Estimate of Electric Motor 100hp
Estimate of Electric Motor 100hp
MUL/4161-15/SUPPLY Dated
SUPPLY ORDER
TO,
M/S
1. Kindly arrange to supply the above mentioned items as per quotation and rates approved and raise your
Chillan /Bill against it.
NOTE:-
a. The supply of goods in good new condition and according to the approved specification should reach for the
inspection within days of the issuance of this supply order.
B. Substandard or out of specification good what so ever will not be acceptable.
Rate Analysis
Total 75,000/-
CIVIL AVIATION AUTHORITY
REQUSITION FOR E&M WORK
MULTAN INT. AIRPORT
Detail Of Work: Provisioning & fixing/ Repairing of 100 HP electric motor in fire pump
room at MIAP
__________________________________
SIGNATURE
HEAD OF SECTION /BRANCH
…………………………………………………………………………………………………
1. The APM is pleased to issue the preliminary approval for the above noted
work to be met from disbursement budget during current financial year
2020-21
2. O.I/C E&M Multan is permitted to proceed with quotation action etc.
AIRPORT MANAGER
CAA Multan Int. Airport.
CIVIL AVIATION AUTHORITY
MULTAN AIRPORT
M/s --------------------------
--------------------------
--------------------------
QUOTATION
Sealed quotation are hereby invited by the undersigned from the approved contractors of
CAA for the following items of work. The quotation can be obtained from the office of the
understand which will be received by the undersigned on ------------ at 1100 hrs. and the same
will be opened on the same day at 1130 hrs.
S
Description of items Qty Rate Unit Amount
NO.
01 Repairing/fixing/ replacement of Main drive 01 job job
inverter EV2000 Series universal variable Speed
Drive of escalator replaced defective control
board and Aux Power supply and also replaced
/heat up parts, burnout components of PCB , I/C
cost of testing, diagnosis and troubleshooting
fault of drive Sigma OTS Escalator, after repair
check on electronic test bench on load as
required.
Re-programming and Synchronizing parameters
with all (PCBs) and also testing on simulator as
required.
S.
DESCRIPTION OF ITEMS QTY. RATE UNIT AMOUNT
NO.
01 Repairing/fixing/ replacement of Main drive 01 job Rs.40,000/- Job Rs.40,000/-
inverter EV2000 Series universal variable
Speed Drive of escalator replaced defective
control board and Aux Power supply and also
replaced /heat up parts, burnout
components of PCB , I/C cost of testing,
diagnosis and troubleshooting fault of drive
Sigma OTS Escalator, after repair check on
electronic test bench on load as required.
Re-programming and Synchronizing
parameters with all (PCBs) and also testing
on simulator as required.
TOTAL Rs.40,000 /-
APPROVED / NOT APPROVED BY THE C.F.A TOTAL
Estimate submitted for approval
WORK ORDER
NO.:___________________________________________________________
Certified that the subject work has been completed by the Contractor satisfactorily
Signature of user:______________________________
NAME:_______________________________________
Designation: ______________________________
Section:______________________________________
Date:_________________________________________
CIVIL AVIATION AUTHORITY
COMPARATIVE STATEMENT
Name Of Work: R/M E/M Works Services at Multan International Airport
Sub Head: Repairing of Inverter of Escalator at Domestic Departure MIAP
Estimated Cost M/S, Falcon Enterprises M/S, Malik Tanveer M/S, M.K Enterprises.
Sr.
Description of Items
No.
QTY Rate Unit Amount Contractor Multan Contractor Multan Contractor Multan
01 Repairing/fixing/ replacement of Rate Amount Rate Amount Rate Amount
Main drive inverter EV2000
01
Series universal variable Speed JOB Rs.40,000/- JOB Rs.40,000/ Rs.40500/- Rs.40500/ Rs.41000/- Rs.41000/- Rs.39,500/- Rs.39,000/
Drive of escalator replaced
defective control board and Aux
Power supply and also
replaced /heat up parts,
burnout components of PCB , I/C
cost of testing, diagnosis and
troubleshooting fault of drive
Sigma OTS Escalator, after repair
check on electronic test bench
on load as required. /-
Re-programming and
Synchronizing parameters with
all (PCBs) and also testing on
simulator as required.
required.