 6: Progress of the Co-Operative Mechanism on Safety of Navigation and Environmental


Protection in the SOMS. Report of the 12th Project Coordination Committee by Indonesia

Pertemuan juga akan melaksanakan Working Groups yaitu : Marine Electronic Highway in the
SOMS (MEH)
13th Projection
Coordination Committee
Meeting under the
Cooperative Mechanism in
the Straits of Malacca and
Singapore Akan diselenggarakan tanggal 22 Juli 2022. Akan ada 1
presentasi dari Indonesia yaitu:

• Straits Project 5 Replacement and Maintenance of Aids


to Navigation in the SOMS. Presenter dari Direktorat
Kenavigasian

6
2. BIMP EAGA
Kerja sama sub regional BIMP EAGA mencakup :
mencakup seluruh kesultanan Brunei Darussalam;
provinsi Kalimantan, Sulawesi, Maluku dan Papua
Barat di Indonesia; negara bagian Sabah dan
Sarawak dan wilayah federal Labuan di Malaysia;
dan pulau Mindanao dan provinsi Palawan di
Filipina.

Wilayah Indonesia yang menjadi anggota BIMP-


EAGA adalah Kalimantan Barat, Kalimantan
Timur, Kalimantan Selatan, Kalimantan Tengah,
Sulawesi Utara, Sulawesi Tenggara, Sulawesi
Selatan, Sulawesi Tengah, Sulawesi Barat,
Gorontalo, Maluku, Maluku Utara, Papua, dan
Papua Barat.
PFKKI, DITJEN HUBLA,
DITJEN HUBDAT, DITJEN
HUBUD
MEMORANDUM OF UNDERSTANDING ON
ESTABLISHING AND PROMOTING EFFICIENT AND
INTEGRATED SEA LINKAGES
Di tanda tangani oleh Menteri Perhubungan negara anggota BIMP
EAGA pada tanggal 2 November 2007 di Singapura.

1. Menetapkan 35 pelabuhan sebagai pelabuhan gerbang BIMP-EAGA,


yang akan digunakan untuk mempromosikan dan memfasilitasi
perdagangan maritim dan pergerakan orang di subkawasan tersebut.
2. Mengatur untuk melakukan langkah bersama untuk mempromosikan
dan mempertahankan perdagangan dan pariwisata maritim intra-
EAGA, memfasilitasi masuknya operator pelayaran dan investor, dan
memberikan hak eksklusif sementara untuk layanan pelayaran
perintis.
3. Mengembangkan dan memformalkan mekanisme yang akan
memungkinkan saling pengakuan dan pemantauan standar
keselamatan, persyaratan keamanan, perlindungan lingkungan, dan
pengawakan kapal dari kapal berukuran non-konvensional, yang saat
ini mendominasi jalur laut EAGA.
BIMP- EAGA Vision
2025 Mid Term
Review Task Force
Meeting 2022
(BEV 2025 MTR TFM
2022)

11
Jadwal dan Agenda Pertemuan (20 July)
Jadwal dan Agenda Pertemuan (21 July)
• Signing of joint declaration was held prior to the maiden voyage on 28
Para 11, 32. The MOU on Sea
April 2017 in Manila by the Transport Minister witnessed by the Leaders.
Linkages enabled the launch of
Maiden voyage was held on 30 April 2017 from Davao to Bitung by Super
the first ASEAN Roll-on Roll-off
Shuttle RoRo 12 (the Philippines) with capacity of 500 TEUS. Indonesia
(RoRo) service between Muara
flag vessels, KM Gloria 28 sailed to General Santos (Davao) from Tahuna
(Brunei Darussalam) and Labuan
(Manado) in 2020 in extension of the route. Though new scheme has
(Malaysia) in WBEC. In 2017, the
been proposed which is to include beyond EAGA points) by Reefer Line
Davao and General Santos
however no applicant was issued up to now. In ASEAN and BIMP EAGA
(Philippines) and Bitung
meetings, Indonesia together with the Philippines expressed their
(Indonesia) sea link was
commitment to maintain the sustainability of this route.
launched as part of the ASEAN
nautical highway.
• Indonesia in consideration for connecting the route to domestic route
Masukan dari SD 1 through Tol Laut and Perintis to support the commodities for export.
To support marine tourism within BIMP EAGA region and
beyond, Indonesia added Benoa, Bali. In connection to the
Para 12. BIMP-EAGA’s MOU on Sea Linkages is helping pandemic which hits the global cruise tourism, Indonesia
to further strengthen the port networks …. At the 23rd in the way to resumption cruise tourism post pandemic.
BIMP-EAGA Ministerial Meeting in November 2019 Indonesia also issued new policy to support yacht and
held in Kuching, Sarawak, three additional gateway cruise tourism which allow debarkation and embarkation
ports were added, namely Jolo Port, Siasi Port and of passenger at 10 ports for cruise (was 5 major ports).
Bulliluyan Port to promote and facilitate intra- and
extra-EAGA maritime trade and movement of people Adakah usulan selain Benoa?
including cruise tourism, i.e. links with Benoa Port in
Bali, Indonesia (extra-EAGA).
The ASEAN MOU on NCS was signed on 18 November
2018 in Bangkok, Thailand, in conjunction with
STOM/ATM. Indonesian NCS sail to ASEAN region and
Para 14 – 15. An MOU on Improvement of Safety beyond and Indonesia recognises NCS certificates
Standards and Inspection for Non-Convention Sized Ship issued by competent authorities from AMS (e.g the
(NCS) within ASEAN Member States for the operation of Philippines). Indonesian NCS mostly sails to Singapore
NCSs within BIMPEAGA is under discussion. Internal and Malaysia waters.
consultations on technical matters affecting the operation Masukan dari Dit. Kappel.
of NCSs within BIMP-EAGA are ongoing. Terkait ssafety kapal NCS BIMP
1. New shipping service within Greater Sulu–Sulawesi Corridor
(GSCC) has been proposed between Indonesia and Malaysia,
Tg. Silopo (West Sulawesi)-Sabah, Malaysia Shipping Service.
Para 17 – 18, 32 The development of
RoRo shipping and port services in After domestic consultation, Tg. Silopo needs a lot of
selected BIMP-EAGA ports has been improvement including port facilities and infrastructure,
recognized as an important component including CIQs (The port also not included in international list)
in promoting maritime connectivity. The and cargo handling utilities. The ports is in process of trestle
conduct of a study of the RoRo network maintenance which expected to be completed at the end of
in BIMP-EAGA, with the potential for 2022, therefore the operation of the port will be ceased until
forming part of an ASEAN RoRo network,
further notice. Further, Tg. Silopo will focused in domestic
has been identified as one of the 12
shipping to support the development of new capital city (IKN).
priority projects in the first Master Plan
on ASEAN Connectivity (MPAC). 2. Resumption of Manado/Tahuna-Davao Indonesia vessel, KM
Gloria 28 is an extension to support the Bitung-
Davao/General Santos as Manado is near to Bitung port.
Masukan dari Kemenko. Ekon However, as stated in any ASEAN and BIMP EAGA, Indonesia
dan PFKKI untuk tidak committed to continue the sustainability of the route by
melanjutkan Tg. Silopo – Lahad extend to other related route and not limited to certain type
Datu, Sabah vessels.
Para 38. Seaports infrastructure and facilities  Priority Infrastructure Projects (PIPs) port
improved. … By 2021, 18 seaport projects, development projects converge in the GSSC.
which include port development/new ports, Indonesia has completed the infrastructure of
expansion, and support port facilities, were Manado – Bitung Link (Manado Port
completed during 2017-2021 (Appendix 3). Expansion) dan Manado – Bitung Link (Bitung
Among the projects are Indonesia’s Manado- International Port Expansion).
Bitung Link which comprises the Manado Port • For port development of Makassar New Port,
Expansion and Bitung International Port Indonesia has completed phase 1a in 2018, and
Expansion, and Makassar New Port Phase 1A; … now under construction for phase 1b and 1c.

Masukan dari Kemenko Ekon,


PFKKI, Dit. Kepel, Pelindo

Apakah ada pembangunan


pelabuhan lain yang akan
dimasukkan ke PIPs?
Template: Rolling Pipeline of Projects 2 (2020-2022)
BEV 2025 Sector Strategic Priority Increased Multimodal (air, land and sea) transport connectivity, as appropriate, within and between the
priority economic corridors of Greater Sulu-Sulawesi Corridor (GSSC) and West Borneo Economic
Corridor (WBEC)
Project Title and Project 2020 -2022 Project Milestones and Timelines Deliverables in 2022 and
Information Outcome and Remarks
(including Convergence Projects Outputs Milestones Timelines Tasking (if any)
Include here: Outcome : The route has been 2022 and beyond Cross sectoral issues : • Resumption of route (to
a) Complete Title Established sea launched since 2017. Coordinating Ministry include beyond EAGA
Revival or Establish New Sea Routes connectivity There are some issues of Economic Affairs, points) by Reefer Line
: Davao/GenSan-Bitung Shipping between hamper the Ministry of • Resumption of route
Route Indonesia and sustainability of the Transportation, Ministry Manado/Tahuna - Davao
• Manado/Tahuna - Davao by the Philippines route, e.g lack of of Trade, Ship owners
Indonesia vessel, KM Gloria 28 demand, high freight Association,
b) Beneficiaries : rate, regulation. etc
MoT, local government, shipping Filipina reefer container
companies, etc company to sail the
c) Project duration and location route beyond BIMP
Bitung (ID) EAGA region. From
d) Project Implementation Team Indonesia, KM Gloria
(PIT) with complete contact 28 to sail the
information : Manado/Tahuna-Davao
DGST, MOT (cross sectoral) in 2020
Output 1 .
Template: Rolling Pipeline of Projects 2 (2020-2022)

BEV 2025 Sector Increased Multimodal (air, land and sea) transport connectivity, as appropriate, within and
Strategic Priority between the priority economic corridors of Greater Sulu-Sulawesi Corridor (GSSC) and West
Borneo Economic Corridor (WBEC)
Project Title and Project 2020 -2022 Project Milestones and Timelines
Deliverables in 2022
Information Outcome and
and Remarks
(including Convergence Outputs Milestones Timelines Tasking (if any)
Projects
Include here: Outcome : The route was proposed by 2022 and beyond Cross sectoral issues : • Resumption of new
a) Complete Title Established sea the local government as an Coordinating Ministry of route initiative
Tg. Silopo (West Sulawesi) – connectivity entry point for immigrants Economic Affairs, Local
Sabah, Malaysia Shipping between west workers. government, Ministry of
Service Sulawesi and In early 2020 before the Transportation, Ministry
b) Beneficiaries : Sabah - Malaysia border close, KM Cattleya of Trade, Ship owners
MoT, local government, Express serviced Parepare- Association,
shipping companies, etc Tanjung Silopo/Polewali- etc
c) Project duration and Lahad Datu and Tanjung
location Silopo/Polewali-Sandakan
Tanjung Silopo (west during the pandemic until
Sulawesi) February 2021.
d) Project Implementation Internal coordination is
Team (PIT) with complete needed to update the
contact information : local operational plan in 2022 and
government beyond.
Template: Rolling Pipeline of Projects 2 (2020-2022)

BEV 2025 Sector Increased Multimodal (air, land and sea) transport connectivity, as appropriate, within and
Strategic Priority between the priority economic corridors of Greater Sulu-Sulawesi Corridor (GSSC) and West
Borneo Economic Corridor (WBEC)
Project Title and Project Outcome 2020 -2022 Project Milestones and Timelines
Deliverables in 2022
Information and Outputs
Milestones Timelines Tasking and Remarks
(including Convergence
(if any)
Projects
Include here: Outcome : This inniative refers 2021 and beyond Cross sectoral issues : Database on intra and extra
a) Complete Title Sharing information MOU on Sea Linkages Ministry of EAGA maritime trade flows
Information Sharing on among BIMP EAGA Para 2.1 Transportation, Port and passenger movement,
Cargo and Passenger member state on Authority (CIQS) inventory of the facilities
Movement in BIMP-EAGA route maturity of Internal coordination is Ministry of Trade, Ship available, shipping services,
Gateway Ports (including cargo and passenger needed to get owners Association, port tariffs and key
number of/permit given to movement to further data/information of etc performance indicators.
NCSs operate in EAGA) enhance the role of cargo and passenger (including number of/permit
b) Beneficiaries : the Designated BIMP movement. given to NCSs operate in
MoT, local government, EAGA Gateway Ports EAGA)
shipping companies, etc in promoting and Establish database
c) Project duration and facilitating intra- inventory in the future,
location EAGA maritime trade if applicable
BIMP EAGA Gateway Ports and movement of
people
Output 1 .
Rolling Pipelines of Projects 2020-2022

BEV 2025 Sector Strategic Strategic Priority 2: Improved transport facilitation


Priority
2020-2022 Milestone and Timelines
Project/Initiatives Milestones Timelines Country Progress Update
(target completion) Lead/Tasking
1) MOU on Improvement of Internal consultation on 2022 and beyond MOT Indonesia Flag under Non Convention Vessel
Safety Standards and the technical matters Standard (NCVS) of Ministry Decree No. 65 Year
Inspection for Non- regarding the operation 2009 :
Convention Sized Ship of the NCSS within BIMP- The Ministry Decree No. 65 Year 2009 is under
(NCS) within ASEAN EAGA completed revision to accommodate new chapter of Safe
Member States Manning, Marine Pollution Prevention from Ships,
• Operation of the Ship Security Operational Management, Special
Non-Convention Purpose Ship, Novel Ship and Ship Fitness for
Sized Ships within various cargoes
BIMP-EAGA Mutual rerecognition of 2022 and beyond BIMP Indonesian vessels, particularly Indonesia
certifications issued by classification (for any vessel size not only limited
the relevant authorities for NCS), is not being recognise to enter Brunei’s
of the respective flag waters.
states and existing Particularly on para 3 of the ASEAN MOU on NCS,
verification should be the AMS should accept national certificate on NCS
apply in reciprocal Indonesia may invites Brunei to further discussion
manner on this matter with related agencies, if Brunei
agree
Priority Infrastructure Projects Updates and New Projects in RPoPs 2020-2022

BEV 2025 Sector Strategic Priority Strategic Priority 3 : Improved infrastructure and facilities at designated priority seaports,
airports and land routes
Estimated Implementation
Priority Infrastructure Implementation Progress
Project Cost rate/percentage Target Completion
Projects (Milestones in 2021)
(US$ Million) (in 2021)
1) Manado-Bitung Link 360 Optimalization of Port Facilitation Completed Completed in 2020
(Manado Port Expansion)
2) Manado-Bitung Link (Bitung 2,615 a) Construction of Berth (131x35 m2), Trestle • Complete Completed
International Port Expansion) (74x11,5 m2) and reclamation for Container Yard
(5 Ha).
b) Capacity up to 500.000 TEUs per year
c) Optimalization of Port Facilitation
3) Makassar New Port 98 (only for Phase 1-A) a) Phase 1-A completed • 100% (for Phase 1-A) • Phase 1a completed,
• Overall + 85% operational since 2018
b) Phase 1-B and Phase 1-C are under construction • Phase 1-B and Phase 1-C
c) Phase 1-D is under preparation stage are expected to be
• Preparing land; completed in 2023
• Consolidated area for railways;
• Preparing for toll road;
Rolling Pipelines of Projects 2020-2022

BEV 2025 Sector Strategic Priority Strategic Priority 4 : Strengthen project level convergence with the agribusiness , tourism, CIQS
and trade and investment sectors in the development of subregional supply/value chains and
logistics services and tourism-related transport connectivity

2022 Implementation Plan


Project/Initiatives
Concrete Deliverables Timelines Country Progress Updates
(target Lead/Tasking
completion)
1) Development of Cruise Tourism in BIMP- Cruise Facilities and 2021 and beyond BIMP • Exemption on cabotage policy in
EAGA Promotional Activities certain ports in Indonesia to
(Convergence initiatives with Tourism support the cruise tourism.
Cluster) Indonesia also rethinking to open
more ports
• development of Bali port to
support Bali to recover from the
pandemic expected to complete
in 2023
• Cruise Routes prepared for the
2022 Mandalika MotoGP
3. IMT GT
It currently includes the geographical areas of
a. 10 provinces of Sumatera in Indonesia which are
Aceh, North Sumatera, West Sumatera, South
Sumatera, Riau, Riau Island, Jambi, Bengkulu,
Bangka Belitung and Lampung.;
b. 8 States of peninsular Malaysia which are Perlis,
Kedah, Penang, Kelantan, Perak, Selangor, Negeri
Sembilan, and Melaka.; and
c. 14 Provinces in southern Thailand which are Krabi,
Nakhon Si Thammarat, Narathiwat, Pattani,
Phattalung, Satun, Songkhla, Trang, Yala, Chumphon,
Ranong, Surat Thani, Phang Nga, and Phuket.

The 14th IMT-GT Working Group Meeting on Transport


and ICT Connectivity direncanakan oleh Kemenhub
(PFKKI) akan diselenggarakan pada 25 Juni 2022 di
Medan, Sumatera Utara.

https://imtgt.org/country-information/
Project Update 2022
Objective 4. Enhanced maritime connectivity

Indicator 4.2. The Dumai-Melaka Ro-Ro ferry service is operationalised by 2023

Project Name Project Description Progress Estimated Implementer


Updates Cost

Dumai - Melaka Economic Upgrading port facilities to meet DED MoT has Ministry of
Corridors Multimoda international standard, infrastructure phase secure Transportation
Transport Project improvements, adding mooring and funding for
breasting capacity, expanding the port the
area in Bandar Sri Junjungan Port. renovation
of the port.

26
New Projects for the Second IB

New Palembang Port in Tanjung Carat

Project Project Progress Estimated Implement


Name Description Updates Cost er
Development of Is expected to USD 0,33 Ministry of
New Palembang accelerate million Transport
Port in Tanjung the ation
Carat improvement Rp.
• Stated on of 3.290.000.00
National connectivity 0.000
Priority Project and increase
New Palembang Port • B2B for first the
Tanjung Carat

choice or competitivene
Private Public- ss of national
Partnership logistics
USULAN KEGIATAN BARU
Penyusunan MOU Sea Linkages Konektivitas Laut Aceh (Sabang) - Andaman dan
• Penyusunan Memorandum of Understanding Nikobar
Between the Government of Indonesia, Malaysia, and • Rekomendasi Kemenko Ekon untuk membahas
Thailand on SEA LINKAGES. isu ini di WG Transport, menjadi salah satu
• Di BIMP EAGA ada MOU on SLWG tapi di IMT GT tidak sectoral project.
ada MOU serupa. • Ditlala : Rute ini dapat dikembangkan bukan
• Sebagai pertimbangan ada Memorandum of hanya Indonesia tapi dengan IMT GT, untuk
Understanding Between the Government of menciptakan demand. Diperlukan kajian dapat
Indonesia, Malaysia, and Thailand on air linkages dilakukan oleh ADB dan India
• MOU ini dapat digunakan sebagai payung MOU untuk • Adanya JTF Konektivitas Aceh – Nicobar dan
Dumai-Malaka Andaman (Dit. Asia Selatan dan Tengah,
Kemenlu).
Riviu kajian Dumai-Malaka dapat dilakukan oleh ADB • Perlunya kepastian terlebih dahulu, India resmi
• Kajian untuk mereviu kajian ASEAN-JICA : The Master Plan menjadi mitra wicara IMT GT
and Feasibility Study on the Establishment of an ASEAN RO- Masukan dari Kemenko Ekon,
RO Shipping Network and Short Sea Shipping Kemlu, PFKKI, Pelindo, INSA,
• Telah ada kajian tentang pelabuhan oleh Badan Litbang. SD 1
28
TERIMA KASIH