Manhole Electrical

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES :

1. ALL DIMENSION IN MILIMETERS


UNLESS SPECIFIED IN DRAWING
2. ELEVATION EXPECTED IN METERS
3. COORDINATES EXPECTED IN METERS
4. REQUIRED TO CONTRACTOR TO CHECK ALL DATA &
DRAWING BEFORE STARTED WORK

REV. DESCRIPTION DATE

PROJECT

PEMBANGUNAN
ELECTRIC KCC 1st FLOATH GLASS PROJECT
KAWASAN INDUSTRI TERPADU BATANG
Jl. Tol Semarang - Batang, Mangunsari, Kedawung,
Kec. Batang, Kabupaten Batang, Jawa Tengah
Kode Pos. 51271

OWNER
ELECTRIC

SECTION - A MANHOLE COVER


TOP VIEW MANHOLE ELECTRICAL 1 1 CHECKED & APPROVED BY :
1 SCALE A3 : 1/15 SCALE A3 : 1/15
SCALE A3 : 1/20 CONSTRUCTION MANAGEMENT

SIGNED DATE
CHECKED

DESIGN BY :
CONTRACTOR

CONSTRUCTION & INVESTMENT

DIAN ADI CAHYONO


PROJECT MANAGER
ELECTRIC
SIGNED DATE
APPROVED DWI. Y
CHECKED ANWAR SADAT
DRAWN RIAN SUHENDRA
DRAWING STATUS

SHOP DRAWING
MANHOLE COVER-SET
1
SCALE A3 : 1/15 BASE COVER
1
SCALE A3 : 1/15 MEP
DRAWING TITLE:

REFERENCE STATUS SCALE

1
SIDE VIEW MANHOLE ELECTRICAL
SCALE A3 : 1/20
DRAWING NUMBER SHEET

You might also like