Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

SOCIÉTÉ DE L’INGÉNIERIE DE

L’ENVIRONNEMENT ET DE L’ÉNERGIE

Rue de l’Argent, Immeuble Fatma, Les


www.i2e.com +216 71 192 415 i2e@i2e.com.tn +216 71 192 015
jardins du Lac, 1053 Tunis
Social reason : I2E
Head quarter : EPPM
Creation date : 02/19/1993
Legal form : Anonimous society

GENERAL Capital:
Address :
: 1,000,000 DT
Fatma building – Jardin de luc

INFORMATIONS 1053 Tunis- Tunisia


Phone : +216.71.192.015
Fax : +216.71.192.415
Mail : i2e@i2e.com.tn
Website : www.i2e.tn

2
I2E IN THE
WORLD

3
The Environment and Energy Engineering Company
(I2E) was created on the initiative of the Tunisian
Development Bank BDET and DHV Consultants BV
(Holland) in 1993. I2E, formerly DHV Tunisia, had
for mission to intervene in the environmental field
in North Africa on behalf of the parent company.

HISTORY In 2000, DHV Group joined forces with EPPM to


become equal partners in DHV Tunisia. In 2007, the

AND DHV group sold its shares to EPPM, therefore the


company took the name of I2E.

MILESTONES I2E has been involved for several years in the


environment and energy sector in Tunisia and
Africa. The quality of the work carried out and the
specialists it mobilizes for the studies entrusted to
it make it an increasingly well-known interlocutor
at the national and international levels.

4
We offer know-how to best meet the needs of our customers.
The most important areas of intervention of I2E are:

- Multidisciplinary Engineering
- Risk management Engineering,

BUSINESS -
-
Environmental management Engineering,
Air quality,

AREAS
- Urban and river hydraulics,
- Renewable Energy and petroleum resources,
- Solid waste
I2E offers know-how to best meet the needs of its customers
by:
- Technical assistance,
- Engineering studies,
- Advice and follow-up,
- Training & Works supervision

5
CERTIFICATION

03 Quality :ISO 9001

02 Environment : ISO 14001

01 Health and Safety:ISO 45001

6
References in Multidisciplinary Energy Sector Engineering

Master Text Detailed Engineering of gas lift


network upgrade to enhance oil
recovery of Nour Well (Eni -Tunisia -
2022)

7
References in Multidisciplinary Energy Sector Engineering

Master Text Detailed Engineering of new gas lift


network to enhance oil recovery of
DALIA Well (Eni -Tunisia -2022)

8
References in Multidisciplinary Energy Sector Engineering

Master Text Detailed Engineering of new gas lift


network to enhance oil recovery of
HAWA Wells (Eni -Tunisia -2022)

9
References in Multidisciplinary Energy Sector Engineering

Master Text Detailed Engineering for the


construction of a new lighting
system for the DJBEL GROUZ
station (Eni -Tunisia -2022)

10
References in Multidisciplinary Energy Sector Engineering

Master Text The QRA study of the


TAZARKA station (Eni -
Tunisia -2021)

11
References in Multidisciplinary Energy Sector Engineering

Master Text Engineering for the


construction of explosion-
proof walls in the OUED
ZAR station (Eni -Tunisia -
2021)

12
References in Multidisciplinary Energy Sector Engineering
Master Text

Detailed Engineering for the construction


of a new oil and gas processing station
(Sodeps - Tunisia - 2021)

13
References in Multidisciplinary Energy Sector Engineering
Master Text Detailed Engineering of the
construction and installation of new
water and oil loading arms in the
TAZARKA station (Eni - Tunisia -
2020)

14
References in Multidisciplinary Energy Sector Engineering
Master Text

Engineering for the connection of the 10


MW photovoltaic power plant to the
STEG network (SEREE - Tunisia - 2020)

15
References in Multidisciplinary Energy Sector Engineering
Master Text Detailed Engineering of the Gas
Lift connection in Baraka
platform (Eni Tunisia – 2020)

16
References in Multidisciplinary Energy Sector Engineering
Master Text
Development of a computer-aided
maintenance management system
for all onshore and offshore
stations (Eni - Tunisia - 2019-2020)

17
References in Multidisciplinary Energy Sector Engineering
Master Text Engineering of the installation
of an emergency shutdown and
depressurization system in the
DJBEL GROUZ station (Eni -
Tunisia - 2019)

18
Main Projects in Multidisciplinary Engineering During Last 5 Years
CONSTRUCTION OF WASTE WATER PUMPING STATION IN TAZARAK CITY GAS LIFT NETWORK UPGRADING IN ADAM CONCESSION EPC OF MAAROURA PLATFORM DEVELOPMENT PHASE II
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 05/2022– UP TO DATE (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 03/2022– 06/2022 (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 03/2021– 10/2021
Project Description: Project Description: Project Description:
Within the sustainable development program, ENI TUNISIA intends to construct a new water pumping ENI TUNISIA BV intends upgrade the old gas lift network by connecting new wells through 20 Km of ENI TUNISIA BV intends to develop its offshore production in MAAMOURA Platform, I2E mission is to
station energized by photovoltaic system. buried pipeline. conduct the detailed engineering and technical evaluation of equipment to be purchased in order to
DESIGN OF FLARE STACK AND FLARING NETWORK IN MLD CONCESSION NEW 8-inch FLOWLINE CONSTRUCTION BETWEEN HAWA AND NOUR MANIFOLDS connect the new wellhead.
(I2E/ SOCIETE DE DEVELOPPEMENT ET D'EXPLOITATION DU PERMIS DU SUD) 05/2022– UP
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 03/2022– 06/2022 ATEX ADEQUACY STUDY OF OIL CENTER OF EL BORMA OIL FIELD
TO DATE Project Description: (I2E / LA SOCIETE ITALO-TUNISIENNE D'EXPLOITATION PETROLIERE) 11/2020– 04/2021
Project Description: ENI TUNISIA BV intends to upgrade its wells gathering system by the construction of a new 8-inch Project Description:
SODEPS intends to conduct detailed engineering package to construct a new a flare system (PSVs, flowline SITEP intends to check the ATEX adequacy of their installed equipment in EL BORMA oil Field.
Blowdown valves, piping network, KO Drum, Flare stack)
GAS STATION EMERGENCY BLOWDOWN SYSTEM UPGRADING IN OUED ZAR FIELD EPC OF NEW OIL AND WATER LOADING ARMS IN TAZARKA CPF
DETAILED ENGINEERING OF FUEL GAS NETWORK UPGRADING (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 02/2022– 04/2022 (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 12/2018 – 04/2021
(SCOGAT) 06/2022– 08/2022 Project Description: Project Description:
Project Description: ENI TUNISIA BV intends to upgrade the emergency blowdown system of OUED ZAR gas station by In order to upgrade the capacity of stabilized oil and produced water loading in TAZARKA CPF, ENI
SCOGAT intends to upgrade the fuel gas alimentation network of new turbines to be installed in installing new restriction orifices and replacing blowdown piping system with low temperature carbon TUNISIA BV intends to construct tow loading arms.
Feriana plant to match the new turbines specification steel material. Equipment technical Evaluation, Detailed Engineering (IFC) for installation works, and construction
DETAILED ENGINEERING OF TK3 TURBINE REPLACEMENT QUANTITATIVE RISK ASSESSMENT FOR TAZARKA CPF works supervision was conducted by I2E team.
(SCOGAT) 01/2022– UP TO DATE (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 10/2021– 02/2022 NEW FIREFIGHTING SYTEM INSTALLATION IN DJBEL GROUZ FIELD
Project Description: Project Description: (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 02/2020 – 12/2020
SCOGAT intends to replace of the existing TK3 turbine in the Feriana plant with a new low emission ENI TUNISIA BV intends to upgrade its firefighting system installed in DJBEL GROUZ FIELD, the mission Project Description:
unit with "Dry Low Emission" (DLE) technology. is making an assessment of the actual system and prepare the detailed engineering for upgrade. ENI TUNISIA BV intends to install new firefighting system in DJEBEL GROUZ Field.
DESIGN OF GAS REFREGIRATION AND DEHYDRATION UNIT IN MLD CONCESSION EPC OF NEW CPF IN MLD CONCESSION ESD BD and DC SYSTEMS INSTALLATION IN DJBEL GROUZ AND OUED ZAR BROWN FIELDS
(I2E/ SOCIETE DE DEVELOPPEMENT ET D'EXPLOITATION DU PERMIS DU SUD) 05/2022– UP
(SODEPS 08/2021– UP TODATE (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 03/2020 – 11/2020
TO DATE Project Description: Project Description:
Project Description: SODEPS intends to construct a new CPF in order to handle the new production in MLD concession ENI TUNISIA BV intends to install an appropriate emergency shutdown, blowdown and distributed
SODEPS intends to install chilling and dehydration units in its MLD field to valorize the flared gas. All the detailed engineering for the construction is handled by I2E. control systems in OUED ZAR and DJEBEL GROUZ Field.
OIL STORAGE TANKS BOTTOMS REPLACEMENT IN OUED ZAR FIELD
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 05/2022– UP TO DATE FIREFIGHTING SYSTEM UPGRADE IN DJBEK GROUZ FIELD CONSTRUCTION OF PHOTOVOLTAIC SYSTEM FOR THE ADIMINSTRATION BULDING IN TAZARKA
Project Description: PLANT
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 05/2021– 12/2021
ENI TUNISIA BV intends to replace corroded old bottoms of tow storage tanks according API standards. (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 02/2019 – 3/2019
Project Description:
ENERGY EFFECIENCY AUDIT AND DIAGNOSIS OF OUED ZAR PLANT ENI TUNISIA BV intends to upgrade its firefighting system installed in DJBEL GROUZ FIELD, the mission Project Description:
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 03/2022– UP TO DATE is making an assessment of the actual system and prepare the detailed engineering for upgrade. ENI TUNISIA BV intends to construct a photovoltaic system to energize its offices in TAZARKA plant.
Project Description: CONTROL CABINS SAFETY RELOCATION, FIRE AND BLAST PROTECTION WALLS DESIGN IN OUED I2E task is to study the location, electrical, structural design and connections and civil works.
ENI TUNISIA BV intends to conduct an energy efficiency diagnosis of its plant located at OUED ZAR ZAR FIELD CMMS (SAP) DEVELOPMENT FOR SOUTH AND NORTH FIELDS- SAFETY CRITICAL EELEMENT
GAS DISPERSION STUDY IN HASDRUBAL PLATFORM (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 04/2021– 10/2021 PREVENTIVE MAINTENANCE PACKAGES
(I2E /Shell BG Groupe - APO) 05/2022– 06/2022 Project Description: (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 01/2019-06/2020
Project Description: ENI TUNISIA BV intends to assess and relocate or protect, by fire and blast walls, the control cabins Project Description:
SHELL/APO intends conduct a dispersion study of vented gas from pressurized vessels in HASDRUBAL which are subject to high jet fire radiation and overpressure thresholds. the mission was to simulate ENI TUNISIA BV intends developing CMMS (computerized maintenance management system) to
offshore platform in order to optimize the design of cold vent line. the major accident scenarios, assessment of cabin locations, relocation and protection study, fire and manage maintenance activities in southern and northern sites (OUED ZAR CPF, DJBEL GROUZ,
INSTALLATION AND CONNECTION OF NEW NITROGEN UNITS IN TAZARKA PLANT blast walls design. HAMMOUDA, EL BORMA and TAZARKA).
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 05/2022– 07/2022 FEED OF FIRE AND GAS SYSTEM INSTALLATION IN DJBEL GROUZ FIELD Preventive maintenance packages were established for safety critical elements defined during
Project Description: workshops.
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 06/2021– 09/2021
ENI TUNISIA BV intends to install and connect two new nitrogen units in its plant in TAZARKA, the INSTALLATION OF NEW LIFE RAFT IN BARAKA OFFSHORE PLATFORM
Project Description:
project aim is to issue all detailed engineering interfacing documents. ENI TUNISIA BV intends to install a fire and gas system in DJBEL GROUZ FIELD, the mission is to develop (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 09/2019 – 10/2019
CONSTRUCTION OF NEW ECOLOGIC SCHOOL IN KORBA CITY the FEED, EPC planning, cost estimation and technical evaluation of tenders. Project Description:
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 02/2022– UP TO DATE TECHNICAL EVALUATION OF NEW TEG UNIT TENDERS ENI TUNISIA BV intends to install a new inflatable life raft in Baraka platform.
Project Description: I2E task is to study the location, structural connections and civil works.
(SODEPS) 04/2021– 08/2021
Within the sustainable development program, ENI TUNISIA intends to construct a new ecologic school
Project Description:
based on photovoltaic energy and rain water reuse. SODEPS intends to install a TEG unit to treat their gas in LPT LAARICH
The technical evaluation of received tenders was conducted by I2E.
Main Project in Multidisciplinary Engineering During Last 5 Years
SAFETY RELOCATION OF VERTICAL FLARE FROM OUED ZAR FIELD TO DJBEL GROUZ FIELD LAARICH GAS VALORIZATION
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 05/2019 – 07/2019 (I2E / SODEPS) 12/2017 – 04/2018
Project Description: Project Description:
ENI TUNISIA BV intends to relocate a vertical flare from OUED ZAR Field to DJBEL GROUZ field. A As part of SOUTHERN PERMIT DEVELOPMENT AND OPERATIONS COMPANY (SODEPS) strategy to
detailed engineering for the new location, connections and civil works was conducted by I2E valorize the flared gas in order to sale it to the NATIONAL ELECTRICITY PRODUCTION COMPANY (STEG),
this project involves the construction of:
TATAOUINE 10 MW GREENFIELD SOLAR PHOTOVOLTAIC EPC PROJECT MONITORING
- A gas recovery pipeline network relating three stations: LAARICH CPF, LPT-A#1 and LPT-AE#1
(I2E / SOCIETE ENERGIES RENOUVELABLES ENI ETAP) 03/2019 – 12/2020
- A 6-inch recovered gas expedition pipeline from LPT-AE1 to the SITEP station E406-1.
Project Description:
The Tunisian – Italian renewable energy company SEREE intends to construct a 10 MW solar OUED ZAR CPF OPERATING MANUAL
photovoltaic plant in the desert of TATAOUINE. (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 12/2017 – 02/2018
I2E is charged to review the EPC contractor documents and ensure that the Detailed Engineering Project Description:
package (Electric, Instrumentation, civil, HSE, commissioning and quality) meet the ENI requirements, The project department of ENI TUNISIA requested to issue and update the operating manual for all
the national and the international standards. functional units in OUED ZAR CPF.
NEW API SKIMMER AND SECOND STAGE SEPARATOR IN DJBEL GROUZ PLANT
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 11/2018 – 01/2019 HAZARD AND RISK ASSESSMENT STUDY OF THE BIOGAS COGENERATION FACILITIES
Project Description: (I2E / THE NATIONAL PURIFICATION OFFICE) 11/2017 – 01/2018
ENI TUNISIA BV intends to replace the old API skimmer and second stage separator in DJBEL GROUZ Project Description:
plant to optimize the oil/water separation process. A Hazard and Risk Assessment study of the biogas cogeneration facilities carried out on behalf of ONAS
I2E have to prepare the basic engineering package to set up the new equipment and making all the (The National Purification Office) for the WTP SE4 NABEUL in TUNISIA, to respond quickly and
necessary process, electrical, instrument and piping modifications to optimize the process of oil/water effectively to emergency situations.
separation. OUED ZAR HAZOP-SIL WORKSHOP
FIREFIGHTING STUDY FOR THE BIOGAS TREATMENT AND COGENERATION FACILITIES (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 11/2017-12/2017
(I2E / NATIONAL PURIFICATION OFFICE) 11/2018 – 12/2018 Project Description:
Project Description: Hazard and operability study (HAZOP) of existing process and operations related to OUED ZAR facilities
A Firefighting Study of the biogas treatment and cogeneration facilities carried out on behalf of ONAS in order to identify and evaluate problems that may represent risks to personnel or equipment.
(The National Purification Office) for the WTP SE4 NABEUL in TUNISIA. DJBEL GROUZ HAZOP-SIL WORKSHOP
NEW API SKIMMER IN OUED ZAR PLANT – DETAILED ENGINEERING MONITORING (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 11/2017
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 09/2018 – 05/2019 Project Description:
Project Description: Hazard and operability study (HAZOP) of existing process and operations related to DJBEL GROUZ
ENI TUNISIA BV intends to install a new API skimmer in the OUED ZAR plant. I2E shall review the facilities in order to identify and evaluate problems that may represent risks to personnel or
supplier's documents and ensure that the Detailed Engineering package (process, Electric, equipment.
Instrumentation, civil, piping, mechanics and HSE) meet the customer's requirements and NOISE MEASUREMENT AND MAPPING CAMPAIGN
specifications. (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 10/2017- 11/2017
NEW OILY WATER TREATMENT UNIT IN TAZARKA Project Description:
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 07/2018 – 12/2018 The HSE department requested to elaborate the noise dispersion maps in DJBEL GROUZ, EL AZEL, EL
Project Description: BORMA, HAMMOUDA, stations and in OUED ZAR CPF.
Within the framework of the produced water treatment process upgrading, Eni TUNISIA B.V is planning ATEX STUDY OF OUED ZAR WELLS
to install a new OWT (Oily Water Treatment) Unit based on the Dissolved Gas Floatation technology (I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 08/2017 – 02/2018
in TAZARKA CPF. Project Description:
AS BUILT DOCUMENTS ISSUING OF DJBEL GROUZ CPF The HSE department of ENI TUNISIA requested to issue ATEX study and area classification plans of all
(I2E / ENTE NAZIONALE IDROCARBURI TUNISIA BV) 02/2018 - 08/2018 of OUED ZAR wells (47 wells). For this, a site visit and topography survey of the 47 wells was performed
Project Description: to collect necessary data for as built general arrangement drawings elaboration.
The project department of Eni TUNISIA requested to issue and update process and mechanical
documents for all units in DJBEL GROUZ CPF. A site visit included a multi-disciplinary team to collect
data and take all necessary measurements.
THANK YOU

21

You might also like